No.

Phase Topic / Item Description


1 Operation SCADA-PPC Comms error in PPC

SCB monitors- Comms lost during early morning and


2 Operation
comms error late afternoon

3 Operation UPS 7 UPS 7 battery damaged,

4 Operation Panels damage-0517 Around 376 panels- damaged

Cooperation with SLC, Hard & soft


5 Operation PM schedule
copy

Toolist ready?, Plan? experienced


6 Operation Annual PM
technicians?

7 Operation Tx 6 & 7 relay

8 Operation Animal control Method to prevent animal/ insects

9 Operation UPS 5 UPS 5 battery damaged,

The master & slave


10 Operation The screen was on the blink
screens at SCADA
11 Operation HMI screen of CCTV The screen didn’t display anything
12 Operation CCTV 6 Lost signal on HMI
13 Operation TX 6, 7 T-Plug cable has damaged
Earthing cable
14 Operation Rusty bolts
terminal
15 Operation Panels at MVPS 7 Shading panel

16 Operation Transformers

17 Operation Transformers Tx 8 tripped 3 times on 11-Nov

18 Operation Transformers Tx 7 tripped 4 times on 27-Nov


18 Operation Transformers Tx 7 tripped 4 times on 27-Nov

19 Operation Monitor SCB Lost communication

20 Operation UPS 4 UPS 4 has error

Tx 7 tripped many times per day since


21 Operation Transformers
19-Mar

22 Operation SCADA Entec's SCADA has alarm everyday

23 Operation Panel 648 Panels


Note by 2021-04-02
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


UPS still showed "fault" led after replacing batteries
parts. Replaced PE board of UPS

The screens have damaged Replaced


The screen has damaged
Replaced
POE has damaged
T-Plug cable has damaged Replaced
SLC will schedule plan to replace bolts
Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6.
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors

_ From 19-Mar: Done vacumm


following SMA's instruction then re-
energized Tx,
_20-Mar: Sent email to SMA
_2 transformers will be delivered to site
on 07-April-2021.
_ SMA will replace TX7 on 07-April-
2021
Note by 2021-04-9
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS.
UPS still showed "fault" led after replacing batteries
UPS still showed "fault" led after
and PE board.
replacing PE board.
_Ask supplier

The screens have damaged Replaced


The screen has damaged
Replaced
POE has damaged
T-Plug cable has damaged Replaced
SLC will schedule plan to replace bolts
Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6.
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors

_ From 19-Mar: Done vacumm


following SMA's instruction then re-
energized Tx,
_20-Mar: Sent email to SMA
_2 transformers will be delivered to site
on 07-April-2021.
_ SMA will replace TX7 on 07-April-
2022

648 Panels are delivered at site on 14-


April-2021
Note by 2021-04-16
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS.
UPS still showed "fault" led after replacing batteries UPS still showed "fault" led after
replacing PE board.
_Ask supplier

The screens have damaged Replaced


The screen has damaged
Replaced
POE has damaged
T-Plug cable has damaged Replaced
SLC will schedule plan to replace bolts
Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


_First priority: Repair TX6 or replace by new one? requirements after conducting TX
Work date of start - scheduled for 15th Nov. testing.
_ Progress of checking, testing, repairing, _ SMA will take a responsibility for lost
confirmation for re-energizing of TX6. production of SLC.
_ Is there any way that SMA could do to make Tx6 re- _12 Nov,2020 SMA will replace the
energize ASAP? Lost production. new TX at MVPS 6.
_ Repair Tx7 and Tx1 _12-Nov: Received the new TX.
_Tx2,3,4,5,8: need to conduct the transformer testing _13-Nov: Replaced the new TX
because total dissolved combustible (TDC) of all TXs _14-Nov: Energized the TX with no
are increased load about 4 hours. Then Energized
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors

_ From 19-Mar: Done vacumm


following SMA's instruction then re-
energized Tx,
_20-Mar: Sent email to SMA
_2 transformers will be delivered to site
on 07-April-2021.
_ SMA will replace TX7 on 07-April-
2023

648 Panels are delivered at site on 14-


April-2021
Note by 2021-04-23
Start Date
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon 18-May
spare part

Check with SCADA for warranty claim or battery


Already quoted price 2-Apr
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17-May
17/05? Any physical damage?

