CAROL GARDENS

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

WEST INDIES PETROLEUM LTD

CORAL GARDENS VENT LINE UPGRADE


MEASURED WORKS
Item Description

THIS IS A FIXED PRICE


CONTRACT.

Any quantity included is approximate and is


inserted to establish rate for the described item.

The contractor or his representative is invited to


visit the site to ascertain the prevailing conditions
and establish quantities.

All items necessary to complete the works must


be included in the rate as no adjustments will be
made to the final submitted figure.

All installations must be in compliance with the


manufacturer's specifications and must not void
manufacturer's warranties.

All items supplied by WIP have to be


collected/loaded from Port Esquivel by the
Contractor or his Representative and transported
to the site at his own expense, without any
damage.

All paint colours/finishes must meet Triffy's


standard. To ensure this all colours/finishes must
be approved by the Engineer prior to purchase.

ALL DEBRIS must be removed from site at end of


works.

Item Description Qty. Unit Rate

1 EXTERNAL WORKS
Patch concrete around damaged
1.1 diesel manhole frame item
Prepare curb walls; patch all cracks,
openings and holes and finish flush
1.2 with adjacent surface item
1.3 Supply new manhole cover item
External Works Sub-total carried to Summary

2 VENT LINES REPLACEMENT


Replace defective vent lines with
UPP pipes- Excavate to get at
pipeline and remove; supply and
install UPP pipes and fittings as
replacement. Pipes must be
appropriated angled and installed in
bed of clean washed sand. Pipeline
must be tested and certified upon
completion. Reinstate all excavated
areas and place markers to indicate
2.1 where pipes were laid. All necessary 200 ft
safet precautions must be adhere to
at all times

VENT LINES REPLACEMENT Sub-total carried to Su

3 CANOPY - DIESEL PUMP


Electrical installation to include all
material and equipment required to
provide 110V/220V supply to
canopy soffit. Circuit to be taken
from existing canopy light
Carefully remove existing pump light
3.1 and support and discard . item
3 CANOPY / CANOPY FASCIA (cont'd)
Supply and install 4'x8' canopy over
3.2 the diesel pump 32 sq.ft
Remove existing bollards and
3.3 replace with new - Diesel pump 2 ea.
Supply and install bollards around
3.4 pump islands. 8 No

CANOPY - DIESEL PUMP carried to Summary

4 PAINTING & FINISHES


To prepare surfaces for painting and
supply and apply minimum two
4.1 coats paint as detailed below:
curb walls
bollards
canopy - Diesel
boundary wall
PAINTING & FINISHES carried to Summary
MEASURED WORKS
Item Description
1.0 External Works
2.0 Vent lines
3.0 Canopy - Diesel pump
4.0 Painting & Finishes
8.0 Miscellaneous

Measured Works carried to General Summary


E

Amount J$
0
Amount
-
-