Calculation and Design Touch and Step Voltage
Calculation and Design Touch and Step Voltage
Calculation and Design Touch and Step Voltage
Ks
Simplifying: Em := k ⋅ cm⋅ Km and Es := k ⋅ cs
0.90
Where: ρKi⋅ IG 1 1
k := cm := cs :=
Lc 1.25 0.90
Et k ⋅ cm⋅ Km fm
• Voltage ratio = =
Es k ⋅ cs⋅ Ks fs
⎡ ⎛ D2 ⎞ ( D + h ) 2 h ⎤ ⎥⎤
⋅ ln⎡⎢
cm 1 8
fm( D , d , h , n ) := ⋅ ⎢ ln⎜ + − + ⎥
2π ⎣ ⎝ 16h ⋅ d ⎠ 8D⋅ d 4d 1 + h ⎣ π ⋅ ( 2n − 1 ) ⎦ ⎦
fs( D , h , n ) :=
cs
⋅ ⎡⎢
1
+
1
+
1
(1 − 0.5n−2)⎥⎤
π ⎣ 2h D+ h D ⎦
For :
For analysis purpose, let us consider a typical substation site with the following characteristics: 100 ft
Range of distance of
Lx := 100ft max length of grid in x direction Dmin := 5ft parallel conductors in
the ground grid.
Ly := 100ft max length of grid in y direction Dmax := 30ft 100 ft
Page 1 of 14
αβε
Ratio of Max Step & Date: 11/3/2005
Page 2 of 14
Touch Potentials
6
70
63
Ratio of Etouch max to& Estep max
56
49
42
35
28
21
14
0
5 10 15 20 25 30 35
Spacing grid parallel conductors, D (ft)
40
20
0
5 10 15 20 25 30 35
Spacing grid parallel conductors, D (ft)
n=9
n = 11
n = 15
Page 2 of 14
αβε
Ratio of Max Step & Date: 11/3/2005
Page 3 of 14
Touch Potentials
90
80
Ratio of Etouch max to& Estep max
70
60
50
40
30
20
10
0
5 10 15 20 25 30 35
Spacing grid parallel conductors, D (ft)
45
40
Ratio of Etouch max to& Estep max
35
30
25
20
15
10
5 1
0
5 10 15 20 25 30 35
Spacing grid parallel conductors, D (ft)
n=9
n = 11
n = 15
Page 3 of 14
αβε
Ratio of Max Step & Date: 11/3/2005
Page 4 of 14
Touch Potentials
10 8 6 4 2 0 2 4 6 8 10
4.5
4
3.5
3
2.5
2
1.5 1
1
0.5
FIG 3 B
2
1.8
1.6
1.4
1
1.2
1
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5
Spacing grid parallel conductors, D (ft)
n=9
n = 11
n = 15
FIG 3 C
Page 4 of 14
αβε
Ratio of Max Step & Date: 11/3/2005
Page 5 of 14
Touch Potentials
CONCLUSIONS:
1. For standards regular substation site with insulated surfacing materials and parallel grid conductors distance
larger than 2 ft approximately, the max actual touch voltage is always higher than the max. actual step
potential.
Emax > Emax
touch step
2. For the condition with parallel grid conductors too close (D< 2 ft approx) ground saturation is evident.
3. Although unusual, may be cases with substation surface with high conductivity (low resistivity) such as wet
concrete slab, metallic platform etc, the allowable touch and step potentials approaching to the same value .
116
Etouch = Estep = (Approx.)
50kg 50kg
t
NOTE: If shoes resistance is considered in the model, the allowable step potential is somehow higher than the touch potential.
4. Negative grid distances may not have real physical applications or interpretation.
For cases with very close grid and top layer with high conductivity, the step potential may be slighter higher than
the touch potential.
Page 5 of 14
αβε
Ratio of Max Step & Date: 11/3/2005
Page 6 of 14
Touch Potentials
- h is the depth of ground grid conductors (m). ............ h= 0.30 m (~12 in) & h=0.46m (~1.5ft)
-d is the Diameter of grid conductor, m. .................................... 4/0 AWG & 2/0 AWG
-D is the Spacing between parallel conductors, ( m). ............ 1.5 m (~5 ft) <D< 9m(~30ft)
Kh = (1+h)1/2
- n is the Geometric factor composed of factors For analysis lets use n = 9,11 &15
~ Lc+1.64LR
Where
Considering a reasonable substation site of Lx=100ft & Ly= 100 ft
LM := 1.25L
Lc Approx . see attachment B
Page 6 of 14
αβε
Ratio of Max Step & Date: 11/3/2005
Page 7 of 14
Touch Potentials
ATTACHMENT B:
3 ⎡ ⎛ LR ⎞ ⎤
Ls := Lc⎢ 1 + 1.13⋅ ⎜ ⎥
4 ⎣ ⎝ Lc ⎠ ⎦
Considering 20 rods of 10 ft each in a 100ft x 100 ft substation area:
LR
1. for 10ft x10ft grid.................... =0.1
Lc
LR
2. for 20ft x20ft grid.................... =0.17
Lc
LR
For analysis purposes, let's use =0.15.; Ls := 0.90L
Lc
Lc
LM := 1.25L
Lc
Page 7 of 14