SKIKDA, ALGERIA
OPERATING MANUAL VOLUME V, SECTION 02:
FIRE AND GAS DETECTION SYSTEM
KBR
JOB NO.: J6404
TABLE OF CONTENTS
1.0 INTRODUCTION................................................................................................... 4
1.1 General...........................................................................................................................4
1.1.1 Objectives ....................................................................................................................4
1.1.2 Equipment Provided.....................................................................................................4
1.1.3 Alarms..........................................................................................................................4
1.1.4 Fire Areas ....................................................................................................................5
1.1.5 Uninterruptible Power Supply.......................................................................................6
2.0 SYSTEM DESCRIPTION ...................................................................................... 8
2.1 Fire and Gas System (FGS) ...........................................................................................8
2.2 Fire, Smoke and Gas Detection Equipment ....................................................................8
2.2.1 Infrared Open Path Gas Detector.................................................................................8
2.2.2 IR Point HC Gas Detectors ..........................................................................................9
2.2.3 Triple–IR Fire and Flame Detector ...............................................................................9
2.2.4 Low temperature Detector (LTD)................................................................................10
2.2.5 Heat Detector (Fixed Temperature)............................................................................10
2.2.6 Oxygen Detectors ......................................................................................................10
2.2.7 Manual Call Point .......................................................................................................10
2.3 Audio and Visual Alarms...............................................................................................11
2.4 Fire and Gas System Display and Control ....................................................................11
2.5 Building Fire and Gas Systems.....................................................................................12
2.5.1 Fire Alarm Control panels...........................................................................................12
2.5.2 Very Early Smoke Detection Apparatus (VESDA)......................................................13
2.5.3 Inert Gas IG-55 fire extinguishing systems.................................................................13
2.6 Gas Turbine Enclosures ...............................................................................................13
2.6.1 CO2 Cylinder Fire Fighting Systems ..........................................................................14
2.6.2 CO2 Tank Fire Fighting Systems ...............................................................................14
2.6.3 Turbine Enclosure CO2 controls .................................................................................14
2.6.4 Turbine Enclosure Ventilation Systems......................................................................15
2.6.5 Deluge systems..........................................................................................................15
3.0 OPERATIONS..................................................................................................... 16
3.1 Plant Fire & Gas detection ............................................................................................16
3.2 FGS Alarm and Warning Systems ................................................................................18
3.3 Fire and Gas System Display and Control ....................................................................19
3.4 Building Fire and Gas Systems.....................................................................................19
3.4.1 Fire Alarm Control panels...........................................................................................19
3.4.2 Very Early Smoke Detection Apparatus (VESDA)......................................................19
3.4.3 Inert Gas IG-55 fire extinguishing systems.................................................................19
3.4.4 Analyser houses.........................................................................................................19
3.5 Gas Turbine Enclosures ...............................................................................................20
3.5.1 CO2 Cylinder Fire Fighting Systems ..........................................................................20
3.5.2 CO2 Tank Fire Fighting Systems ...............................................................................20
3.5.3 Turbine Enclosures ....................................................................................................20
3.5.4 Ventilation Systems....................................................................................................20
3.6 Deluge Systems operation............................................................................................20
3.7 Temporary By-Pass Operation .....................................................................................20
Page 2 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 3 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
1.0 INTRODUCTION
This operating manual relates to the facilities indicated on Fire and Gas Detector
locations shown on Plot Plans SE-AAA-ZF4-002 thru SE-DNM-ZF4-004.
1.1 General
1.1.1 Objectives
The overall objectives of the Fire & Gas Detection System are:
• Provide early detection of gas releases in required areas and implement
appropriate executive action.
• Provide early detection of fire to allow automatic or manual extinguishing and
implement appropriate executive action.
• Provide timely warning to all personnel of the existence of the hazard.
• Provide supplementary means for personnel to manually initiate fire alarms.
• Provide indication at the SCR (Safety Control Room) located in the Central
Control Building of abnormal conditions.
• To take executive action (if required), to minimize the risk from these events.
