Professional Documents
Culture Documents
BEST Utility Tender OCT20
BEST Utility Tender OCT20
BEST Utility Tender OCT20
Table of Contents
Annexure II: Instructions and Technical Bid Document Formats .............................................................. 171
10.1 General Instructions - Technical Bid .............................................................................................................. 171
10.2 Project Citation.................................................................................................................................................. 173
10.3 Details of Manpower ........................................................................................................................................ 174
10.3.1 Format for ERP Experience .......................................................................................................................... 174
10.4 Technical Bill of Material and Bill of Quantity (To be provided by the Bidder) ........................................ 177
10.5 Authorization Letters from OEMs ................................................................................................................... 178
Annexure VII: Authorization letter for attending pre-bid meeting ............................................................ 225
Annexure IX: Details about ERP Systems to be Implemented and Maintained ...................................... 232
Annexure XI: Indicative List of Electricity Bill Collection Centers for BEST .............................................. 235
Disclaimer................................................................................................................................................................. 296
Abbreviations and
Description
Acronyms
Annual Maintenance Contract/ Comprehensive Maintenance
AMC/CMC
Contract
API Application Programming Interface
IA Implementation Agency
IT Information Technology
KT Knowledge Transfer
E-TENDER NOTICE
Subject: Procurement of Services for Implementation and Support of ERP Software for
Electricity Billing, Customer Care and allied activities
The purpose of this Request for Proposal (RFP) is to identify and appoint ERP Implementation
Agency to implement ERP with Power Utility Software and other products as mentioned in the
Annexure IX, which will meet the requirements of Customer Care Department and allied activities of
BEST, along with the Cloud Hosting Services and procurement of required ERP licenses by applying
best practices.
The Interested Bidders are advised to purchase the RFP document online. The Tender Fee is Rs.
12,000/- and the same is non-refundable. The RFP document can be downloaded from
eTendering Portal - https://mahatenders.gov.in. Any subsequent corrigendum / clarification will be
shared on the Email IDs provided by the organizations / individuals who have purchased the RFP.
Also, the same shall also be made available on the eTendering portal mentioned above.
The Bidding process shall follow a Three Cover tendering System. In the Three Cover System of
e- tendering, the Bidders shall deposit, along with their Bids, an Earnest Money Deposit (EMD)
amount of Rs. 1,00,00,000/-(Rupees One Crore only) (the "EMD"), refundable in accordance to the
relevant clause(s) of this RFP. The Bidders will have to provide Earnest Money Deposit online,
through the Payment Gateway/ Bank Guarantee while submitting their bids. Any bid if it is not
accompanied by the Earnest Money Deposit, shall be summarily rejected.
As per Three Cover System systems, the document is to be uploaded online only on the website by
the bidders. Bids shall be opened on dates as mentioned in Section 2.3. All the responsive and
eligible bidders if they so wish can be present at the time of bid opening at the place (as mentioned
in the Section 2.3 of Bid Document) where Bid will be opened. The Financial bid shall be opened if
Technical bid submission satisfies/includes all the requirements and same are found acceptable to
the Authority.
The time, date and venue details related to the pre-bid meeting and proposal submission are
mentioned in the Bidder’s Data Sheet in Section 2.3 of this RFP document. Proposals must be
received not later than time and date mentioned in the Bidder’s Data Sheet. Proposals that are
received after the deadline will not be considered. Bidder will be selected under QCBS (Quality and
Cost Based Selection) Method and procedures described in this RFP.
To obtain first-hand information on the assignment, the bidders are encouraged to attend the pre-bid
meeting on the date and venue mentioned in the Bidder’s Data Sheet. However, attending the pre-
bid meeting is optional.
The date and time for submission and opening of the bids are mentioned in Section 2.3 of this RFP
document.
From:
The General Manager, BEST reserves the right to reject all or any of the e-tender(s)
without assigning any reasons at any stage.
The General Manager, Brihan Mumbai Electric Supply & Transport Undertaking (BEST) herein
referred to as ‘BEST’ or ‘Undertaking’ or ‘Department’ or ‘Authority’ invites bidders to submit their
Technical and Financial proposals for the “Procurement of Services for Implementation and
Support of ERP Software for Electricity Billing, Customer Care and allied activities".
□ This bid Document is being published by The Brihan Mumbai Electric Supply & Transport
Undertaking (BEST), for the Project “Procurement of Services for Implementation and
Support of ERP Software for Electricity Billing, Customer Care and allied
activities".
□ Bidders are advised to study this bid document carefully before submitting their bids in
response to the Bid Notice. Submission of a bid in response to this notice shall be deemed to
have been done after careful study and examination of this document with full understanding
of its terms, conditions and implications.
