No. Phase Topic / Item Description

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 37

No.

Phase Topic / Item Description


1 Operation SCADA-PPC Comms error in PPC

SCB monitors- Comms lost during early morning and


2 Operation
comms error late afternoon

3 Operation UPS 7 UPS 7 battery damaged,

4 Operation Panels damage-0517 Around 376 panels- damaged

Cooperation with SLC, Hard & soft


5 Operation PM schedule
copy

Toolist ready?, Plan? experienced


6 Operation Annual PM
technicians?

7 Operation Tx 6 & 7 relay

8 Operation Animal control Method to prevent animal/ insects

9 Operation UPS 5 UPS 5 battery damaged,

The master & slave


10 Operation The screen was on the blink
screens at SCADA

11 Operation HMI screen of CCTV The screen didn’t display anything


12 Operation CCTV 6 Lost signal on HMI
13 Operation TX 6, 7 T-Plug cable has damaged

Earthing cable
14 Operation Rusty bolts
terminal

15 Operation Panels at MVPS 7 Shading panel

16 Operation Transformers

17 Operation Transformers Tx 8 tripped 3 times on 11-Nov


18 Operation Transformers Tx 7 tripped 4 times on 27-Nov

19 Operation Monitor SCB Lost communication


Note by 2021-02-06
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


UPS still showed "fault" led after replacing batteries
parts. Replaced PE board of UPS

The screens have damaged Replaced

The screen has damaged


Replaced
POE has damaged
T-Plug cable has damaged Replaced

SLC will schedule plan to replace bolts


Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6.
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors
Note by 2021-02-13
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS.
UPS still showed "fault" led after replacing batteries
UPS still showed "fault" led after
and PE board.
replacing PE board.
_Ask supplier

The screens have damaged Replaced

The screen has damaged


Replaced
POE has damaged
T-Plug cable has damaged Replaced

SLC will schedule plan to replace bolts


Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6.
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors
Note by 2021-02-20
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS.
UPS still showed "fault" led after replacing batteries UPS still showed "fault" led after
replacing PE board.
_Ask supplier

The screens have damaged Replaced

The screen has damaged


Replaced
POE has damaged
T-Plug cable has damaged Replaced

SLC will schedule plan to replace bolts


Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


_First priority: Repair TX6 or replace by new one? requirements after conducting TX
Work date of start - scheduled for 15th Nov. testing.
_ Progress of checking, testing, repairing, _ SMA will take a responsibility for lost
confirmation for re-energizing of TX6. production of SLC.
_ Is there any way that SMA could do to make Tx6 re- _12 Nov,2020 SMA will replace the
energize ASAP? Lost production. new TX at MVPS 6.
_ Repair Tx7 and Tx1 _12-Nov: Received the new TX.
_Tx2,3,4,5,8: need to conduct the transformer testing _13-Nov: Replaced the new TX
because total dissolved combustible (TDC) of all TXs _14-Nov: Energized the TX with no
are increased load about 4 hours. Then Energized
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors
Note by 2021-02-27
Start Date
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon 18-May
spare part

Check with SCADA for warranty claim or battery


Already quoted price 2-Apr
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17-May
17/05? Any physical damage?

Team structure, document recording. Process monitoring 1-Jun

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6 1-Jun
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all 12-Jun
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS.
UPS still showed "fault" led after replacing batteries UPS still showed "fault" led after 13-Jun
replacing PE board.
_Ask supplier

The screens have damaged Replaced 15-Jun

The screen has damaged 27-Jun


Replaced
POE has damaged 27-Jun
T-Plug cable has damaged Replaced 27-Aug

SLC will schedule plan to replace bolts


Rusty bolts 28-Aug
and terminal connectors
SLC removed shading panel then fill
Shading panel 28-Aug
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6. 13-Oct
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil 11-Nov
treatment
_17-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil 27-Nov
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors
Supporting
End Date Responsible Remark
Department
SCADA

ETIC & NANZI Trina, NANZI, Lam

9-Oct SLC & Trina Lam

APAC sales Gordon

1-Jun SLC Lam

30-Jun SLC Lam

IFC & SMA Lam

12-Jun ETIC & SLC Lam

ETIC & Trina Ella

7-Oct ETIC & Trina Hieu

ETIC & Trina Lam


12-Sep
ETIC & Trina Ella
ETIC, SMA,
1-Oct Hieu
DNH, IFC

SLC SLC

22-Oct SLC SLC

14-Nov SLC SLC

17-Nov SMA, DNH, IFC SMA, DNH, IFC


29-Nov SMA, DNH, IFC SMA, DNH, IFC

19-Jan SLC Hieu


Done
Open

Open

Close

Open

Close

Open

Open

Close

Open

Close

Close
Close
Close

Open

Close

Close

Close
Close

Close
Total Power Number of Average
Bev Energy Day
Date Energy normal Energy per
average (kWh/m2)
(kWh) INVs Inverter

