Professional Documents
Culture Documents
3.1 Project Costing
3.1 Project Costing
3.1 Project Costing
Management
Project Costing
Release 10
3. Oracle disclaims any warranties or representations as to the accuracy or completeness of any Materials. Materials are provided "as is" without warranty of any kind, either express,
implied or statutory, including without limitation the implied warranties of merchantability, satisfactory quality, fitness for a particular purpose, accuracy, timeliness and non-infringement
of third-party rights. The information contained herein is subject to change without notice.
4. Under no circumstances shall Oracle be liable for any loss, damage, liability or expense incurred or suffered which is claimed to have resulted from use of these Materials. As a condition of
use of the Materials, Partner agrees to indemnify Oracle from and against any and all actions, claims, losses, damages, liabilities and expenses (including reasonable attorneys' fees) arising
out of Partner’s use of the Materials.
Disclaimer:
This document is for informational purposes only and is intended solely for use in connection with the internal pre-production evaluation and testing of the Software. This is not a
commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or
functionality, and inclusion or not thereof in the commercially available version of the Software, if any, is always at Oracle’s sole discretion. This document is not considered part of the
applicable program documentation.
Due to the nature of the product architecture, it may not be possible to safely include all features described in this document without risking significant destabilization of the code.
Navigator > Tools > Setup and Administration > Implementation Projects tab > your implementation
project > Define Project Costing Configuration >
Define Expenditure Extensions Implement client extensions to customize the expenditure transaction process.
Define Project Costing Configure options used to integrate Oracle Fusion Project Costing with Other Applications.
Integrations
Inventory
Supply Chain Project Define
. Inventory Project
. Misc Issues Process Cost
Collection
Fields
Supplier Invoices
Time & Labor Project
Third Party
. Timecards Tieback
Excel Upload
• Every module had it’s own way of capturing • Standard cost collection and interface for all project
and interfacing project related costs. related expenditures.
Overview
The Cost Collection flexfield allows:
• Inclusion of industry-specific cost code or funding source
or organization-specific attributes in any or all the
documents.
• Greater level of flexibility on the naming, validation, and
ordering of the attributes within each of the documents
that capture them.
• User can specify the billable and capitalizable values in
specific documents, while hiding this value in other
document.
Expenditure Batch
Supplier Invoice
Expense Report
Purchase Order
Segment
Inventory
Project, Task, Expenditure Item Date, Expenditure Type,
Expenditure Organization
Billable
Capitalizable
Work Type
User-Defined1
User-Defined2
Yes
Group Transactions
Call Execute Create EI (get next
into Expenditure Perform Perform
pre-processing Transaction item ID and update
Batch and Validations Derivations
extension Controls interface record)
Expenditures
Execute
Create Period-End
Perform Create Related Related New txn
Accrual Yes
Costing EI? Transaction created?
Transactions
Extensions
No No
No
No
Create Labor EI?
Create Cost
Accounting
Distributions
Events
Create Overtime
Yes
EI?
Expenditure Item
Yes Execute
No rejected?
Yes Overtime
Extension
Commit all
Perform Update status
Call Tieback for Call post- successful Reject
final of successfully
integrating processing EIs and related any associated
processing created items in
applications extension items to PA tables, records
steps PATI table
also CDLs
STOP
Process handled in
Indicates Standardized
Indicates a sub
process executes Push, Tiebacks
process
client extensions and Revaldiation
FDD
Note: Rate takes precedence for rate-based transactions where the unit of measure is not currency.
Markup percentage takes precedence for amount-based transaction where the unit of measure is
currency.
Optionally define additional cost base types for nonburden uses, such as billing extensions.
• For each burden cost code in the burden structure, specify what
cost base it is applied to, the expenditure types it is associated
with, and the order in which it is applied to raw costs within the
cost base.
Source Pool A combination of all source amounts defined by an allocation rule. These costs comprise
summarized projects costs, posted ledger account costs, or fixed amounts.
Targets The identified projects and tasks to receive allocation amounts. Allocation rules specify the targets.
Offsets Reversing transactions that balance allocation transactions with the source or other project.
Basis Define the method to divide the source amount among the target projects and tasks.
Offsets Optionally, define offset transactions, which are reversing transactions, that are used to balance the
allocation transactions.
Allocation
Transaction
Attributes
Offsets
Source Basis
Targets
Sources
• Project Sources: Specify source projects and tasks or use criteria
such as a project type or a classification to identify the eligible
source projects during generation. Specify a reporting resource
breakdown structure and resources to further detail the eligible
source amounts.
• Ledger Sources: Specify one or more ledger accounts as an
allocation source. Allocation generation considers posted
amounts for a ledger account when calculating source pool
amounts. Summary accounts cannot be used on allocation rules.
• Fixed Amount: Specify an amount to include in the source pool.
• Specify a value for the Allocation Method for Zero-Basis Amounts to determine
how to process a prorate-based allocation rule when the total basis amount is zero.
• Optionally, define offsets to balance the allocation transactions with the source or
another project.
To enable retirement cost processing features, select the retirement cost processing option in the business
unit implementation options.
Task Name
Manage Capitalized Interest Rates
Manage Capitalized Interest Rate Schedules
Manage Project Types: Default Interest Rate Schedule
Manage Project Statuses: Capitalized Interest Generation Status Control
Implement Capitalized Interest Extensions
Annual Calendar
Transactions
Budgetary Control
GL
SLA Journal GL Journal GL Balances
Cube
Encumbrance Accounting