No.

Phase Topic / Item Description


1 Operation SCADA-PPC Comms error in PPC

SCB monitors- Comms lost during early morning and


2 Operation
comms error late afternoon

3 Operation UPS 7 UPS 7 battery damaged,

4 Operation Panels damage-0517 Around 376 panels- damaged

Cooperation with SLC, Hard & soft


5 Operation PM schedule
copy

Toolist ready?, Plan? experienced


6 Operation Annual PM
technicians?

7 Operation Tx 6 & 7 relay

8 Operation Animal control Method to prevent animal/ insects

9 Operation UPS 5 UPS 5 battery damaged,

The master & slave


10 Operation The screen was on the blink
screens at SCADA
11 Operation HMI screen of CCTV The screen didn’t display anything
12 Operation CCTV 6 Lost signal on HMI
13 Operation TX 6, 7 T-Plug cable has damaged
Earthing cable
14 Operation Rusty bolts
terminal
15 Operation Panels at MVPS 7 Shading panel

16 Operation Transformers

17 Operation Transformers Tx 8 tripped 3 times on 11-Nov

18 Operation Transformers Tx 7 tripped 4 times on 27-Nov


18 Operation Transformers Tx 7 tripped 4 times on 27-Nov

19 Operation Monitor SCB Lost communication

20 Operation UPS 4 UPS 4 has error

Tx 7 tripped many times per day since


21 Operation Transformers
19-Mar

22 Operation SCADA Entec's SCADA has alarm everyday

23 Operation Panel 648 Panels


Note by 2021-04-02
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


UPS still showed "fault" led after replacing batteries
parts. Replaced PE board of UPS

The screens have damaged Replaced


The screen has damaged
Replaced
POE has damaged
T-Plug cable has damaged Replaced
SLC will schedule plan to replace bolts
Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6.
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors

_ From 19-Mar: Done vacumm


following SMA's instruction then re-
energized Tx,
_20-Mar: Sent email to SMA
_2 transformers will be delivered to site
on 07-April-2021.
_ SMA will replace TX7 on 07-April-
2021
Note by 2021-04-9
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS.
UPS still showed "fault" led after replacing batteries
UPS still showed "fault" led after
and PE board.
replacing PE board.
_Ask supplier

The screens have damaged Replaced


The screen has damaged
Replaced
POE has damaged
T-Plug cable has damaged Replaced
SLC will schedule plan to replace bolts
Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6.
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors

_ From 19-Mar: Done vacumm


following SMA's instruction then re-
energized Tx,
_20-Mar: Sent email to SMA
_2 transformers will be delivered to site
on 07-April-2021.
_ SMA will replace TX7 on 07-April-
2022

648 Panels are delivered at site on 14-


April-2021
Note by 2021-04-16
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS.
UPS still showed "fault" led after replacing batteries UPS still showed "fault" led after
replacing PE board.
_Ask supplier

The screens have damaged Replaced


The screen has damaged
Replaced
POE has damaged
T-Plug cable has damaged Replaced
SLC will schedule plan to replace bolts
Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


_First priority: Repair TX6 or replace by new one? requirements after conducting TX
Work date of start - scheduled for 15th Nov. testing.
_ Progress of checking, testing, repairing, _ SMA will take a responsibility for lost
confirmation for re-energizing of TX6. production of SLC.
_ Is there any way that SMA could do to make Tx6 re- _12 Nov,2020 SMA will replace the
energize ASAP? Lost production. new TX at MVPS 6.
_ Repair Tx7 and Tx1 _12-Nov: Received the new TX.
_Tx2,3,4,5,8: need to conduct the transformer testing _13-Nov: Replaced the new TX
because total dissolved combustible (TDC) of all TXs _14-Nov: Energized the TX with no
are increased load about 4 hours. Then Energized
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors

_ From 19-Mar: Done vacumm


following SMA's instruction then re-
energized Tx,
_20-Mar: Sent email to SMA
_2 transformers will be delivered to site
on 07-April-2021.
_ SMA will replace TX7 on 07-April-
2023

648 Panels are delivered at site on 14-


April-2021
Note by 2021-04-23
Start Date
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon 18-May
spare part

Check with SCADA for warranty claim or battery


Already quoted price 2-Apr
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17-May
17/05? Any physical damage?