Team structure, document recording. Process monitoring 1-Jun

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6 1-Jun
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all 12-Jun
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS.
UPS still showed "fault" led after
UPS still showed "fault" led after replacing batteries 13-Jun
replacing PE board.
_Ask supplier
_26-Mar-21: Replace new UPS

The screens have damaged Replaced 15-Jun


The screen has damaged 27-Jun
Replaced
POE has damaged 27-Jun
T-Plug cable has damaged Replaced 27-Aug
SLC will schedule plan to replace bolts
Rusty bolts 28-Aug
and terminal connectors
SLC removed shading panel then fill
Shading panel 28-Aug
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6. 13-Oct
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil 11-Nov
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil 27-Nov
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized
Tx, Waiting for SMA to perform oil 27-Nov
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors

_ 27-Mar-21: UPS showed "fault" led repeatly _Ask supplier 27-Mar


_ From 19-Mar: Done vacumm
following SMA's instruction then re-
energized Tx,
_20-Mar: Sent email to SMA
19-Mar
_2 transformers will be delivered to site
on 07-April-2021.
_ SMA will replace TX7 on 07-April-
2024
_ waiting for Entec's engineer check
31-Dec
data of Entec's Scada
648 Panels are delivered at site on 14-
14-Apr
April-2021
Supporting
End Date Responsible Remark
Department
SCADA

ETIC & NANZI Trina, NANZI, Lam

9-Oct SLC & Trina Lam

APAC sales Gordon

1-Jun SLC Lam

30-Jun SLC Lam

IFC & SMA Lam

12-Jun ETIC & SLC Lam

26-Mar ETIC & Trina Hieu

7-Oct ETIC & Trina Hieu


ETIC & Trina Lam
12-Sep
ETIC & Trina Ella
ETIC, SMA,
1-Oct Hieu
DNH, IFC
SLC SLC

22-Oct SLC SLC

14-Nov SLC SLC

17-Nov SMA, DNH, IFC SMA, DNH, IFC

29-Nov SMA, DNH, IFC SMA, DNH, IFC


29-Nov SMA, DNH, IFC SMA, DNH, IFC

19-Jan SLC Hieu

ETIC & Trina Hieu

8-Apr ETIC & Trina Hieu,Cao

ETIC & Trina Hieu

14-Apr ETIC & Trina Hieu,Cao


Done
Open

Open

Close

Open

Close

Open

Open

Close

Close

Close
Close
Close
Close

Open

Close

Close

Close

Close
Close

Close

Open

Close

Open

Close
Total Power Number of Average
Bev Energy Day
Date Energy normal Energy per
average (kWh/m2)
(kWh) INVs Inverter

