A1 1 To 100 Georges Heights Survey Plan March 2009

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TAFE NSW

SYDNEY
A Top of Chimney
INSTITUTE
RL 103.44
Ridge
RL 102.06
Gutter
RL 99.72

3
Gutter
SURVEYING AND

1 0 0 .8
.3 RL 100.19
1 00 Floor Level

SPATIAL
RL 97.78

3
NS
2
0 .8
10
INFORMATION

PS
E
C

ST
SYSTEMS
B
0 .2 2
10
Ridge
NS RL 101.98 Gutter
Gutter RL 100.40
RL 100.49 Gutter
RL 99.71

GEORGES HEIGHTS
PROJECT
D

10
0.
83
7
0 .2
10
NS
DETAIL SURVEY
OF PART OF
E GEORGES HEIGHTS
99
.9 4 MILITARY RESERVE
.3 0
10
0
Soil
Sa m p
99
.3 5 - ARTIST'S STUDIOS
NS le 4 .8 3
99

AT
.2 7

SE
9 Soil 98
0 .2
PS
E 10 Sa m p
le 3

T
Soil
.2 0
ST

.7 1

SEA
10
Sa m p
le 99 96
5, 6 & s
0. 7 .8 2
83 98
.9 2 98 .7 4
4 99 96
0 .2 .3
1
10
NS
F

98
.9
7 .3 9
97

NK
F

BA
.3 4
98

OF
CK
.0 8 .0 5

RO
0 99

M
10

BA NK
TO
.6 1

T
NS
.9 1 96

BO
98 OF
.8 2 97
.0 0 3 .4 1
00 .1 8T OP 96
1 .8 4 98 8 .0
8 98 9 STN
.6 .3 9
1 00

STN
99 97 D
9
7 .9
.8 2

99
98.00 .7 1
SURVEYED:

.7
99

2
2

NK
0 .2 .9 0 GUT
GU.T14
10

NK
M. London

BA
N 99 97 97

BA
S .32
Soil 3
Sa m p .2 8 9 7 .6 02/03/2009
le
8, 9 & s 98 0
10 NS .5 7 .8 1 0 .4 .8 0
96

98
97 97
96
.9 10

.0 2
.1 7 0 GUT
10

0 FFL FFL
10
G

OF
103.44 PIT
0.

DRAFTED:
IN

82

NS
CK

TCHIM
1
DE

9 6 .4 M. London
R

1 02 .06
BE

8
RIDGE LINE
1 .9 11/03/2009
T IM

Soil 10

OF
P

Sa m p Timber Clad Cottage


TO

1&2 s
le .8 0 Metal Roof
99 .4 3
2 96
9 .8 .4 5 .7 8 SCALE: 1:100 @ A1
.9 2
9 TO P
E
OF 7 6 97 FFL 97 96
8 .0 9 7 .4 .9 1
10

B AN 9
PS

K 96
.49GUT .3 7
0.

0
ST

96
83

10 100
DATUM: ASSUMED

49
GUT
.1 9

0.
.17GUT
BO

GUT

10
0
TT

10
OM

8 .4 9 .4 0 PAVED PATH 97
0 .8
2
9 .5 99 97 .0
10 9 NS 9
NOTES:
M

97

9 7 .1 4
4
TO

7 .6 - THIS SURVEY HAS BEEN COMPLETED ON BEHALF OF

.3
9

6
T

3 THE ARCHITECTURAL AND ENGINEERING STUDENTS

PATH
BO

.1
1 00 OF TAFE NSW, SYDNEY INSTITUTE. IT IS TO BE USED
NS
FOR EDUCATIONAL PURPOSES ONLY.
3
0 .2 AD - REPRODUCTION OF THIS PLAN WITHOUT THE
10 8 RO PERMISSION OF THE SURVEYING AND SPATIAL
9 8 .2
6 0
INFORMATION SYSTEMS SECTION OF SYDNEY
0 .1 9 .0 OF .2 0 INTITUTE IS ILLEGAL.
10 9
BA N
K
97
97
8 .2 N - USE OF THE ELECTRONIC FILES PROVIDED SHOULD
0
BITUM 9 .9 5 ME BE DONE WITH REFERNCE TO THIS PLAN.
.3 1
EN 9
9 8 .5 BI TU
0 C - NO SURVEY HAS BEEN MADE OF THE BOUNDARIES.
10 ROAD .1 8 .1 5
97 97 - THE BOUNDARIES HAVE NOT BEEN MARKED.
.9 4 - LEVELS ARE ON AN ASSUMED DATUM, SHOULD
99 2 .2 4 .1 6 Symbol Description A.H.D. LEVELS BE REQUESTED, FURTHER SURVEY
99
.8 99 97 Grass IS REQUIRED
.1 5 Grated Pit
0 .0
9 0 97 - ONLY SPOT LEVELS SHOULD BE USED FOR
10 .5 6 9 7 .7 Fire Hydrant
98 Tap CALCULATIONS OF QUANTITIES WITH CAUTION.
.0 4 .0 9 Tree - NO INVESTIGATION OF UNDERGROUND SERVICES
99 98 LineStyle Description HAS BEEN MADE. ALL RELEVANT AUTHORITIES
Elevated Line i.e. Ridge
Code Description
SHOULD BE NOTIFIED PRIOR TO ANY EXCAVATION
1 Natural Surface ON OR NEAR THE SITE.
.5 5
NS
8 .1
.8 3
9 97 PU Unkown Pit - ROOF RIDGES ARE DIAGAMMATIC ONLY.
98 STN GUT Gutter - ROOF RIDGES AND GUTTER LEVELS HAVE
TCHIM Top of Chimney
4 PU BEEN PICKED UP BY AN INDIRECT METHOD
9 8 .8 PU STN Survey Station
AND AS A RESULT ARE ONLY ACCURATE
TO +/- 0.050m
B
- FLOOR LEVELS TAKEN ON DOORSTEP,
A USE OF THE ELECTRONIC FILES PROVIDED SHOULD ANY FLOOR LEVEL CHANGES INTERNALLY
BE DONE WITH REFERNCE TO THIS PLAN. HAVE NOT BEEN PICKED UP
- THE SURVEY HAS BEEN ORIENTATED TO
AN APPROXIMATE GRID NORTH

FILE: Georges Heights.ccx

You might also like