• Provide a printed historical record of all fire and gas system alarms and actions
1.1.2 Equipment Provided
The equipment provided for fire and gas detection includes the following:
• Fire, Smoke and Gas Detection
• Infrared Open Path Gas Detectors
• IR Point HC Gas Detectors
• Triple IR Fire and Flame Detectors
• Low Temperature Detectors
• Heat Detectors
• Manual Call Points
• Audio and Visual Alarms
• Oxygen Detectors
• Gas Turbine Enclosure CO2 Fire Suppression
• Very Early Smoke Detection Apparatus (VESDA)
• Inert Gas IG-55 fire suppression
1.1.3 Alarms
The alarm objectives are:
• To alert the operators, located at the SCR (Safety Control Room) in the Central
Control Building to the detection of any fire or gas release.
• To identify the location of the fire or gas release.
Page 4 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
• To provide a means for the SCR operator to quickly alert all personnel on site
to a hazard and advise them of the action to be taken.
• To automatically initiate site wide alarms on a confirmed fire or gas detection.
1.1.4 Fire Areas
The plant is divided into a number of Fire Areas. A cause and effect matrix is
produced for each area, defining F&G detection, protection and alarming.
The overall plot plans of the plant indicate the different fire areas.
Fire Areas
01E PR Compressor
01I MR Compressor
01K Dehydration
01L Refrigeration
01M Liquefaction
02D Fractionation
Page 5 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Fire Areas
04I Future
Page 6 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 7 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 8 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
present, part of the infrared light is absorbed by the gas, causing a reduction in the
signal received that is proportional to the amount of gas in the beam.
IR beam monitoring is particularly beneficial when protecting the process perimeter
and has the ability to detect leaks that point detectors may miss due to prevailing or
changing wind directions and can provide early warning of dilute gas cloud when the
point detectors man not register any gas presence.
There are 33 Line of Sight gas detectors provided for the LNG train.
2.2.2 IR Point HC Gas Detectors
IR point HC detectors are designed for use in potentially hazard areas where it
provides gas and vapor detection which is independent of the presence of oxygen.
There are 151 IR Point HC Gas Detectors provided for the LNG train.
2.2.3 Triple–IR Fire and Flame Detector
Multi–spectrum infrared Fire and Flame Detectors sense the wideband radiant
energy emitted by fire’s combustion processes that include flames’ molecular
emissions and hot particulate emissions. Detectors sense 110 Degrees cone of
vision. Flame Detectors. They incorporate automatic optical integrity self-checking,
raising a fault alarm on the FGS if there is a fault.
Page 9 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
• The Blue LED flashes once every ten (10) seconds to indicate a Normal safe
operational condition. The Blue LED is OFF when no external 24 VDC input
power applied to the Detector.
• The RED LED turns ON when a fire is alarmed.
• The YELLOW LED flashes when the built–in Self–Test fails or when obscuration
of the window lens occurs. For all other fault conditions the Yellow LED will turn
ON.
There are 76 Triple–IR Fire and Flame Detectors in the LNG plant.
2.2.4 Low temperature Detector (LTD)
Low temperature Detectors are sealed stainless steel Resistance Temperature
Detector (RTD) elements for detection of LNG spills.
There are 2 Low temperature Detectors (LTD) in the LNG plant.
2.2.5 Heat Detector (Fixed Temperature)
Heat Detectors are used in the plant to detect fire by high temperature.
Page 10 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 11 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
• Hardwired hand switches to initiate plant general alarms and activate fire fighting
systems.
• Plant audible and visual alarms (horns, beacons, and general alarm).
• Fire & Gas events and alarms recorded and time stamped on the DCS.
2.5 Building Fire and Gas Systems
Plant buildings are equipped with heat and smoke detectors, manual call stations and
fire panels. Common alarms from fire panels are hardwired to the plant FGS System
for buildings such as the Main Control Room, FIRs and substations. Where toxic or
combustible gas detection provided in a building, these detectors interface directly
with the plant Fire & Gas system.
