Professional Documents
Culture Documents
No. Phase Topic / Item Description
No. Phase Topic / Item Description
16 Operation Transformers
SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?
SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?
SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?
SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17-May
17/05? Any physical damage?
Open
Close
Open
Close
Open
Open
Close
Close
Close
Close
Close
Close
Open
Close
Close
Close
Close
Close
Close
Open
Close
Open
Close
Total Power Number of Average
Bev Energy Day
Date Energy normal Energy per
average (kWh/m2)
(kWh) INVs Inverter
Note: + Total power valua is exprorted from 471+472+473 meter (for Inverter block 1,2,3,4,
+ Installed capacity = 35501.4 kWp
SUM 4,864,734
Average 162.158 78.58%
Monthly PR 78.19%
ATE PR AND LOSS PRODUCTION
35501.4
Reason Bev average (kWh/m2)
175.2596
5.8420
Bev block 3 Bev block 6 Date Total Power kWh
= 47312.1 kWp
78.73%
78.34%
GRID CURTAILMENT DURATION
Time
Date Duration
From To
1-Jun-21 11:15 13:30 2:15
2-Jun-21 11:13 13:26 2:13
3-Jun-21 10:59 13:09 2:10
4-Jun-21 11:32 12:22 0:50
6-Jun-21 8:54 13:29 4:35
7-Jun-21 10:33 11:50 1:17
9-Jun-21 11:35 12:21 0:46
13-Jun-21 8:55 13:15 4:20
14-Jun-21 11:36 11:53 0:17
15-Jun-21 11:29 12:02 0:33
16-Jun-21 11:30 12:16 0:46
17-Jun-21 10:57 12:42 1:45
18-Jun-21 11:00 12:47 1:47
19-Jun-21 10:35 12:54 2:19
20-Jun-21 8:30 14:28 5:58
21-Jun-21 15:11 18:00 2:49
22-Jun-21 6:30 18:00 11:30
23-Jun-21 6:00 18:00 12:00
6:00 8:06 2:06
24-Jun-21
10:57 12:37 1:40
6:00 8:32 2:32
25-Jun-21
11:28 12:40 1:12
6:00 8:10 2:10
26-Jun-21
11:28 12:36 1:08
6:00 7:20 1:20
27-Jun-21
8:33 14:14 5:41
6:00 8:10 2:10
28-Jun-21
11:03 12:35 1:32
6:00 8:46 2:46
29-Jun-21
11:35 12:48 1:13
30-Jun-21 6:00 7:53 1:53
Robot Maintenance Schedule
Restart time in month
Vehicle number Status
Date Date
1 Done Done
2 12-Jun-21 Done 30-Jun-21 Done
3 Done Done
Schedule
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 9 14 14 15 9 9 11 13 13 13 10 10 10 10
25 26 27 28 29 30 Sum
0
0
0
1 1 1 1 1 1 29
0
0
0
0
0
0
10 10 17
46