1-Jan-21 138,415 15.00 9.2 3.9219


2-Jan-21 187,998 15.00 12.5 4.9687
3-Jan-21 209,430 15.00 14.0 6.2031
4-Jan-21 98,059 15.00 6.5 2.6406
5-Jan-21 241,453 15.00 16.1 6.5000
6-Jan-21 190,912 15.00 12.7 4.8750
7-Jan-21 251,539 15.00 16.8 7.1094
8-Jan-21 258,319 15.00 17.2 7.0938
9-Jan-21 256,761 15.00 17.1 7.2188
10-Jan-21 193,430 15.00 12.9 7.0000
11-Jan-21 247,912 15.00 16.5 7.2344
12-Jan-21 209,400 15.00 14.0 7.2969
13-Jan-21 218,003 15.00 14.5 7.2188
14-Jan-21 203,833 15.00 13.6 7.1094
15-Jan-21 204,599 15.00 13.6 7.0938
16-Jan-21 199,676 15.00 13.3 6.1094
17-Jan-21 184,556 15.00 12.3 6.7344
18-Jan-21 240,979 15.00 16.1 6.8438
19-Jan-21 201,885 15.00 13.5 5.5313
20-Jan-21 225,020 15.00 15.0 7.1563
21-Jan-21 184,701 15.00 12.3 5.1094
22-Jan-21 138,429 15.00 9.2 3.5625
23-Jan-21 260,353 15.00 17.4 7.1094
24-Jan-21 230,074 15.00 15.3 7.0938
25-Jan-21 239,883 15.00 16.0 6.7969
26-Jan-21 240,240 15.00 16.0 7.3438
27-Jan-21 256,331 15.00 17.1 6.9531
28-Jan-21 235,085 15.00 15.7 6.8907
29-Jan-21 212,283 15.00 14.2 6.7032
30-Jan-21 222,788 15.00 14.9 6.9062
31-Jan-21 187,621 15.00 12.5 7.0157
Sum 6,569.967 197.3438
Average 211.934 6.3659
Note:
1.Power Energy is based on the 4 meters (471+ 472+473+474),total 15 INVs
2.Calculation no curtailment from A0 does not mean it don't have, also due to low energy ou
The subtotal is over estimation.
Estimated Total
Estimated Total Estimated Loss due
poweer energy based
Power Energy based to A0 Curtailment
if no IGBT failure
on Irradiation (MWh) (MWh)
(MWh)

149.37043 138.4150 10.9554


189.23910 187.9980 1.2
236.25276 209.4300 26.8
100.57053 98.0590 2.5
246.02292 241.4530 4.6
185.67042 190.9120 0.0
269.08851 251.5390 17.5
268.49617 258.3190 10.2
273.22738 256.7610 16.5
264.94776 193.4300 71.5
273.81972 247.9120 25.9
276.18344 209.4000 66.8
273.22927 218.0030 55.2
269.08851 203.8330 65.3
268.49617 204.5990 63.9
232.68217 199.6760 33.0
254.89488 184.5560 70.3
259.03375 240.9790 18.1
210.66452 201.8850 8.8
270.86177 225.0200 45.8
194.59593 184.7010 9.9
135.68223 138.4290 0.0
269.08851 260.3530 8.7
268.49617 230.0740 38.4
257.25860 239.8830 17.4
277.95859 240.2400 37.7
263.17261 256.3310 6.8
260.80890 235.0850 25.7
253.71208 212.2830 41.4
261.39746 222.7880 38.6
265.54011 187.6210 77.9
917.5727
29.5991
NVs
Sub-total
ue to low energy output not reach the curtailment setting,
Estimated Estimated
Production Loss Production Loss
due to IGBT (MWh) due to IGBT (MWh)
42 MWh 47.3121 MWh

0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
1.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
28 29
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
15 15
CACULATE PR AND LOSS PRODUCTION

