Project: KIU Client:: Span 1 M 4.05
Project: KIU Client:: Span 1 M 4.05
2018 Rev: 00
Client: - Sheet No: 1 Job No:21007
Location: L1-B08 Designed by: BW
RC Beam Design to BS 8110: 1997 Checked by: W. J. B.S. Fernando
Reference Description Results
Key Plan
Span 1 = 4.05 m
Section Evaluation
Load Evaluation
Loads kN/m
W1:
Dead Load:
Self Weight of the Beam = 24 x 0.700 x 0.25 = 4.2 kN/m
Slab 01 Dead Load = 24 x 0.15 x 3.05 x 0.45 = 4.941 kN/m
Slab 02 Dead Load = 24 x 0.15 x 2.6 x 0.5 = 4.68 kN/m
S. Dead Load:
Slab 01 S. Dead Load = 2 x 3.05 x 0.45 = 2.75 kN/m
Slab 02 S. Dead Load = 2 x 2.6 x 0.5 = 2.6 kN/m
Live Load
Slab 01 Live Load = 4.0 x 3.05 x 0.45 = 5.49 kN/m
Slab 02 Live Load = 4.0 x 2.6 x 0.5 = 5.2 kN/m
Analysis Results
Deflcetion
Bending moment
Project: KIU Date : 30.06.2018 Rev: 00
Client: - Sheet No: 3 Job No:21007
Location: L1-B08 Designed by: BW
RC Beam Design to BS 8110: 1997 Checked by: W. J. B.S. Fernando
Reference Description Results
Shear Force