Fire Fire
Building Building
Area Area
Page 12 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 13 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 14 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 15 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
3.0 OPERATIONS
This section provides a description of the operation of the Fire and Gas System.
3.1 Plant Fire & Gas detection
The detection of a fire in its earliest stages of development is essential if remedial
actions are to be effective. There are two basic forms of detection that are
employed:
• Visual observation by operating personnel in the area detecting a fire and raising
the alarm by Manual Call Points (MACs).
• Automatically by the use of fire detectors.
MACs are positioned in such a way that they are clearly visible from a distance.
They are located near lamp posts and close to logical entrance/escape routes and
mounted such that they are not susceptible to accidental damage or inadvertent
operation.
The early detection of flammable gas is important in preventing explosions or
potentially hazardous conditions. Should potentially explosive or hazardous
conditions develop, personnel in the area are warned so appropriate action can be
taken.
Oxygen (O2) deficient detectors are installed in areas where CO2 poses a potential
hazard (AGRU and Analyzer houses).
The table below shows what types of detectors are located in each fire Area.
01E 4 - 3 1 6 - -
01G 2 - 3 1 5 - -
01I 4 - 3 1 12 - 1
01J - - 3 2 4 - 3
01K 4 - 3 3 10 - -
01L 7 - 3 3 9 - -
01M 4 - 4 4 14 2 -
01N 5 2 2 1 2 - -
01O 4 - 3 2 5 - -
Page 16 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
02A 9 - 4 3 13 - -
02C - - 1 - - - -
02D 9 - 5 3 33 - 1
02E 2 2 1 1 - - -
02F - 1 2 - - - -
02G 4 - 3 3 7 - -
02H - - 2 - - - -
03A - - 1 1 4 - -
03B 3 - 2 1 3 - -
04A - 2 2 - 1 - -
04B - 2 2 - 1 - -
04C - 2 2 - 1 - -
04D - 2 2 - 1 - -
04E - 2 2 - 1 - -
04G - - 1 - - - -
06 2 - 2 - 7 - -
07A 2 - 2 2 7 - -
07B 2 - 1 - 3 - -
07C 6 - 3 1 14 - -
07D 2 - 2 2 4 3 -
07E 2 - 1 2 3 - -
07F 8 - 2 2 7 - -
Page 17 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Alarm actions resulting from the Fire and Gas system inputs:
UNIT UNIT
Fire detected SCR
Strobes/Beacons Horn
For "Fire Detected" alarm purposes, the UNITS are grouped as:
1. LNG Train
2. Fractionation Unit
3. Fuel Gas Metering
4. Power Generation
6. Flare Area
7. Storage Area
Page 18 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
The FGS logic is implemented in accordance with the FGS Cause and Effects for
each Fire Area. Refer to 5.2Attachment II: Cause and Effect Diagrams for detail.
3.3 Fire and Gas System Display and Control
A dedicated FGS Operator Console of the DCS is provided in the Safety Control
Room (SCR) in the Central Control Building for continuous monitoring and alarm
display purposes. This system is linked to the FGS, via serial links, to receive status
of all the plant-wide detection inputs. This operator console includes display alarm
graphics, plant overview and individual FA graphics to allow quick identification of the
location of the hazards. For recording of alarms and events, a dedicated printer is
provided with the operator HMI console.
Hardwired switches are provided on the CCR FGS console for remote manual
activation of fire protection systems (such as deluge water spray systems) and
initiation/resetting of the plant alarms. Resetting of the fire protection systems
release is performed local at the field equipment.
For all Fire and Gas detected cases further action is required by operators.
A plant shutdown may be initiated by the operator, in a specific area, when there is a
confirmed alarm. No automatic plant shutdowns are initiated by the FGS.
3.4 Building Fire and Gas Systems
3.4.1 Fire Alarm Control panels
On actuation of a building common fire, gas or fault alarm in the Safety Control Room
(SCR), operators should check locally relevant building Fire Alarm Control Panel to
identify specific detector/fault information.
