Professional Documents
Culture Documents
History Maintenance Forklift-Genset SRM Group SBY
History Maintenance Forklift-Genset SRM Group SBY
History Maintenance Forklift-Genset SRM Group SBY
Dokumen No FOR/SRM/PGA/06
FORM Tanggal Berlaku 1-Jan-10
Revisi ke 00
RIWAYAT SERVICE KENDARAAN
PT. SUTINDO RAYA MULIA Halaman 1 dari 1 halaman
TYPE : FD 100-5 (3160 )
Jenis Kendaraan : FORKLIFT KOMATSU 10 TON Tahun : 1996
User/Jabatan : WH SRM
No Tanggal Km Keterangan service Jml Harga Total
1 27-Jan-20 Master Rem Bawah (4/2/2020) 4 Rp850,000 Rp3,400,000
2 27-Jan-20 ppn Rp340,000
3 27-Jan-20 total Rp3,740,000
4 27-Jan-20 Reparkit Valve (Onderdil)
5 27-Jan-20 Ban Forklift (6/2/20) 2 Rp7,150,000 Rp14,300,000
6 27-Jan-20 Peleg (4/2/20) 2 Rp1,500,000 Rp3,000,000
7 27-Jan-20 Jasa bubut velg (bengkel pratama) 2 Rp350,000 Rp750,000
8 29-Jan-20 Seal hidrolis (teplon) 2 Rp75,000 Rp150,000
9 29-Jan-20 Karet master rem 1 Rp385,000
10 29-Jan-20 Seal parkit valve (seal hidrolis ) (5/2/20) 5 Rp135,000 Rp675,000
11 13-Feb-20 Seal 2 Rp75,000 Rp150,000
12 13-Feb-20 Jasa Rep whel cylinder + pasang control valve Rp2,300,000
13 13-Feb-20 Peleg 1 Rp1,500,000 Rp1,500,000
14 13-Feb-20 Jasa bubut velg (bengkel pratama) Rp350,000 Rp350,000
15 15-Feb-20 Selang hidrolis (istana selang) Rp245,000
16 27-Mar-20 Pelek 1 Rp1,700,000
17 27-Mar-20 Ring tengah forklift 1 Rp1,500,000
18 27-Mar-20 Baut roda 2 Rp300,000
19 27-Mar-20 Mur baut roda 3 Rp150,000
20 27-Mar-20 Ongkos bubut peleg 1 Rp400,000
21 27-Mar-20 Ongkos pres ban lepas & pasang 1 Rp200,000
22 16-Apr-20 Seal pompa hidrolis 1 Rp7,500
23 23-Apr-20 Peleg forklift 1 Rp1,700,000
24 23-Apr-20 Ongkos bubut Rp200,000
25 18-Jun-20 Oring seal 1 Rp10,000
26 19-Jun-20 Servis torque assy 1 Rp8,500,000
27 22-Jun-20 Bearing 6220- c3 1 Rp600,000
28 26-Jun-20 Oring seal 4mm 3 Rp9,000 Rp27,000
29 26-Jun-20 packing tba 1mm 1m Rp110,000
30 26-Jun-20 Lem threebond 2 Rp30,000 Rp60,000
31 3-Jul-20 Strum accu 2 Rp60,000
32 6-Jul-20 Olie atf 25 Rp35,000 Rp350,000
33 6-Jul-20 Clamp Accu kuningan 2 Rp30,000 Rp60,000
34 23-Jul-20 Service dinamo starter 1 Rp850,000
35 28-Jul-20 Kunci kontak 1 Rp250,000
36 28-Jul-20 Spul switch dan brostel 1 Rp375,000
37 26-Aug-20 Service pipa nozle master rem 1 Rp10,000
38 12-Nov-20 Seal Reparkit 2 Rp350,000 Rp700,000
39 11-Dec-20 Switch Kontak ( rumah Kontak) 1 Rp250,000 Rp250,000
40 11-Dec-20 (16C-24)
BIAYA 2020 Rp 41,154,500
41 13-Jan-20 Master rem atas 1
42 13-Jan-20 Master tromol roda atas kanan dan kiri 1 set Rp1,100,000
43 13-Jan-20 Master tromol roda bawah kanan dan kiri 1 set Rp1,100,000
44 13-Jan-20 Ongkos Tukang Pak hendro Rp2,500,000 Rp2,500,000
45 20-Jan-21 Seal Roda Depan ( FD100-5) 2 Rp450,000 Rp900,000
46 27-Jan-21 Baut Roda 1 Rp10,000 Rp10,000
47 27-Jan-21 Pipa Nozle 1 Rp25,000 Rp25,000
48 8-Feb-21 Baut Roda + Mur 1 Rp379,500
49 26-Mar-21 Baut Roda + Mur 1 Rp379,500
