“Ready to Fit”

Kit to upgrade Power control Installations

Datasheet

air circuit-breaker
• Saves production loss – reduced downtime
• Minimum investment
• Easy upgradation s
Any electrical installation has inconceivable without You can replace following
low voltage switchboard with communication technology. Circuit breakers by 3WL:
Air circuit breaker installed However, the age-old circuit • 3WE 48 /58 /72*
sometimes even more than 10 breakers can’t satisfy today’s • CN CS
– 15 years back. Even though demands. Hence, you need
there is a need to replace / modern air circuit breaker. • C power*
upgrade these ACBs, you have • 3WB
Siemens offers you “ The art
been postponing it due to
of Intelligent Simplicity – • Any other makes of circuit
long downtime involved and breakers.*
3WL” which has compact
also due to fear of not getting
design, ease of maintenance,
the appropriate upgradation
permissible ambient
from the fabricator.
temperature of 55 Deg C,
Now it is possible to upgrade front accessories, optional
Low voltage Air circuit metering, profibus
breaker panels without connectivity etc, which even
having to worry about the exceeds your today’s needs.
long down- time and quality
To upgrade your low voltage Air
of the modification done.
circuit breaker panels, Siemens
Further, the demand for
supports you with “Ready to
communications-capable
Fit” kit. The state of the art –
systems, data transparency,
“Ready to Fit” helps you to
and flexibility in industrial
replace your old circuit breaker
automation systems are
by 3WL without drilling a single
growing all the time. Bus
additional hole to match the
system and intelligent
mounting or busbar
switchgear systems can meet
terminations.
these demands, since
industrial and building
management are now “ Ready to Fit” Kit for 3WE Circuit Breaker

Benefits:
• All benefits of 3WL like compact
dimensions, no deration till 55 Deg
C, ease of maintenance, front
accessories, profibus
communication, CubicleBUS etc.
• No extra drilling of holes for
foundation and busbar
terminations.
3WE retrofitted by 3WL • Quality termination.
• Reduce down time by more than
50 %, for retrofitting.
• Minimal investment.
• Clean and branded solutions
without sacrificing quality.
* Conditions apply

Siemens Ltd.
Automation and Drives Division
LV Control & Distribution Products 3WE retrofitted by 3WL
Thane Belapur Road
Thane 400601
Fax : +91 22 27623729
E-mail : AD.CDPM@kwa2.siemens.co.in Order No.:

Siemens Ltd. Product upgradation is a continuous process. Hence, data


in this datasheet is subject to change without prior notice.
SGR-01-115- For the latest information, please get in touch with our Sales
Offices.

You might also like