Fire detected causes Air Handling Units to shutdown and control dampers to close
automatically.
Gas detected at fresh air inlet duct 25%LEL 2oo2 or 50%LEL 1oo1 with other
detector in fault causes inlet dampers to close and HVAC system is recycled
automatically.
3.4.2 Very Early Smoke Detection Apparatus (VESDA)
Very Early Smoke Detection Apparatus (VESDA) installed in FIR and CCR buildings
are continuously in operation.
Smoke detected will alarm at building Fire Alarm Control Panel and in the Safety
Control Room (SCR).
Smoke detected will cause Inert gas extinguishing system IG-55 to activate after 20
seconds of alarm level 2.
3.4.3 Inert Gas IG-55 fire extinguishing systems
Inert Gas IG-55 fire extinguishing systems in FIR and CCR buildings activation will
alarm at the Safety Control Room (SCR), building Fire Alarm Control Panel and at
the room audio/visible alarm device.
Personnel should evacuate rooms in which a discharge occurs.
3.4.4 Analyser houses
Fire alarm inside analyzer house causes trip of non certified equipment.
Page 19 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 20 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 21 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
4.0 SHUTDOWN
4.1 Normal Shutdown
The Fire and Gas System (FGS) should remain in service at all times.
4.2 Process Upsets and Production Loss
1. Loss of Electrical Power
All Fire and Gas equipment is supplied from essential switchboards with diesel
backup and by UPS battery backed power supplies.
2. Loss of Instrument Air supply
Loss of instrument air has no effect on the Fire and Gas detection system.
Page 22 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
5.0 ATTACHMENTS
The following attachments are included in this section of the Operating Manual:
5.1 Attachment I: Plot Plans
5.2 Attachment II: Cause and Effect Diagrams
Page 23 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 24 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-BBD-ZF4-005 FIRE AND GAS LOCATION PLAN AREA 01L (BBD)–GRADE EL.
103500 & PLATFORM EL. 106725/107325/109525/112325
SE-BBD-ZF4-006 FIRE AND GAS LOCATION PLAN AREA 01L (BBD)–GRADE EL.
103500 & PLATFORM EL. 107325
SE-BBD-ZF4-007 FIRE AND GAS LOCATION PLAN AREA 01L (BBD)–GRADE EL.
103500
SE-BBD-ZF4-008 FIRE AND GAS LOCATION PLAN AREA 01L (BBD)–GRADE EL.
103500
SE-BBD-ZF4-009 FIRE AND GAS LOCATION PLAN AREA 01L (BBD)–GRADE EL.
103500 & PLATFORM EL. 109000 / 111331
SE-BBD-ZF4-011 FIRE AND GAS LOCATION PLAN AREA 01L (BBD)–GRADE EL.
103500
SE-BBD-ZF4-013 FIRE AND GAS LOCATION PLAN AREA 01L (BBD)–GRADE EL.
103500 & PLATFORM EL. 111950
SE-BBD-ZF4-014 FIRE AND GAS LOCATION PLAN AREA 01L (BBD)–GRADE EL.
103500
SE-BBD-ZF4-017 FIRE AND GAS LOCATION PLAN AREA 01L (BBD)–GRADE EL.
115125 & PLATFORM EL. 115125/117925/120725/123525
Page 25 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-BBF-ZF4-002 FIRE AND GAS LOCATION PLAN AREA 01K (BBF)–GRADE EL.
103150 & PLATFORM EL. 107000/107650
SE-BBF-ZF4-003 FIRE AND GAS LOCATION PLAN AREA 01K (BBF)–GRADE EL.
103150
SE-BBF-ZF4-005 FIRE AND GAS LOCATION PLAN AREA 01K (BBF)–GRADE EL.
103150 & PLATFORM EL. 1067000/107000
SE-BBF-ZF4-008 FIRE AND GAS LOCATION PLAN AREA 01K (BBF)–GRADE EL.
103150 & PLATFORM EL. 108400
SE-BBF-ZF4-010 FIRE AND GAS LOCATION PLAN AREA 01K (BBF)–GRADE EL.