Team structure, document recording. Process monitoring 1-Jun

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6 1-Jun
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all 12-Jun
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS.
UPS still showed "fault" led after
UPS still showed "fault" led after replacing batteries 13-Jun
replacing PE board.
_Ask supplier
_26-Mar-21: Replace new UPS

The screens have damaged Replaced 15-Jun


The screen has damaged 27-Jun
Replaced
POE has damaged 27-Jun
T-Plug cable has damaged Replaced 27-Aug
SLC will schedule plan to replace bolts
Rusty bolts 28-Aug
and terminal connectors
SLC removed shading panel then fill
Shading panel 28-Aug
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6. 13-Oct
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil 11-Nov
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil 27-Nov
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil 27-Nov
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors

_ 27-Mar-21: UPS showed "fault" led repeatly _Ask supplier 27-Mar


_ From 19-Mar: Done vacumm
following SMA's instruction then re-
energized Tx,
_20-Mar: Sent email to SMA
19-Mar
_2 transformers will be delivered to site
on 07-April-2021.
_ SMA will replace TX7 on 07-April-
2024
_ waiting for Entec's engineer check
31-Dec
data of Entec's Scada
648 Panels are delivered at site on 14-
14-Apr
April-2021
Supporting
End Date Responsible Remark
Department
SCADA

ETIC & NANZI Trina, NANZI, Lam

9-Oct SLC & Trina Lam

APAC sales Gordon

1-Jun SLC Lam

30-Jun SLC Lam

IFC & SMA Lam

12-Jun ETIC & SLC Lam

26-Mar ETIC & Trina Hieu

7-Oct ETIC & Trina Hieu


ETIC & Trina Lam
12-Sep
ETIC & Trina Ella
ETIC, SMA,
1-Oct Hieu
DNH, IFC
SLC SLC

22-Oct SLC SLC

14-Nov SLC SLC

17-Nov SMA, DNH, IFC SMA, DNH, IFC

29-Nov SMA, DNH, IFC SMA, DNH, IFC


29-Nov SMA, DNH, IFC SMA, DNH, IFC

19-Jan SLC Hieu

ETIC & Trina Hieu

8-Apr ETIC & Trina Hieu,Cao

ETIC & Trina Hieu

14-Apr ETIC & Trina Hieu,Cao


Done
Open

Open

Close

Open

Close

Open

Open

Close

Close

Close
Close
Close
Close

Open

Close

Close

Close

Close
Close

Close

Open

Close

Open

Close
Total Power Number of Average
Bev Energy Day
Date Energy normal Energy per
average (kWh/m2)
(kWh) INVs Inverter

1-May-21 164,197 15.00 10.9 7.0313


2-May-21 223,501 15.00 14.9 6.7813
3-May-21 275,366 15.00 18.4 7.2969
4-May-21 256,995 15.00 17.1 6.7813
5-May-21 257,368 15.00 17.2 6.7500
6-May-21 212,447 15.00 14.2 5.4063
7-May-21 214,543 15.00 14.3 5.4844
8-May-21 171,307 15.00 11.4 4.3281
9-May-21 185,809 15.00 12.4 5.0625
10-May-21 239,114 15.00 15.9 6.4219
11-May-21 248,543 15.00 16.6 6.6406
12-May-21 236,410 15.00 15.8 6.1875
13-May-21 245,037 15.00 16.3 6.6407
14-May-21 214,032 15.00 14.3 5.6094
15-May-21 228,362 15.00 15.2 6.0469
16-May-21 184,098 15.00 12.3 6.3907
17-May-21 220,602 15.00 14.7 5.9618
18-May-21 232,108 15.00 15.5 6.1406
19-May-21 246,944 15.00 16.5 6.5156
20-May-21 253,871 15.00 16.9 6.7969
21-May-21 190,921 15.00 12.7 5.1250
22-May-21 143,276 15.00 9.6 3.5078
23-May-21 159,261 15.00 10.6 4.8282
24-May-21 197,919 15.00 13.2 5.1563
25-May-21 84,602 15.00 5.6 1.9922
26-May-21 147,992 15.00 9.9 3.8047
27-May-21 221,057 15.00 14.7 5.8594
28-May-21 248,020 15.00 16.5 6.6250
29-May-21 207,807 13.00 16.0 6.0938
30-May-21 187,093 15.00 12.5 5.8125
31-May-21 227,208 15.00 15.1 5.9063
Sum 6,525.809 178.9855
Average 210.510 5.7737
Note:
1.Power Energy is based on the 4 meters (471+ 472+473+474),total 15 INVs
2.Calculation no curtailment from A0 does not mean it don't have, also due to low energy ou
The subtotal is over estimation.
Estimated Total
Estimated Total Estimated Loss due
poweer energy based
Power Energy based to A0 Curtailment
if no IGBT failure
on Irradiation (MWh) (MWh)
(MWh)
266.13245 164.1965 101.9360
256.66814 223.5014 33.2
276.18344 275.3658 0.8
256.67003 256.9946 0.0
255.48534 257.3680 0.0
205.90374 212.4470 0.0
208.88018 214.5430 0.0
164.84106 171.3070 0.0
192.81159 185.8090 7.0
244.58603 239.1140 5.5
251.34459 248.5430 2.8
235.65861 236.4100 0.0
251.34648 245.0370 6.3
213.64096 214.0320 0.0
230.30369 228.3620 1.9
243.39583 184.0980 59.3
227.06064 220.6020 6.5
233.87237 232.1080 1.8
246.61338 246.9440 0.0
257.26049 253.8710 3.4
195.19198 190.9210 4.3
133.59891 143.2760 0.0
183.88608 159.2610 24.6
196.38218 197.9190 0.0
75.87541 84.6020 0.0
144.90672 147.9920 0.0
223.16252 221.0570 2.1
250.75413 248.0200 2.7
232.08993 239.7773 0.0
221.37627 187.0930 34.3
224.94686 227.2080 0.0
298.3771
9.6251
NVs
Sub-total
ue to low energy output not reach the curtailment setting,
Estimated Estimated
Production Loss Production Loss
due to IGBT (MWh) due to IGBT (MWh)
42 MWh 47.3121 MWh
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
27.4 30.9
0.0 0.0
0.0 0.0
27.4 30.9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
1.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
28 29
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 0
1 0
15 13
CACULATE PR AND LOSS PRODUCTION