1-Jun-21 249,386 15.00 16.6 6.6406


2-Jun-21 238,027 15.00 15.9 6.2032
3-Jun-21 245,604 15.00 16.4 6.5938
4-Jun-21 245,670 15.00 16.4 6.4844
5-Jun-21 220,186 15.00 14.7 5.7032
6-Jun-21 199,531 15.00 13.3 6.1250
7-Jun-21 172,194 15.00 11.5 4.3945
8-Jun-21 146,929 15.00 9.8 3.6250
9-Jun-21 198,287 15.00 13.2 4.9258
10-Jun-21 151,517 15.00 10.1 3.7500
11-Jun-21 169,153 15.00 11.3 4.2812
12-Jun-21 200,670 15.00 13.4 4.9844
13-Jun-21 168,374 15.00 11.2 5.1719
14-Jun-21 239,741 15.00 16.0 5.8906
15-Jun-21 225,795 15.00 15.1 6.2188
16-Jun-21 237,592 15.00 15.8 6.2188
17-Jun-21 233,773 15.00 15.6 6.3125
18-Jun-21 228,667 15.00 15.2 6.2656
19-Jun-21 238,909 15.00 15.9 6.4219
20-Jun-21 174,693 15.00 11.6 6.1406
21-Jun-21 242,908 15.00 16.2 6.2656
22-Jun-21 241,199 15.00 16.1 6.4844
23-Jun-21 247,690 15.00 16.5 6.5156
24-Jun-21 243,037 15.00 16.2 6.6094
25-Jun-21 244,621 15.00 16.3 6.5625
26-Jun-21 241,331 15.00 16.1 6.4219
27-Jun-21 175,822 15.00 11.7 6.5156
28-Jun-21 234,722 15.00 15.6 6.2188
29-Jun-21 238,920 15.00 15.9 6.1719
30-Jun-21 200,668 15.00 13.4 5.1426
Sum 6,495.616 175.2596
Average 216.521 5.8420
Note:
1.Power Energy is based on the 4 meters (471+ 472+473+474),total 15 INVs
2.Calculation no curtailment from A0 does not mean it don't have, also due to low energy ou
The subtotal is over estimation.
Estimated Total
Estimated Total Estimated Loss due
poweer energy based
Power Energy based to A0 Curtailment
if no IGBT failure
on Irradiation (MWh) (MWh)
(MWh)
251.34459 249.3860 1.9586
236.25466 238.0270 0.0
249.57322 245.6040 4.0
246.96642 245.6700 1.3
217.21154 220.1860 0.0
233.27822 199.5310 33.7
167.36998 172.1940 0.0
138.06262 146.9290 0.0
187.60520 198.2870 0.0
142.82340 151.5170 0.0
163.05481 169.1530 0.0
189.83515 200.6700 0.0
196.97632 168.3740 28.6
224.35081 239.7410 0.0
236.84881 225.7950 11.1
236.84881 237.5920 0.0
240.41939 233.7730 6.6
238.63315 228.6670 10.0
244.58412 238.9090 5.7
233.87237 174.6930 59.2
238.63315 242.9080 0.0
246.96451 241.1990 5.8
246.61338 247.6900 0.0
250.16367 243.0370 7.1
248.38853 244.6210 3.8
244.58603 241.3310 3.3
246.61338 175.8220 70.8
236.84881 234.7220 2.1
235.06256 238.9200 0.0
195.86040 200.6680 0.0
254.9275
8.4976
NVs
Sub-total
ue to low energy output not reach the curtailment setting,
Estimated Estimated
Production Loss Production Loss
due to IGBT (MWh) due to IGBT (MWh)
42 MWh 47.3121 MWh
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
1.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
28 29
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
15 15
CACULATE PR AND LOSS PRODUCTION

Project: Phong Phu Solar Farm Power


Location: Tuy Phong, Binh Thuan

Date Total Power kWh PR

1-Jun-21 186,389 79.06%

2-Jun-21 178,100 80.87%

3-Jun-21 183,729 78.49%

4-Jun-21 184,257 80.04%


5-Jun-21 165,391 81.69%

6-Jun-21 148,743 68.40%

7-Jun-21 128,534 82.39%


8-Jun-21 110,339 85.74%
9-Jun-21 149,074 85.25%
10-Jun-21 113,523 85.27%
11-Jun-21 126,918 83.50%
12-Jun-21 150,930 85.29%

13-Jun-21 125,183 68.18%

14-Jun-21 178,931 85.56%

15-Jun-21 169,266 76.67%

16-Jun-21 177,942 80.60%

17-Jun-21 175,044 78.11%

18-Jun-21 171,169 76.95%


19-Jun-21 178,798 78.43%

20-Jun-21 129,789 59.54%

21-Jun-21 181,776 81.72%

22-Jun-21 180,326 78.33%

23-Jun-21 185,997 80.41%

24-Jun-21 182,041 77.58%

25-Jun-21 183,388 78.71%

26-Jun-21 181,415 79.57%

27-Jun-21 130,401 56.37%

28-Jun-21 176,447 79.92%

29-Jun-21 179,626 81.98%

30-Jun-21 151,268 82.86%

Note: + Total power valua is exprorted from 471+472+473 meter (for Inverter block 1,2,3,4,
+ Installed capacity = 35501.4 kWp

SUM 4,864,734
Average 162.158 78.58%
Monthly PR 78.19%
ATE PR AND LOSS PRODUCTION

35501.4
Reason Bev average (kWh/m2)

Damaged cell PVs (15 disconnected strings)


6.6406
AGC from 11:15 to 13:30

AGC from 11:13 to 13:26 6.2032

Damaged cell PVs (15 disconnected strings)


6.5938
AGC from 10:59 to 13:09

AGC from 11:32 to 12:22


6.4844
Damaged cell PV
5.7032

AGC from 8:54 to 13:29


6.1250
Damaged cell PVs (15 disconnected strings)

AGC from 10:33 to 11:50


4.3945
Low Irradiation
Low Irradiation 3.6250
AGC from 11:35 to 12:21 4.9258
Low Irradiation 3.7500
Low Irradiation 4.2812
4.9844

