Professional Documents
Culture Documents
Case Study 2
Case Study 2
Overview: Phase I
In this case study, we’ll take a look at a conventional flat which has been completely
automated using only Loxone Air.
Project Details:
Location: Barcelona
Size: 75 m²
Technology Used: Loxone Air