BAR BENDING SCHEDULE

M-701: 132 KV OHTL KUDMI TO SABYA: OPEN FOUNDATION


APPLICABLE FOR : 6/0 & 6A/0

STEEL REQUIREMENT FOR PAD AND CHIMNEY


Length in No. of Bar/ No. of Bars/ No. of Unit Wt Total Wt
S.No Item Description Shape Dia(mm)
meter leg tower Tower Locs. (kg/m) (KG)

4876
LONGITUDINAL
1 Pedestal
BARS 5.116 20 24 96 2 2.470 2426.212

240

150

610
2 Pedestal TIE BARS 2.740 12 21 84 2 0.888 408.764

610

4500
5.210 20 70 280 2 2.470 7206.472

355
3 Footing TOP BARS
355

4 Footing BOTTOM BARS 5.210 20 72 288 2 2.470 7412.371


4500

500
430

5 Footing CHAIRS 1.760 16 7 28 2 1.580 155.749

200
20 mm Total
Total No of Tower 2 17045.055
in KGs=
16 mm Total
155.749
in KGs=
12 mm Total
408.764
in KGs=
Grand Total
17609.568
in KGs
Grand Total
17.610
1 In MT=