103150 & PLATFORM EL. 108500/108800
SE-BBF-ZF4-011 FIRE AND GAS LOCATION PLAN AREA 01K (BBF)–GRADE EL.
103150 & PLATFORM EL. 108400/105928
SE-BBG-ZF4-006 FIRE AND GAS LOCATION PLAN AREA 01K (BBG)–GRADE EL.
103500
SE-BBG-ZF4-019 FIRE AND GAS LOCATION PLAN AREA 01E (BBG)–GRADE EL.
103500
SE-BBG-ZF4-025 FIRE AND GAS LOCATION PLAN AREA 01E (BBG)–GRADE EL.
103500 & PLATFORM EL. 106248
Page 26 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-BBG-ZF4-026 FIRE AND GAS LOCATION PLAN AREA 010 (BBG)–GRADE EL.
103500 & PLATFORM EL. 106525
SE-BBH-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 01J (BBH)–GRADE EL.
103500
SE-BBH-ZF4-003 FIRE AND GAS LOCATION PLAN AREA 01J (BBH)–GRADE EL.
103500
SE-BBH-ZF4-005 FIRE AND GAS LOCATION PLAN AREA 01J (BBH)–GRADE EL.
103500
SE-BBH-ZF4-006 FIRE AND GAS LOCATION PLAN AREA 01J (BBH)–GRADE EL.
103500
SE-BBH-ZF4-008 FIRE AND GAS LOCATION PLAN AREA 01J (BBG)–GRADE EL.
103500 & PLATFORM EL. 106860
SE-BBH-ZF4-011 FIRE AND GAS LOCATION PLAN AREA 01J (BBG)–GRADE EL.
103500 & PLATFORM EL. 109000
SE-BBH-ZF4-012 FIRE AND GAS LOCATION PLAN AREA 01J (BBH)–GRADE EL.
103500
SE-BBJ-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 01N (BBJ)–GRADE EL.
103150 & PLATFORM EL. 105825/106091
SE-BBK-ZF4-003 FIRE AND GAS LOCATION PLAN AREA 01M (BBK)– GRADE
EL. 103500
SE-BBL-ZF4-002 FIRE AND GAS LOCATION PLAN AREA 01G (BBL)–GRADE EL.
103500 & PLATFORM EL. 105344
SE-BBL-ZF4-003 FIRE AND GAS LOCATION PLAN AREA 01G (BBL)–GRADE EL.
103500 & PLATFORM EL. 105130/105400/106100
Page 27 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-BBL-ZF4-004 FIRE AND GAS LOCATION PLAN AREA 01I (BBL)– GRADE EL.
103500
SE-BBL-ZF4-005 FIRE AND GAS LOCATION PLAN AREA 01I (BBL)–GRADE EL.
103500 & PLATFORM EL. 104519/105050
SE-BBL-ZF4-007 FIRE AND GAS LOCATION PLAN AREA 01G (BBL)–GRADE EL.
103500 & PLATFORM EL. 107850
SE-BBL-ZF4-008 FIRE AND GAS LOCATION PLAN AREA 01G (BBL)–GRADE EL.
103500 & PLATFORM EL. 103800/106670/108690
SE-BBL-ZF4-010 FIRE AND GAS LOCATION PLAN AREA 01I (BBL)–GRADE EL.
103500 & PLATFORM EL. 107750
SE-BBL-ZF4-013 FIRE AND GAS LOCATION PLAN AREA 01I (BBL)– GRADE EL.
103500
SE-BBL-ZF4-014 FIRE AND GAS LOCATION PLAN AREA 01I (BBL)– GRADE EL.
103500
SE-BBN-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 01E (BBN)– GRADE
EL. 103500
SE-BBN-ZF4-002 FIRE AND GAS LOCATION PLAN AREA 01E (BBN)–GRADE EL.
103500 & PLATFORM EL. 104500/104700/104900/116525
SE-BBN-ZF4-010 FIRE AND GAS LOCATION PLAN AREA 01E (BBN)–GRADE EL.