□ This bid document is not transferable.
□ The complete bid document (RFP) has been published on https://mahatenders.gov.in/for the
purpose of downloading. The downloaded of bid document (RFP) shall be considered valid for
participation in the electronic bidding process (e-Tendering), subject to the submission of
required Tender Fee and EMD.
□ Bidders are required to enroll on the e-tendering portal by clicking on the link provided in the
Bid Data Sheet.
□ A three cover system has been adopted through e-tendering on the mahatenders portal as
mentioned above.
□ Bidders (authorized signatory) shall submit their offers – Technical (including Pre-
Qualification) and Financial Proposal online in electronic formats only.
□ BEST will not be responsible for any delay in online submission due to any technical or non-
technical reasons. For this, bidders are requested to upload the complete bid proposal, well
advance in time so as to avoid issues like slow speed, choking of web site due to heavy load
or any other unforeseen problems. For queries related to eTender process, kindly refer the
Bidder’s Data Sheet.
□ Bidders are also advised to refer to the FAQs, Bidders’ Manual Kit, Information
about DSC, etc. available on the portal https://mahatenders.gov.in/ for
further details about the e-tendering process.
A. Introduction
Procurement of Services for Implementation
1. Project Name and Support of ERP Software for Electricity
Billing, Customer Care and allied activities
The Brihan Mumbai Electric Supply &
2. Issuing Authority
Transport (BEST) Undertaking
3. Website https://mahatenders.gov.in
Bid Document Reference No. and
4. DMM(SB)-II/11/TCU/69032/2020-21/ADVT.
Start Date
5. Bid Type Open Tender via e-Tendering System
6. Bid Document Price Rs. 12,000/- (incl. of GST @ 18% )
7. Bid Download Due Date 04.11.2020
8. Earnest Money Deposit (EMD) Rs. 1,00,00,000/-
9. EMD Submission start Date 07.12.2020
30% of total project value (Certificate issued not
10. Bank Solvency Certificate more than six months prior to the date of submission
of Bid)
B. Preparation of Bids
Mumbai-400001
The objective of this RFP is to appoint an Implementation Agency/ Service provider to Implement
and Support ERP for Electricity Billing and Customer Care Departments along with Cloud Hosting
Services for the Electric Supply Branch of the Undertaking. The procurement of the required licenses
as mentioned in Annexure IX, from the OEM on behalf of BEST will be the responsibility of selected
Implementation Agency.
Please Note: The prospective bidders are advised to study this RFP document carefully before
submitting their proposals. The submission of a proposal in response to this notice shall be deemed
to have been done after careful study and examination of this document with full understanding of
its terms, conditions and implications.
The Brihan Mumbai Electric Supply and Transport Undertaking (BEST) provides two essential
services to the citizens of Mumbai –
1. Electric Supply Division carries out the Distribution of Electricity to the Consumers
within the Island City of Mumbai.
2. Transport Division provides Stage Carrier Passenger Public Transport Services i.e. the
operation of the buses in the Island City of Mumbai and its extended suburbs, Navi
Mumbai, Mira Road / Bhayandar and upto Thane.
BEST intends to replace the existing Legacy Systems and also integrate non – ERP Systems in place,
with an ERP based solution through this project for Electricity Billing and Customer Care
Departments. In lieu of the same, BEST has envisioned a comprehensive modernization plan to
strengthen Service Delivery to its Customers, across its Electric Supply. Previously the tender was
floated for implementation of ERP solution for all the activities of the entire BEST Undertaking except
the activities covered under ITMS project. Accordingly, the tender was floated. However, looking at
the scope of the project, complexity and cost involved in the project, the BEST management has
decided to implement this project in phase-wise manner. Therefore, it is decided to implement ERP
solution for Electricity Billing and Customer Care application initially. After successful implementation
of this project, BEST will move on to the implementation of next phase. Hence, it is expected that the
proposed ERP solution should be capable of integration with the modules to be implemented in the
next phase.
In the Power Distribution Business, it is very important to ensure that the Energy received from the
Power sellers and distributed to the customers gets accounted in an efficient manner. The
Operational Efficiency is dependent on the Billing Processes which reflect activities covering the
computation and collecting of revenue from customers for all services rendered. The Billing process
comprises of many activities and all these activities are responsible for completing the revenue cycle
which is the primary source of cash flows for the utility. Therefore, one of the fundamental objectives
for any Power Utility is to ensure the continuous and smooth functioning of the billing processes. The
objective is to have complete control over its expenses, funds and become profitable in shortest
possible timespan.
