Total
Total (344,459,027,710.14)
Karawang Precast 29,539,363,440.80 29,539,363,440.80 0.00
Karawang Beton 19,223,095,237.28 19,223,095,237.28 0.00
Cibitung Precast 75,100,421,482.30 74,908,196,482.26 192,225,000.04 159,825,000.04
Cibitung Beton 53,958,315,554.62 53,958,315,554.62 0.00
Cikarang Precast 18,878,719,046.30 18,878,719,046.00 0.30
Cikarang Beton 18,446,641,289.61 18,446,641,289.14 0.47
Surabaya Precast 43,494,986,953.25 43,494,986,953.25 0.00
Surabaya Beton 27,469,187,127.08 27,469,187,127.08 0.00
Manyar Precast 37,332,006,444.39 37,332,006,444.39 0.00
Manyar Beton 21,016,291,134.51 21,016,291,134.50 0.01
Cilacap Sub Structure 0.00 0.00 0.00
Cibitung Building 0.00 0.00 0.00
Cibitung Infrastructure 0.00 32,400,000.00 (32,400,000.00)
Cikarang Infrastructure 0.00 0.00 0.00
Cikarang Sub Structure 0.00 0.00 0.00
Karawang Building 0.00 0.00 0.00