Identification of Self-Employment Areas. (Market Survey)
Identification of Self-Employment Areas. (Market Survey)
&
Entrepreneurship
Development
(3351906)
Market Survey
Manufacturing Process:
Manufacturing Costing:
1) Material cost:
D = 200mm
T = 50mm
Density = 7.85gm/cm3
Volume = ∏r2h
= ∏×100×100×50
= 1570796.32mm3
= 1570.79cm3
= 1570.79 × 7.85
= 12330.70gm
= 12.33kg
2) Process Cost:
Total = 23.77lakh
= 3.39 lakh
= 365 – 79
= 286
= 1185.31 Rs.
= 600 × 8
= 5985.31/100
3) Factory overhead
Labour cost
= 20,000 × 16
= 128 Rs.
= 24 Rs.
Electricity cost
= 17.31 Rs.
Other cost
Material supply per day = 1000 Rs.
= 71.83 Rs.
Factory overhead = labour cost + land cost + electricity cost + other cost
= 1003.8 Rs.