Project: Phong Phu Solar Farm Power


Location: Tuy Phong, Binh Thuan

Date Total Power kWh PR


1-May-21 125,821 50.40%
2-May-21 167,515 69.58%
3-May-21 206,709 79.80%
4-May-21 193,323 80.30%
5-May-21 193,782 80.87%
6-May-21 158,959 82.82%
7-May-21 161,727 83.06%
8-May-21 128,996 83.95%
9-May-21 139,940 77.86%
10-May-21 178,698 78.38%
11-May-21 188,760 80.07%
12-May-21 177,654 80.88%
13-May-21 184,490 78.26%
14-May-21 161,066 80.88%
15-May-21 172,089 80.16%
16-May-21 139,595 61.53%
17-May-21 166,495 78.67%
18-May-21 174,812 80.19%
19-May-21 185,039 80.00%
20-May-21 190,325 78.88%
21-May-21 143,114 78.66%
22-May-21 107,270 86.14%

23-May-21 119,907 69.95%


24-May-21 148,524 81.14%
25-May-21 63,715 90.09%

26-May-21 110,741 81.99%


27-May-21 164,636 79.15%
28-May-21 186,055 79.11%
29-May-21 176,400 81.54%
30-May-21 140,151 67.92%
31-May-21 170,192 81.17%
Note: + Total power valua is exprorted from 471+472+473 meter (for Inverter block 1,2,3,4,
+ Installed capacity = 35501.4 kWp

SUM 4,926,500
Average 158.919 78.17%
Monthly PR 77.53%
ATE PR AND LOSS PRODUCTION

35501.4
Reason Bev average (kWh/m2)
AGC from 7:52 to 14:51 7.0313
AGC from 8:52 to 13:19 6.7813
7.2969
6.7813
6.7500
AGC from 11:38 to 12:07 5.4063
5.4844
AGC from 9:20 to 10:40
4.3281
Low Irradiation
AGC from 9:30 to 13:35 5.0625
6.4219
6.6406
6.1875
AGC from 12:01 to 12:32 6.6407
5.6094
6.0469
AGC from 8:05 to 13:22 6.3907
Damaged cell PV 5.9618
Damaged cell PV 6.1406
Damaged cell PV 6.5156
AGC from 11:05 to 12:31
6.7969
Damaged cell PV
Damaged cell PV 5.1250
Low Irradiation
3.5078
Damaged cell PV
AGC from 9:10 to 12:43
4.8282
Damaged cell PV
Damaged cell PV 5.1563
Low Irradiation
1.9922
Damaged cell PV
Low Irradiation
3.8047
Damaged cell PV
Damaged cell PV 5.8594
Damaged cell PV 6.6250
Damaged cell PV 6.0938
Damaged cell PV 5.8125
AGC from 11:20 to 14:21
5.9063
Damaged cell PV
m 471+472+473 meter (for Inverter block 1,2,3,4,6,7)
p