AGC from 8:55 to 13:15


5.1719
Damaged cell PVs (15 disconnected strings)

AGC from 11:36 to 11:53


5.8906
INV 4.1 was down (11:26 AM - 12:34 AM)

AGC from 11:29 to 12:02


6.2188
Damaged cell PVs (15 disconnected strings)

AGC from 11:30 to 12:16 6.2188

AGC from 10:57 to 12:42


6.3125
Damaged cell PVs (15 disconnected strings)

AGC from 11:00 to 12:47


6.2656
Damaged cell PVs (15 disconnected strings)
AGC from 10:35 to 12:54
6.4219
Damaged cell PVs (15 disconnected strings)

AGC from 8:30 to 14:28


6.1406
Damaged cell PVs (15 disconnected strings)

AGC from 15:11 to 18:00 6.2656

AGC from 6:30 to 18:00


6.4844
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 18:00 6.5156

AGC from 6:00 to 8:06


AGC from 10:57 to 12:37 6.6094
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 8:32


AGC from 11:28 to 12:40 6.5625
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 8:10


AGC from 11:28 to 12:36 6.4219
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 7:20


AGC from 8:33 to 14:14 6.5156
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 8:10


AGC from 11:03 to 12:35 6.2188
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 8:46


AGC from 11:35 to 12:48 6.1719
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 7:53


5.1426
Damaged cell PVs (4 disconnected strings)

m 471+472+473 meter (for Inverter block 1,2,3,4,6,7)


p

175.2596
5.8420
Bev block 3 Bev block 6 Date Total Power kWh

6.6562 6.6250 1-Jun-21 249,386

6.1875 6.2188 2-Jun-21 238,027

6.5938 6.5938 3-Jun-21 245,604

6.4688 6.5000 4-Jun-21 245,670


5.6875 5.7188 5-Jun-21 220,186

6.1250 6.1250 6-Jun-21 199,531

4.5000 4.2890 7-Jun-21 172,194


3.6250 3.6250 8-Jun-21 146,929
5.0625 4.7891 9-Jun-21 198,287
3.7344 3.7656 10-Jun-21 151,517
4.2812 4.2812 11-Jun-21 169,153
5.0312 4.9375 12-Jun-21 200,670

5.1562 5.1875 13-Jun-21 168,374

5.9062 5.8750 14-Jun-21 239,741

6.1875 6.2500 15-Jun-21 225,795

6.1875 6.2500 16-Jun-21 237,592

6.3125 6.3125 17-Jun-21 233,773

6.2500 6.2812 18-Jun-21 228,667


6.4375 6.4062 19-Jun-21 238,909

6.1250 6.1562 20-Jun-21 174,693

6.2812 6.2500 21-Jun-21 242,908

6.5312 6.4375 22-Jun-21 241,199

6.5312 6.5000 23-Jun-21 247,690

6.6250 6.5938 24-Jun-21 243,037

6.5938 6.5312 25-Jun-21 244,621

6.4688 6.3750 26-Jun-21 241,331

6.5312 6.5000 27-Jun-21 175,822

6.3125 6.1250 28-Jun-21 234,722

6.1562 6.1875 29-Jun-21 238,920

5.2500 5.0351 30-Jun-21 200,668

Note: + Total power valua is exprorted from 4


1,2,3,4,6,7,8)
+ Installed capacity = 47312.1 kWp

175.7966 174.7225 6,495,616


5.8599 5.8241 216.521
47312.1
PR Reason Bev average (kWh/m2)

Damaged cell PVs (15 disconnected strings)


79.38% 6.6406
AGC from 11:15 to 13:30

81.10% AGC from 11:13 to 13:26 6.2032

Damaged cell PVs (15 disconnected strings)


78.73% 6.5938
AGC from 10:59 to 13:09

AGC from 11:32 to 12:22


80.08% 6.4844
Damaged cell PV
81.60% 0 5.7032

AGC from 8:54 to 13:29


68.85% 6.1250
Damaged cell PVs (15 disconnected strings)

AGC from 10:33 to 11:50


82.82% 4.3945
Low Irradiation
85.67% Low Irradiation 3.6250
85.08% AGC from 11:35 to 12:21 4.9258
85.40% Low Irradiation 3.7500
83.51% Low Irradiation 4.2812
85.09% 0 4.9844

