Professional Documents
Culture Documents
Table
Table
Table
Total
Total (414,804,224,107.96)
Kantor Pusat PCI (71,322,325,149.42) 2,455,968,022.23
Karawang Precast (29,699,452,540.80) 45,124,139,412.90
Karawang Beton (19,223,095,237.28) 18,693,550,151.63
Cibitung Precast (75,086,909,582.30) 75,910,490,546.61
Cibitung Beton (53,958,315,554.62) 51,260,013,259.05
Cikarang Precast (18,900,429,046.30) 20,220,100,531.70
Cikarang Beton (18,446,641,289.61) 16,614,760,364.76
Surabaya Precast (43,494,986,953.25) 47,069,428,468.92
Surabaya Beton (27,469,187,127.08) 28,389,056,563.54
Manyar Precast (37,332,756,444.39) 34,979,941,620.23
Manyar Beton (21,016,291,134.51) 22,096,621,007.93
Cilacap Sub Structure 0.00 #N/A
Cibitung Building 14,200,000.00 28,000,000.00
Cibitung Infrastructure 0.00 41,577,000.00
Cikarang Infrastructure 4,862,000.00 915,120.00
Cikarang Sub Structure 5,900,000.00 2,158,400.00
Karawang Building 0.00 #N/A
Karawang Sub Structure 0.00 3,000,000.00
Surabaya Building 1,214,113,423.60 132,026,000.00
Surabaya Sub Structure (92,909,472.00) 287,438,000.00
532718233.xls