50 30-Mar-21 Bubut Ring Roda tengah 1
51 30-Mar-21 Buat Ring Pengunci Roda 1
Rp3,500,000
52 30-Mar-21 Mopok Tromol 1
53 30-Mar-21 Lepas Patahan Baut pada Tromol ( 2 Unit ) 2
BIAYA 2021 Rp 9,894,000
JUMLAH BIAYA Rp 51,048,500
…………………………………
FORM
RIWAYAT SERVICE KENDARAAN
PT. SUTINDO RAYA MULIA
TYPE
Jenis Kendaraan : FORKLIFT toyota 7TON Tahun : 2019
User/Jabatan : WH SRM
No Tanggal Hourmeter Keterangan service Jml
6 26-Feb-21 1210 Ban Belakang ( kiri Dan kanan ) 2
Tahun : 2019
Harga Total
Rp3,520,000 Rp7,040,000
Rp 7,040,000
Rp 7,040,000
FORM
No Polisi :
Jenis Kendaraan :: FORKLIF
WH SCI KOMATSU 3 TON Tahun : LAMA
User/Jabatan Model : FD30C-16 / Seri : M229-711458 / Tahun : 2006
No Tanggal JAM Keterangan service Jml
1 19-Mar-20 Keling kampas kopling 1 Unit
2 19-Mar-20 Clutch cover 1 Pcs
3 19-Mar-20 Clutch bearing 1 Pcs
4 19-Mar-20 Clutch disc 1 Pcs
5 23-Jun-20 Selang radiator 1 Pcs
6 22-Jul-20 Piston 4 pcs
7 22-Jul-20 Ring seker 1 set
8 22-Jul-20 Metal jalan 1 set
9 22-Jul-20 Metal duduk 10 set
10 22-Jul-20 Metal bulan 4 pcs
11 22-Jul-20 Lem tribon 1 pcs
12 22-Jul-20 Pangkon mesin 2 pcs
13 22-Jul-20 Pack set 1 pcs
14 22-Jul-20 Pin piston 4 pcs
15 23-Jul-20 Servis calter oli 1 unit
16 23-Jul-20 Ketter 4 lubang blok Komatsu 4D94
17 23-Jul-20 Senter 5 kap
18 23-Jul-20 Ketter bikin 4 rumah vering
19 23-Jul-20 Pres pasang 4 vering
20 23-Jul-20 Harga 1 set vering
21 23-Jul-20 Slep krukan 9 leher
22 23-Jul-20 Sok seal belakang
23 23-Jul-20 Ketter 4 stang
24 23-Jul-20 Sok 8 zeting cylinder kop
25 23-Jul-20 Slep 8 klep
26 23-Jul-20 Slep rata permukaan
27 23-Jul-20 Servis boschpump 1 unit
28 23-Jul-20 Gasket set
29 23-Jul-20 Test bosch pump
30 23-Jul-20 Bongkar pasang
31 23-Jul-20 Stel governer
32 23-Jul-20 Fuel pump wwi4
33 23-Jul-20 Tenor wwi4
34 23-Jul-20 Test nozzle
35 23-Jul-20 Gasket pompa
36 18-Aug-20 Servis dinamo stater 1 unit
37 24-Aug-20 Master rem 1 pcs
BIAYA 2020
BIAYA 2021
JUMLAH BIAYA
Dokumen No FOR/SRM/PGA/06
Tanggal Berlaku 1-Jan-10
Revisi ke 00
Halaman 1 dari 1 halaman
Tahun : LAMA
Harga Total
325,000
1,250,000
350,000
450,000
850,000 3,400,000
860,000
640,000
85,000 850,000
50,000 200,000
18,000
250,000 500,000
1,000,000
75,000 300,000
1,100,000
837,500
1,100,000
590,000
2,400,000
1,327,500
795,000
390,000
840,000
460,000
475,000
375,000
358,974
256,410
153,846
153,846
179,488
102,564
250,000
350,000
500,000
Rp 23,138,128
Rp -
Rp 23,138,128
FORM
No Polisi :
Jenis Kendaraan : FORKLIF TOYOTA- 3 TON MODEL 60-8FD30 Tahun :
User/Jabatan : WH SCI
No Tanggal JAM Keterangan service Jml
1 27-Jun-20 Klaker matahari 1 pcs
2 27-Jun-20 Kampas kopling 1 pcs
3 13-Jul-20 Matahari 1 pcs
BIAYA 2020
BIAYA 2021
JUMLAH BIAYA
Dokumen No FOR/SRM/PGA/06
Tanggal Berlaku 1-Jan-10
Revisi ke 00
Halaman 1 dari 1 halaman
2015
Harga Total
Rp350,000
Rp500,000
Rp1,500,000
Rp 2,350,000
Rp -
Rp 2,350,000
FORM
No Polisi :
Jenis Kendaraan : Forklift 3 Ton Tahun : ....