AGC from 8:55 to 13:15


68.81% 5.1719
Damaged cell PVs (15 disconnected strings)

AGC from 11:36 to 11:53


86.02% 5.8906
INV 4.1 was down (11:26 AM - 12:34 AM)

AGC from 11:29 to 12:02


76.74% 6.2188
Damaged cell PVs (15 disconnected strings)

80.75% AGC from 11:30 to 12:16 6.2188

AGC from 10:57 to 12:42


78.27% 6.3125
Damaged cell PVs (15 disconnected strings)

AGC from 11:00 to 12:47


77.14% 6.2656
Damaged cell PVs (15 disconnected strings)
AGC from 10:35 to 12:54
78.63% 6.4219
Damaged cell PVs (15 disconnected strings)

AGC from 8:30 to 14:28


60.13% 6.1406
Damaged cell PVs (15 disconnected strings)

81.94% AGC from 15:11 to 18:00 6.2656

AGC from 6:30 to 18:00


78.62% 6.4844
Damaged cell PVs (4 disconnected strings)

80.35% AGC from 6:00 to 18:00 6.5156

AGC from 6:00 to 8:06


77.72% AGC from 10:57 to 12:37 6.6094
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 8:32


78.79% AGC from 11:28 to 12:40 6.5625
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 8:10


79.43% AGC from 11:28 to 12:36 6.4219
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 7:20


57.04% AGC from 8:33 to 14:14 6.5156
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 8:10


79.78% AGC from 11:03 to 12:35 6.2188
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 8:46


81.82% AGC from 11:35 to 12:48 6.1719
Damaged cell PVs (4 disconnected strings)

AGC from 6:00 to 7:53


82.48% 5.1426
Damaged cell PVs (4 disconnected strings)

s exprorted from 471+472+473+474 meter (for Inverter block

= 47312.1 kWp
78.73%
78.34%
GRID CURTAILMENT DURATION
Time
Date Duration
From To
1-Jun-21 11:15 13:30 2:15
2-Jun-21 11:13 13:26 2:13
3-Jun-21 10:59 13:09 2:10
4-Jun-21 11:32 12:22 0:50
6-Jun-21 8:54 13:29 4:35
7-Jun-21 10:33 11:50 1:17
9-Jun-21 11:35 12:21 0:46
13-Jun-21 8:55 13:15 4:20
14-Jun-21 11:36 11:53 0:17
15-Jun-21 11:29 12:02 0:33
16-Jun-21 11:30 12:16 0:46
17-Jun-21 10:57 12:42 1:45
18-Jun-21 11:00 12:47 1:47
19-Jun-21 10:35 12:54 2:19
20-Jun-21 8:30 14:28 5:58
21-Jun-21 15:11 18:00 2:49
22-Jun-21 6:30 18:00 11:30
23-Jun-21 6:00 18:00 12:00
6:00 8:06 2:06
24-Jun-21
10:57 12:37 1:40
6:00 8:32 2:32
25-Jun-21
11:28 12:40 1:12
6:00 8:10 2:10
26-Jun-21
11:28 12:36 1:08
6:00 7:20 1:20
27-Jun-21
8:33 14:14 5:41
6:00 8:10 2:10
28-Jun-21
11:03 12:35 1:32
6:00 8:46 2:46
29-Jun-21
11:35 12:48 1:13
30-Jun-21 6:00 7:53 1:53
Robot Maintenance Schedule
Restart time in month
Vehicle number Status
Date Date
1 Done Done
2 12-Jun-21 Done 30-Jun-21 Done
3 Done Done
Schedule

Issue Solution recovery (If any)


Company Name Working days Job decription
Ella 0 O&M Ella
Trina
Trina 0 Trina Solar
Nam 0 Nam
Lam 29 Lam
Long 0 O&M Long
ETIC
Cao 0 O&M Cao
Dat 0 O&M Dat
Ha 0 O&M Ha
SMA SMA O&M ETC2
IFC IFC 0 O&M IFC
PCC1 PCC1 17 PCC1
Robot
SCADA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

8 9 14 14 15 9 9 11 13 13 13 10 10 10 10
25 26 27 28 29 30 Sum
0
0
0
1 1 1 1 1 1 29
0
0
0
0
0
0
10 10 17
46