103500 & PLATFORM EL. 110620
SE-BBP-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 01N (BBP)– GRADE
EL. 103150
SE-BBS-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 01N (BBS)– GRADE
EL. 103150
SE-BBS-ZF4-004 FIRE AND GAS LOCATION PLAN AREA 01N (BBS)–GRADE EL.
103150 & PLATFORM EL. 107525/111025
SE-BBS-ZF4-006 FIRE AND GAS LOCATION PLAN AREA 01N (BBS)–GRADE EL.
103150 & PLATFORM EL. 111525
SE-BBX-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 010 (BBX)–GRADE EL.
103500 & PLATFORM EL. 105500
Page 28 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-BBX-ZF4-002 FIRE AND GAS LOCATION PLAN AREA 010 (BBX)– GRADE
EL. 103500
SE-BBX-ZF4-003 FIRE AND GAS LOCATION PLAN AREA 010 (BBX)–GRADE EL.
103500 & PLATFORM EL. 106210/106725
SE-BBX-ZF4-004 FIRE AND GAS LOCATION PLAN AREA 010 (BBX)–GRADE EL.
103500 & PLATFORM EL. 106275
SE-BBX-ZF4-005 FIRE AND GAS LOCATION PLAN AREA 010 (BBX)–GRADE EL.
103500 & PLATFORM EL. 104200/104800
SE-BBX-ZF4-006 FIRE AND GAS LOCATION PLAN AREA 010 (BBX)–GRADE EL.
103500 & PLATFORM EL. 104200/104800
SE-BBX-ZF4-007 FIRE AND GAS LOCATION PLAN AREA 010 (BBX)–GRADE EL.
103500 & PLATFORM EL. 104200/104800
SE-CDB-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)–GRADE EL.
103500 & PLATFORM EL. 106725/107300/111485
SE-CDB-ZF4-002 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)–GRADE EL.
103500 & PLATFORM EL. 106200
SE-CDB-ZF4-003 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)–GRADE EL.
103500 & PLATFORM EL. 110000/110800
SE-CDB-ZF4-004 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)–GRADE EL.
103500 & PLATFORM EL. 107325/110435
SE-CDB-ZF4-005 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)– GRADE
EL. 103500
SE-CDB-ZF4-006 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)– GRADE
EL. 103500
Page 29 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-CDB-ZF4-007 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)–GRADE EL.
103500 & PLATFORM EL. 106600
SE-CDB-ZF4-008 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)–GRADE EL.
103500 & PLATFORM EL. 106600
SE-CDB-ZF4-009 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)–GRADE EL.
103500 & PLATFORM EL. 106600
SE-CDB-ZF4-010 FIRE AND GAS LOCATION PLAN AREA 02A (CDB)–GRADE EL.
103500
Page 30 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-CEA-ZF4-003 FIRE AND GAS LOCATION PLAN AREA 02D (CEA)–GRADE EL.
103150
SE-CEA-ZF4-004 FIRE AND GAS LOCATION PLAN AREA 02D (CEA)–GRADE EL.
103150
SE-CEA-ZF4-005 FIRE AND GAS LOCATION PLAN AREA 02D (CEA)–GRADE EL.
103150
SE-CEA-ZF4-006 FIRE AND GAS LOCATION PLAN AREA 02D (CEA)–GRADE EL.
103500 & PLATFORM EL. 106100/107775
SE-CEA-ZF4-007 FIRE AND GAS LOCATION PLAN AREA 02D (CEA)–GRADE EL.
103500 & PLATFORM EL. 106025/106475
SE-CEA-ZF4-008 FIRE AND GAS LOCATION PLAN & PLATFORM EL. 106025 /
EL. 106475
Page 31 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-CEA-ZF4-015 FIRE AND GAS LOCATION PLAN AREA 02D (CEA)–GRADE EL.
103500 & PLATFORM EL. 106500
SE-CEA-ZF4-016 FIRE AND GAS LOCATION PLAN AREA 02D (CEA)–GRADE EL.
