RFI-WSF-195 FU Ne Katin L+18,17,16
RFI-WSF-195 FU Ne Katin L+18,17,16
TRANSMISSION LETTER
PËRMBAJTJE
CONTENT
SEKSIONI A Kontrolli I instalimit te tubacioneve te furnizimit me uje, grupeve te lavamanit e dushit,
per zonen brenda dhomes ne tualetet e King Room 01, Twin Room 02, Twin Room 03,
One Bedroom Suite 04, Twin Room 05, King Room 06, Junior Suite 07 ne katin L+18,
SECTION A L+17, L+16.
Checking of the assembly of the individual room water supply system pipes and fittings
for the King Room 01, Twin Room 02, Twin Room 03, One Bedroom Suite 04, Twin
Room 05, King Room 06, Junior Suite 07, at floor L+18, L+17, L+16.
DATA E INSPEKTIMIT /INSPECTION DATE: ORA E INSPEKTIMIT /INSPECTION TIME: 09:00
PËRGATITI / KONTROLLOI
PREPARED/CHECKED BY
MBIKËQYRËS I PUNIMEVE
SUPERVISOR
1 APROVOHET AVE CONSULTING sh.p.k
APPROVED
2 APROVOHET ME SHËNIME PËRFAQËSUES
APPROVED AS NOTED REPRESENTATIVE
3 PËR APROVIM SIPAS SHENIMEVE (RI-DERGIM) -
FOR APPROVAL AS NOTED (TO BE RESUBMITTED)
4 NUK APROVOHET -
DISAPPROVED
SHËNIME FIRMA:
NOTE SIGNATURE
DATE: ___/___/2021