Project: Phong Phu Solar Farm Power


Location: Tuy Phong, Binh Thuan

Date Total Power kWh PR


1-Jan-21 103,473 74.32%
2-Jan-21 141,044 79.96%
3-Jan-21 156,422 71.03%
4-Jan-21 73,578 78.49%
5-Jan-21 182,141 78.93%
6-Jan-21 142,900 82.57%
7-Jan-21 188,299 74.61%
8-Jan-21 193,326 76.77%
9-Jan-21 192,258 75.02%
10-Jan-21 144,019 57.95%
11-Jan-21 185,323 72.16%
12-Jan-21 156,215 60.30%
13-Jan-21 162,909 63.57%
14-Jan-21 152,634 60.47%
15-Jan-21 149,311 59.29%
16-Jan-21 137,018 63.17%
17-Jan-21 179,549 75.10%
18-Jan-21 179,549 73.90%
19-Jan-21 151,143 76.97%
20-Jan-21 168,508 66.33%
21-Jan-21 138,788 76.51%
22-Jan-21 104,205 82.39%
23-Jan-21 195,761 77.56%
24-Jan-21 172,020 68.31%
25-Jan-21 179,629 74.44%
26-Jan-21 179,505 68.85%
27-Jan-21 192,289 77.90%
28-Jan-21 176,154 72.01%
29-Jan-21 157,968 66.38%
30-Jan-21 166,288 67.82%
31-Jan-21 139,332 55.94%
Note: + Total power valua is exprorted from 471+472+473 meter (for Inverter block 1,2,3,4,
+ Installed capacity = 35501.4 kWp

SUM 4,941,558
Average 159.405 71.26%
Monthly PR 70.53%
ATE PR AND LOSS PRODUCTION

35501.4
Reason Bev average (kWh/m2)
Low irradiation
3.9219
Limited by A0 from 8:14 to 13:30
4.9687
Limited by A0 from 10:40 to 13:30 6.2031
Low irradiation 2.6406
6.5000
4.8750
Limited by A0 from 10:30 to 12:45 7.1094
Limited by A0 from 10:58 to 12:38 7.0938
Limited by A0 from 10:57 to 12:45 7.2188
Limited by A0 from 8:50 to 12:53 7.0000
Limited by A0 from 10:30 to 12:45 7.2344
Limited by A0 from 8:50 to 13:45 7.2969
Limited by A0 from 9:33 to 13:45 7.2188
Limited by A0 from 8:15 to 13:53 7.1094
Limited by A0 from 9:35 to 12:30 7.0938
Limited by A0 from 9:50 to 12:47 6.1094
Limited by A0 from 9:24 to 12:51 6.7344
Limited by A0 from 9:45 to 12:30
6.8438
Tx1 was tripped from 11:01 to 12:46
Limited by A0 from 11:02 to 12:54 5.5313
Limited by A0 from 10:24 to 13:02 7.1563
5.1094
Low irradiation 3.5625
7.1094
Limited by A0 from 10:40 to 13:39 7.0938
Limited by A0 from 10:53 to 12:37 6.7969
Limited by A0 from 10:36 to 13:02 7.3438
Limited by A0 from 11:29 to 12:27 6.9531
Limited by A0 from 10:54 to 11:54 6.8907
Limited by A0 from 10:23 to 13:16
6.7032
Tx1 was tripped from 13:12 to 14:02
Limited by A0 from 10:47 to 12:07 6.9062
Limited by A0 from 9:30 to 14:56 7.0157
m 471+472+473 meter (for Inverter block 1,2,3,4,6,7)
p

197.3438
6.3659
Bev block 3 Bev block 6 Date Total Power kWh
3.9844 3.8594 1-Jan-21 138,415
5.0312 4.9062 2-Jan-21 187,998
6.2812 6.1250 3-Jan-21 209,430
2.6406 2.6406 4-Jan-21 98,059
6.6250 6.3750 5-Jan-21 241,453
4.8750 4.8750 6-Jan-21 190,912
7.2188 7.0000 7-Jan-21 251,539
7.1875 7.0000 8-Jan-21 258,319
7.3125 7.1250 9-Jan-21 256,761
7.0938 6.9062 10-Jan-21 193,430
7.3438 7.1250 11-Jan-21 247,912
7.4062 7.1875 12-Jan-21 209,400
7.2188 7.2188 13-Jan-21 218,003
7.2188 7.0000 14-Jan-21 203,833
7.1875 7.0000 15-Jan-21 204,599
6.1875 6.0312 16-Jan-21 199,676
6.7188 6.7500 17-Jan-21 184,556
6.9375 6.7500 18-Jan-21 240,979
5.6875 5.3750 19-Jan-21 201,885
7.2500 7.0625 20-Jan-21 225,020
5.1875 5.0312 21-Jan-21 184,701
3.6094 3.5156 22-Jan-21 138,429
7.2188 7.0000 23-Jan-21 260,353
7.1875 7.0000 24-Jan-21 230,074
6.9062 6.6875 25-Jan-21 239,883
7.4375 7.2500 26-Jan-21 240,240
7.0312 6.8750 27-Jan-21 256,331
6.9688 6.8125 28-Jan-21 235,085
6.8125 6.5938 29-Jan-21 212,283
7.0312 6.7812 30-Jan-21 222,788
7.0938 6.9375 31-Jan-21 187,621
Note: + Total power valua is exprorted from 4
1,2,3,4,6,7,8)
+ Installed capacity = 47312.1 kWp

