Tugas 4 Si-5253 Perancangan Dan Analisis Operasional Konstruksi

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

TUGAS 4

SI-5253 PERANCANGAN DAN ANALISIS OPERASIONAL


KONSTRUKSI

Dosen:
Ir.Muhamad Abduh, MT., Ph.D., Ir. Reini D. Wirahadikusumah, MSCE., Ph.D.

Novinda Annisa Aulia


25017040

PROGRAM STUDI MAGISTER TEKNIK SIPIL


KELOMPOK KEAHLIAN MANAJEMEN DAN REKAYASA KONSTRUKSI
FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN
INSTITUT TEKNOLOGI BANDUNG
2018
NOVINDA AULIA -25017040-
TUGAS PAOK #4

PROBLEM

5.2. Three trucks haul material from a loading tower to an airfield construction job. At the fill
(i.e., airfield) a spotter shows each truck where to dump. After the trucks dump material,
they return to the loading tower. A front loader is used to load the tower. The tower can
hold up to three loads. Draw a circle-and-square (CYCLONE) diagram of this system,
Indicate all cycles and where the units in the system would be initialized at time zero.

SOLUTION

1) Identify Work Task


 WT 1 : Loading to Tower
 WT 2 : Loading to Dump Truck
 WT 3 : Hauling
 WT 4 : Dumping
 WT 5 : Back

2) Identify Resource
 R 1 : Dump Truck
 R 2 : Tower
 R 3 : Loader
 R 4 : Spotter

3) Resource Flow Route

Work Task
WT 1 WT 2 WT 3 WT 4 WT 5
Resource
R1    
R2  
R3 
R4 

 R1 :
WT 2 WT 3 WT 4 WT 5

 R2 :
WT 1 WT 2

 R3 :
WT 1

 R4 :
WT 4
Page 1|4
NOVINDA AULIA -25017040-
TUGAS PAOK #4

M
M
1 2 M 3 4 5 6 7 9 10

TT
T
11

1. Loader Available QUEUE RESOURCESS FLOW UNIT


2. Material in Tower COMBI - Loader (1)
3. Tower Available QUEUE - Tower (1)
4. Loading Material to Truck COMBI - Dump Truck (3)
5. Hauling NORMAL - Spotter (1)
6. Truck Queue QUEUE
7. Dumping COMBI
8. Spotter (Idle) QUEUE
9. Counter
10. Back NORMAL
11. Truck Queue QUEUE

Page 2|4
NOVINDA AULIA -25017040-
TUGAS PAOK #4

PROBLEM

6.1. Brick pallets are picked up from the supplier and transported by truck to the job site,
where they are off-loaded and stockpiled. Draw a model of this process similar to the
one developed for the earth-hauling operation shown in Figure 6.3.

SOLUTION

1) Identify Work Task


 WT 1 : Loading
 WT 2 : Transporting
 WT 3 : Off-loading
 WT 4 : Moving to Storage
 WT 5 : Back to Supplier

2) Identify Resource
 R 1 : Truck
 R 2 : Loader
 R 3 : Off-loader

3) Resource Flow Route


Work Task
WT 1 WT 2 WT 3 WT 4 WT 5
Resource
R1    
R2 
R3  

 R1 :
WT 1 WT 2 WT 3 WT 5

 R2 :
WT 1

 R3 :
WT 3 WT 4

Page 3|4
NOVINDA AULIA -25017040-
TUGAS PAOK #4

1 2 3 4 5 6 8 9

11 10

1. Loader Idle QUEUE RESOURCESS FLOW UNIT


2. Loading Bricks to Truck COMBI - Truck (3)
3. Transporting NORMAL - Loader (1)
4. Off-loading NORMAL - Off loader (1)
5. Loading Bricks QUEUE
6. Moving to Storage COMBI
7. Off Loader (idle) QUEUE
8. Counter
9. Bricks Stockpiled QUEUE
10. Truck Back to Supplier NORMAL
11. Truck (idle) QUEUE

Page 4|4