178.9855
5.7737
Bev block 3 Bev block 6 Date Total Power kWh
7.0938 6.9688 1-May-21 164,197
6.8125 6.7500 2-May-21 223,501
7.3125 7.2812 3-May-21 275,366
6.8438 6.7188 4-May-21 256,995
6.7500 6.7500 5-May-21 257,368
5.3750 5.4375 6-May-21 212,447
5.5000 5.4688 7-May-21 214,543
4.4062 4.2500 8-May-21 171,307
5.1562 4.9688 9-May-21 185,809
6.2500 6.5938 10-May-21 239,114
6.6562 6.6250 11-May-21 248,543
6.1875 6.1875 12-May-21 236,410
6.7188 6.5625 13-May-21 245,037
5.6250 5.5938 14-May-21 214,032
6.0938 6.0000 15-May-21 228,362
6.4375 6.3438 16-May-21 184,098
6.0000 5.9235 17-May-21 220,602
6.1250 6.1562 18-May-21 232,108
6.3750 6.6562 19-May-21 246,944
6.8438 6.7500 20-May-21 253,871
5.1250 5.1250 21-May-21 190,921
3.4844 3.5312 22-May-21 143,276

4.8125 4.8438 23-May-21 159,261


5.1250 5.1875 24-May-21 197,919
2.0469 1.9375 25-May-21 84,602

3.8125 3.7969 26-May-21 147,992


5.7500 5.9688 27-May-21 221,057
6.6250 6.6250 28-May-21 248,020
6.0938 6.0938 29-May-21 207,807
5.8125 5.8125 30-May-21 187,093
5.8750 5.9375 31-May-21 227,208
Note: + Total power valua is exprorted from 4
1,2,3,4,6,7,8)
+ Installed capacity = 47312.1 kWp

179.1252 178.8457 6,525,809


5.7782 5.7692 210.510
47312.1
PR Reason Bev average (kWh/m2)
49.36% AGC from 7:52 to 14:51 7.0313
69.66% AGC from 8:52 to 13:19 6.7813
79.76% 0 7.2969
80.10% 0 6.7813
80.59% 0 6.7500
83.06% AGC from 11:38 to 12:07 5.4063
82.68% 0 5.4844
AGC from 9:20 to 10:40
83.66% 4.3281
Low Irradiation
77.58% AGC from 9:30 to 13:35 5.0625
78.70% 0 6.4219
79.11% 0 6.6406
80.76% 0 6.1875
77.99% AGC from 12:01 to 12:32 6.6407
80.65% 0 5.6094
79.82% 0 6.0469
60.89% AGC from 8:05 to 13:22 6.3907
78.21% Damaged cell PV 5.9618
79.89% Damaged cell PV 6.1406
80.11% Damaged cell PV 6.5156
AGC from 11:05 to 12:31
78.95% 6.7969
Damaged cell PV
78.74% Damaged cell PV 5.1250
Low Irradiation
86.33% 3.5078
Damaged cell PV
AGC from 9:10 to 12:43
69.72% 4.8282
Damaged cell PV
81.13% Damaged cell PV 5.1563
Low Irradiation
89.76% 1.9922
Damaged cell PV
Low Irradiation
82.21% 3.8047
Damaged cell PV
79.74% Damaged cell PV 5.8594
79.13% Damaged cell PV 6.6250
72.08% Damaged cell PV 6.0938
68.03% Damaged cell PV 5.8125
AGC from 11:20 to 14:21
81.31% 5.9063
Damaged cell PV
s exprorted from 471+472+473+474 meter (for Inverter block

= 47312.1 kWp

77.73%
77.06%
GRID CURTAILMENT DURATION
Time
Date Duration
From To
1-May-21 7:52 14:51 6:59
2-May-21 8:52 13:19 4:27
6-May-21 11:38 12:07 0:29
8-May-21 9:20 10:40 1:20
9-May-21 9:30 13:35 4:05
13-May-21 12:01 12:32 0:31
16-May-21 8:05 13:22 5:17
20-May-21 11:05 12:31 1:26
23-May-21 9:10 12:43 3:33
31-May-21 11:20 14:21 3:01
Robot Maintenance Schedule
Restart time in month
Vehicle number Status
Date Date
1 Done Done Good
2 8-May-21 Done 22-May-21 Done Good
3 Done Done Good
Schedule

Issue Solution recovery (If any)


Company Name Working days Job decription
Ella 0 O&M Ella
Trina
Trina 0 Trina Solar
Nam 0 Nam
Lam 24 Lam
Hieu 30 Hieu
ETIC Long 0 O&M Long
Cao 12 O&M Cao
Dat 0 O&M Dat
Ha 0 O&M Ha
SMA SMA O&M ETC2
IFC IFC 3 O&M IFC
Dong Nam Hung DNH 0 NLP
Robot
SCADA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1

1
25 26 27 28 29 30 31 Sum
0
0
0
1 1 1 1 1 1 24
1 1 1 1 1 1 1 30
0
12
0
0
0
1 12 3
0
69