199.8908 194.7967 6,569,967


6.4481 6.2838 211.934
47312.1
PR Reason Bev average (kWh/m2)
Low irradiation
74.60% 3.9219
Limited by A0 from 8:14 to 13:30
79.97% 0 4.9687
71.36% Limited by A0 from 10:40 to 13:30 6.2031
78.49% Low irradiation 2.6406
78.51% 0 6.5000
82.77% 0 4.8750
74.78% Limited by A0 from 10:30 to 12:45 7.1094
76.97% Limited by A0 from 10:58 to 12:38 7.0938
75.18% Limited by A0 from 10:57 to 12:45 7.2188
58.41% Limited by A0 from 8:50 to 12:53 7.0000
72.43% Limited by A0 from 10:30 to 12:45 7.2344
60.66% Limited by A0 from 8:50 to 13:45 7.2969
63.83% Limited by A0 from 9:33 to 13:45 7.2188
60.60% Limited by A0 from 8:15 to 13:53 7.1094
60.96% Limited by A0 from 9:35 to 12:30 7.0938
69.08% Limited by A0 from 9:50 to 12:47 6.1094
57.92% Limited by A0 from 9:24 to 12:51 6.7344
Limited by A0 from 9:45 to 12:30
74.42% 6.8438
Tx1 was tripped from 11:01 to 12:46
77.15% Limited by A0 from 11:02 to 12:54 5.5313
66.46% Limited by A0 from 10:24 to 13:02 7.1563
76.41% 0 5.1094
82.13% Low irradiation 3.5625
77.40% 0 7.1094
68.55% Limited by A0 from 10:40 to 13:39 7.0938
74.60% Limited by A0 from 10:53 to 12:37 6.7969
69.14% Limited by A0 from 10:36 to 13:02 7.3438
77.92% Limited by A0 from 11:29 to 12:27 6.9531
72.11% Limited by A0 from 10:54 to 11:54 6.8907
Limited by A0 from 10:23 to 13:16
66.94% 6.7032
Tx1 was tripped from 13:12 to 14:02
68.18% Limited by A0 from 10:47 to 12:07 6.9062
56.53% Limited by A0 from 9:30 to 14:56 7.0157
s exprorted from 471+472+473+474 meter (for Inverter block

= 47312.1 kWp

71.11%
70.37%
Allocate capacity avoid overload
06h-07h 07h-08h 08h-09h 09h-10h 10h-11h 11h-12h
Phong Phú 4.3 22 25 33.9 36 38
Bình An 10 30 42 42 42 42
Phan Lâm 5 18 20 29.9 29.9 29.9
ity avoid overload
12h-13h 13h-14h 14h-15h 15h-16h 16h-17h 17h-18h
37 27 23 16.9 9 2.3
42 42 42 35 15 5
29.9 29.9 29.9 20 10 5
Robot Maintenance Schedule
Restart time in month
Vehicle number Status
Date Date
1 Done Done Good
2 16-Jan-21 Done 30-Jan-21 Done Good
3 Done Done Good
Schedule

Issue Solution recovery (If any)


Company Name Working days Job decription
Ella 2 O&M Ella
Trina
Trina 6 Trina Solar
Nam 0 Nam
Lam 8 Lam
Nghia 0 Nghia
ETIC Hieu 31 Hieu
Long 0 O&M Long
Dat 0 O&M Dat
Ha 0 O&M Ha
SMA SMA O&M ETC2
IFC IFC 0 O&M IFC
Dong Nam Hung DNH 0 DNH
Robot
SCADA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 1
3 3

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
25 26 27 28 29 30 31 Sum
2
6
0
8
0
1 1 1 1 1 1 1 31
0
0
0
0
0
0
47