NORTH-EAST
GAS GRID
PROJECT
it immittee on id
irs has approved a
pital Grant as the E
ur to Indradhanush Gas Grid
Ltd for setting up the N
wv A total of 25,559 crore has
been earmarked as VGF.
As per the plan, a 1,656-km gas pipeline grid would connect the eight states of the
North-Eastern region, namely, Arunachal Pradesh, Assam, Manipur, Meghalaya,
Mizoram, Nagaland, Sikkim and Tripura.
Itis a part of iroca ion 20% th-Ea a” which
outlines steps to leverage the iments sector for social and economic
development of the north-east region.
Bes a infcastructure is ane 2
t by connecting gas sources to gas
consuming g markets. Gas pipeline grid determines the structure
pith the gas mae and its development. Therefore, an in
- | envisaged to ensure the adequate availability
and Seite distribution of natural gas in all parts of the country.
At present, there are about 16,800 km long G DE
ft which is operational in the country. In order to make
available natural gas across the country, it has been envisaged
to develop additional « ( lines to complete the
National Gas Grid and same are at various stages of
development.
This would ensure easy availability of natural gas across all
regions and also potentially help to achieve uniform economic
and social progress.
GAS
INFRASTRUCTURE
MAP OF INDIA, 2019
To remove regional imbalance within the
country with regard to access of natural C iy
gas and provide clean and green fuel Oy
throughout the country.
iygnona
‘CHARA BHA.
TAFRABAD)
SHAMRA)
mala (GANGAVARAM
To connect gas sources to major hk on
demand centres and ensure
availability of gas ta consumers in
various sectors. 'ENNORE]
Wo fn,
Y i — Existing Gas Pipeline
Authorised Gas Pipeline
Planned Gas Pipline
C6D) Networks in various cities for supply of CNG and PNG.
h ect (Uk GAIL \
is executing a 7BSS km. long pipeline nd
project. The project is E a BG It
scheduled to be completed progressively is beng implemented as an
by December, 2020. JHBDPL will cater to to connect North
the energy requirements of five states, "East Regian (NER) with the
namely Uttar Pradesh, Bihar, Jharkhand, National Gas Grid. The approximate length of
Odisha and West Bengal. the pipeline is 729 km. Completion of the
project is scheduled by December 2021.
e Itis also known as the
of Eastern India.
lipe ): 41 Km of Phase-| of
pipeline has been commissioned and 887 Km of
Phase-ll is under progress in two sections.
IOCL is laying 1385 km long Construction work by GAIL of Kochi-Koottanad-
pipeline. This pipeline will connect new Mangalore Section (444 Kms) is under progress
Ennore LNG Terminal with various and expected to be commissioned shortly.
demand centres in the region
is A joint venture of 5 oil and gas CPSEs i.e.
GAIL, 10CL, all, ONGC and NRL named as “Indradhanush Gas Grid Ltd” (IGGL) has
been entrusted to develop trunk pipeline connectivity in all North Eastern States
ie. Assam, Sikkim, Mizoram, Manipur, Arunachal Pradesh, Tripura, Nagaland and
Meghalaya in a phased manner.
a)
@°VIsIO Nias]
INSPIRING INIAS
TS =
Under the Petroleum and Natural Gas Regulatory
Board (PNGRB) Act 2006, PNGRB grants the
authorization to the entities for developing a City
Gas Distribution (CGD) network (including PNG
ina specified Geographical Area (GA)
of the country.
- Compressed Natural Gas (ENG)
predominantly used as at el and
Piped ae Gas (PNG) used in
C and strial
Regulations pertaining to authorization/ | ® !t Suggests setting up of a
bidding of City Gas Distribution (CGD)
networks were amended in 2018. PNGRB which will help formulate
has authorized 229 GAs covering 407 policies and streamline the processes for
districts for development of CGD \ to develop the CED
infrastructure.
network across the country.
It will cause setting up of a suitable
It covers about 53% of the country's mechanism for
area and 70% of country's the same in the state for the promotion
population. It will make available development of CGD infrastructure and
environment friendly fuel i.e. ease of doing business.
CNG/PNG to public at large.
Committee will also make a suitable
mechanism for permissions from
state divisions of the Petroleum and
Explosives Safety Organisation, NHAI,
the railways, etc.
To promote the development of CGD
network, the £
rans ts. thas been State trans| ions wi
port corporations will accord
decided to meet 100% gas requirement priority to ENG/LNG buses,
of CNG (Transport) and PNE while purchasing new buses and
(Comestic) segments through supply of retrofitting in present alternate fuel fleet.
domestic gas which is cheaper than
imported gas. The draft also calls for of CNG/
LNG may be reviewed and rationalized
At present, CGD sector is consuming with a
approx. 14.36 Million Metric Standard
Cubic Meter per Day (MMSCMD) of th na ae pee areal
domestic Gas for CNG (Transport) and 7 vehicles at par with electric
PNG (Domestic) sector. ances
To usher in Gas based economy and to increase the share of natural gas in country's primary
energy mix, Government is taking focused steps viz.
enhancing domestic gas production,
expeditious development of gas infrastructure including pipelines,
City Gas Distribution (CGD) networks and Re-gasified Liquefied Natural Gas (R-LNG) Terminals
as well as
development of Gas mi
iding open access to gas infrastructure.
Atay
INSPIRING INNOVATION
VISION
i