TECHNICAL RECOMMENDATION FORM

Date: No: TR/________ /________


PLANT
CAP EDC / VCM PVC JETTY

EQUIPMENT
TAG NO. EQUIPMENT DESCRIPTION

PROCESS DATA
LIQUID TEMPERATURE (C) PRESSURE (BARG) MATERIAL

CASE / PROBLEM

ANALYSIS / INSPECTION

RECOMMENDATION

TOOL REQUIRED
1 2 3 4
5 6 7 8
TEST / NDT REQUIRED
PRESSURE TEST PENETRANT TEST ALIGNMENT VIBRATION

RECOMMENDED BY APPROVED BY RECEIVED BY

TECH. MANAGER BUSSINESS TEAM MGR SHE MANAGER


FINAL COMPLETION & HAND OVER
EXECUTED BY INSPECTED BY APPROVED BY
Date: Date: Date: Date:

TECH. MANAGER BUSSINESS TEAM MGR SHE MANAGER


Note:

Note, No diisi: TR/nomor urut hari ini sesuai nomor registrasi buku/tgl-bulan-tahun
TECHNICAL RECOMMENDATION FORM
Date: 10/09/2019 No: TR/________ /________
PLANT VCM
EQUIPMENT NAME Cooler
TAG NO VH 823 and VH 824 Other Specification:
SERVICE HCl -
TEMPERATURE -
PRESSURE -
CAPACITY -
MATERIAL -
CASE / PROBLEM
Heat transfer on VH 823 and VH 824 does not work well. Because it does not give temperature difference between T inlet and T
outlet shows the poor heat transfer in the heat exchanger.

ANALYSIS / INSPECTION
Base on temperature inlet and outlet shows that the difference in temperature value is lower than the design that indicates that
there is a decline in performance of the heat exchanger. The Data is presented as follows:

RECOMMENDATION
The decrease performance of the heat exchanger caused by dirty / deposited so that heat exchanger needs to be done chemical
cleaning.

1 2 3 4
5 6 7 8
TEST / NDT REQUIRED
PRESSURE TEST PENETRANT TEST ALIGNMENT VIBRATION

RECOMMENDED BY APPROVED BY RECEIVED BY

TECH. MANAGER PLANT MANAGER MAINT. MANAGER


Note:

FINAL COMPLETION & HAND OVER


EXECUTED BY INSPECTED BY APPROVED BY
Date: Date: Date: Date:

TECH. MANAGER BUSSINESS TEAM MGR SHE MANAGER


Note, No diisi: TR/nomor urut hari ini sesuai nomor registrasi buku/tgl-bulan-tahun
Distribution: 1. Maintenance 2. Technical 3. Bussiness Team Manager 4. SHE
Sheet4

Surveyor (c) Technical (d) Spv (e) Selisih (c-d) Selisih (c-e) Selisih (d-e)
Initial 1720.5500 1706.4600 1706.4560 14.0900 14.0940 0.0040
ST 101A Final 181.1760 163.8100 163.8330 17.3660 17.3430 -0.0230
Quantity 1539.3740 1542.6500 1542.6230 -3.2760 -3.2490 0.0270
Initial 1629.3970 1616.2640 1617.7590 13.1330 11.6380 -1.4950
ST 101B Final 199.9500 184.8500 184.7480 15.1000 15.2020 0.1020
Quantity 1429.4470 1431.4140 1433.0110 -1.9670 -3.5640 -1.5970
Total Cargo (a) 2968.8210 2974.0640 2975.6340 -5.2430 -6.8130 -1.5700
Kapal (b) 3002.5820 3002.5820 3002.5820 0.0000 0.0000 0.0000
Selisih (b-a) 33.7610 28.5180 26.9480 5.2430 6.8130 1.5700