User/Jabatan : WH IVI
No Tanggal JAM Keterangan service Jml
1 03 Januari 2020 Servis converter 1 unit
2 13-May-20 Seal forklift 1 Pcs
3 13-May-20 O-Ring 1 Pcs
4 13-May-20 Kunci Kontak/ Switch 1 Pcs
5 11-Jun-20 Dinamo Ampere 1 Unit
BIAYA 2020
BIAYA 2021
JUMLAH BIAYA
Dokumen No FOR/SRM/PGA/06
Tanggal Berlaku 1-Jan-10
Revisi ke 00
Halaman 1 dari 1 halaman
Harga Total
Rp3,092,784.00
Rp1,800,000.00
Rp250,000.00
Rp250,000.00
Rp350,000.00
Rp 5,742,784
Rp -
Rp 5,742,784
Dokumen No
FORM Tanggal Berlaku
Revisi ke
RIWAYAT SERVICE KENDARAAN
PT. SUTINDO RAYA MULIA Halaman
No Polisi :
Jenis Kendaraan : Genset 40 KVA-LOVOL Tahun : November 2015
User/Jabatan : GA
No Tanggal Km Keterangan service Jml Harga
ovember 2015
Total
175,000
125,000
300,000
337,500
290,000
125,000
515,463
1,867,963
4,000
25,000
1,360,000
200,000
1,160,000
500,000
100,000
125,000
300,000
337,500
1,362,500
500,000
337,500
300,000
125,000
175,000
8,000
1,445,500
FORM
RIWAYAT SERVICE KENDARAAN
PT. SUTINDO RAYA MULIA
No Polisi :
Jenis Kendaraan : Genset 30 KVA-STAMFORD Tahun : 2016
User/Jabatan : BOD JUPITER KO. AMBON
No Tanggal Km Keterangan service Jml
BIAYA 2020
3 2-Jun-21 Service Rutin 1
Filter solar 1
Filter Oli 1
Oli mesin 7
BIAYA 2021
1
Dokumen No FOR/SRM/PGA/06
Tanggal Berlaku 1-Jan-10
Revisi ke 00
Halaman 1 dari 1 halaman
Tahun : 2016
Harga Total
925,000
150,000
775,000
77,500 155,000
30,000
250,000
435,000
Rp 1,210,000
500,000
425,000
175,000
37,500 262,500
Rp 1,362,500
Dokumen No
FORM Tanggal Berlaku
Revisi ke
RIWAYAT SERVICE KENDARAAN
PT. SUTINDO RAYA MULIA Halaman
No Polisi :
Jenis Kendaraan : Genset 45 KVA-LOVOL Tahun :
User/Jabatan : BOD VENUS B.Nanang
No Tanggal Km Keterangan service Jml Harga
Total
350,000
350,000
700,000
2,500,000
350,000
1,500,000
4,350,000
5,050,000
Dokumen No
FORM Tanggal Berlaku
Revisi ke
RIWAYAT SERVICE KENDARAAN
PT. SUTINDO RAYA MULIA Halaman
No Polisi :
Jenis Kendaraan : Genset 45 KVA-LOVOL Tahun :
User/Jabatan : BOD VENUS B.Nanang
No Tanggal Km Keterangan service Jml Harga
Total
337,500
515,463
852,963