103500 & PLATFORM EL. 109125
Page 32 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-CEF-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 02C (CEF)–GRADE EL.
103150
SE-CEF-ZF4-002 FIRE AND GAS LOCATION PLAN AREA 02C (CEF)–GRADE EL.
103150
SE-DEK-ZF4-003 FIRE AND GAS LOCATION PLAN AREA 03A (DEK)–GRADE EL.
103500 & PLATFORM EL.
105130/105150/106400/106850/107500
SE-DEK-ZF4-004 FIRE AND GAS LOCATION PLAN AREA 03A (DEK)–GRADE EL.
10400 & PLATFORM EL.
104876/105425/106400/106576/107900
SE-DEK-ZF4-005 FIRE AND GAS LOCATION PLAN AREA 03A (DEK)–GRADE EL.
104000 & PLATFORM EL. 110025/107500
SE-DFB-ZF4-002 FIRE AND GAS LOCATION PLAN AREA 04A (DFB)–GRADE EL.
104500 & PLATFORM EL. 105450/105550/105735/106955
SE-DFB-ZF4-003 FIRE AND GAS LOCATION PLAN AREA 04A (DFB)–GRADE EL.
104500 & PLATFORM EL. 105450
SE-DFB-ZF4-004 FIRE AND GAS LOCATION PLAN AREA 04A (DFB)–GRADE EL.
104500
SE-DFB-ZF4-005 FIRE AND GAS LOCATION PLAN AREA 04A (DFB)–GRADE EL.
104500 & PLATFORM EL. 105450/105564/105735/106955
Page 33 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-DFB-ZF4-007 FIRE AND GAS LOCATION PLAN AREA 04C (DFB)–GRADE EL.
104500
SE-DFB-ZF4-008 FIRE AND GAS LOCATION PLAN AREA 04C (DFB)–GRADE EL.
104500 & PLATFORM EL. 105450/105564/105735/106955
SE-DFB-ZF4-009 FIRE AND GAS LOCATION PLAN AREA 04C (DFB)–GRADE EL.
104500 & PLATFORM EL. 105450
SE-DFB-ZF4-010 FIRE AND GAS LOCATION PLAN AREA 04D (DFB)–GRADE EL.
104500
SE-DFB-ZF4-011 FIRE AND GAS LOCATION PLAN AREA 04D (DFB)–GRADE EL.
104500 & PLATFORM EL. 105450/105564/105735/106955
SE-DFB-ZF4-013 FIRE AND GAS LOCATION PLAN AREA 04E (DFB)–GRADE EL.
104500
SE-DFB-ZF4-014 FIRE AND GAS LOCATION PLAN AREA 04E (DFB)–GRADE EL.
104500 & PLATFORM EL. 105438/105564/105735/106955
SE-DFB-ZF4-015 FIRE AND GAS LOCATION PLAN AREA 04E (DFB)–GRADE EL.
104500 & PLATFORM EL. 105438
Page 34 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-DFH-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 04H (DFH)–GRADE EL.
104500 & PLATFORM EL. 107750
Page 35 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
SE-DNE-ZF4-001 FIRE AND GAS LOCATION PLAN AREA 07B (DNE)–GRADE EL.
103100 & PLATFORM EL. 105425/110081/126340
SE-DNE-ZF4-002 FIRE AND GAS LOCATION PLAN AREA 07B (DNE)–GRADE EL.
103100
SE-DNG-ZF4-015 FIRE AND GAS LOCATION PLAN AREA 07C (DNG) GRADE EL.
103500
Page 36 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Page 37 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Cause and Effect Diagrams for the Fire and Gas System
Page 38 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Cause and Effect Diagrams for the Fire and Gas System
Page 39 of 40 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-162
OPERATING MANUAL VOLUME V, SECTION 2: REVISION 0
FIRE AND GAS DETECTION SYSTEM 20 January 2011
Cause and Effect Diagrams for the Fire and Gas System
Page 40 of 40 KBR