At present, various applications are being used at BEST to perform multiple activities. These
applications are developed in-house as per the requirements given by the user departments of the
undertaking and are currently being used across different departments of BEST.
BEST is now looking to appoint an ERP Implementation Agency which will implement and support the
intended ERP Solution (Henceforth, to be referred to as ERP Solution across this RFP document) for
the scope mentioned in the Annexure IX of this RFP document along with Cloud Service Hosting and
procurement of Licenses for COTS (Commercially-off-the-shelf) Solution. It is expected that the
software/application should be readily deployable with minimal configuration to suit the BEST’s
specific requirements and does not involve developing the application from scratch. The proposed
COTS Solution should be an integrated platform encompassing the required ERP modules, Power
Utility Software, Data Analytics and BI components. The proposed ERP Solution should be able to
support a Single sign-on architecture and should be able to be integrate with other software
applications at BEST, the details of which are provided in Section 7.27 of this RFP document.
a) Procurement of ERP Licenses and related licenses for Electricity Billing, meter reading, Customer
Care services, Revenue management, Device management and other related licenses
b) Installation of ERP licenses and other related software licenses
c) Implementation of ERP with defined scope mentioned in Annexure IX (including Data Migration)
within 9 months from the date of issuance of Work Order
d) Data Migration
e) Operation and Support (Post Go - Live) for 5 years
f) Cloud Hosting (Including DR) for 5 years
g) Onsite Support / Centralized Help Desk Support for 5 years
h) Integration with existing software applications at BEST such as Core Accounting, GIS, etc
i) The proposed ERP solution should be capable of integration with the modules to be
implemented in the next phase
j) Training to users
k) Training to core team to take over the entire charge of the project – 30 Personnel
l) Preparation of end user training manual
Following table lists down the indicative ERP modules to be implemented as a part of this project -
The Implementation Agency shall provide all the services as per scope of work defined in Section 7
of this RFP document. The agency will also host the ERP Solution on any of the MeiTY empaneled
Cloud Service Provider. The BEST shall require these services for a period of 69 months (9 months
for Implementation and 60 months Operations and Support) starting from the date of issuance of
work order. The contract shall also include the provision for renewal (at the existing rates), for a
maximum period of one year, based upon the requirements of BEST, approval of the Competent
Authority and in mutual agreement with the Implementation Agency. BEST reserves all the right to
terminate or foreclose the contract at any given time, with a prior notice to the Implementation
Agency.
1 BEST invites bids against this Request for Proposal (“RFP”), from eligible bidders as per the
scope of work defined in this RFP.
2 Any contract that may result from this bidding process will be effective from the date of
Signing of Contract and shall, unless terminated earlier in accordance with its terms,
continue for a period till completion of Go-live plus five (5) years.
3 BEST reserves the right to extend the Term on mutually agreed terms at its sole discretion,
subject to any obligations under law.
4 Proposals must be received not later than the time, date and venue mentioned in the
section ‘Key Events and Dates’. Proposals that are received late will not be considered in
this RFP process.
5 While every effort has been made to provide comprehensive and accurate background
information and requirements and specifications, Bidders must perform their own research
and survey, and form conclusions about the solution needed to meet the requirements.
6 All information supplied by Bidders may be treated as contractually binding on the Bidders,
on successful award of the assignment by BEST on the basis of this RFP.
7 No commitment of any kind, contractual or otherwise shall exist unless and until a formal
written contract has been executed by or on behalf of BEST. Any notification of preferred
bidder status by BEST, shall not give rise to any enforceable rights by the Bidder. BEST
may cancel this public procurement at any time prior to a formal written contract being
executed with the Implementation Agency.
8 This RFP supersedes and replaces any previous public documentation & communications,
and Bidders should place no reliance on such communications.
9 All figures of costs, project values and others will be mentioned in Indian Rupees only.
10 No Bidder shall submit more than one Bid for the Project. An entity bidding (a) individually,
or (b) as a member of a Consortium, shall not be entitled to submit another bid either (a)
individually or (b) as a member of any Consortium.
The Tender Document Fee is specified in the Bidder’s Data Sheet in Section 2.3 above and is
non- refundable.
1. The complete bidding process will be online (e-Bidding) in the Three Cover System. All the
notification and details regarding terms and conditions related to this bid notice hereafter will
be published online on web site https://mahatenders.gov.in/.
2. Bidding documents can be seen, downloaded and submitted in electronic format on the above
website. The deadlines for submission of bid are specified in Section 2.3 of this document.
3. Bids received after the due date and the specified time (including the extended period, if any,
for any reason whatsoever, shall not be entertained.
4. The bids submitted by telex/ telegram/ fax/ email etc. shall not be considered. No
correspondence shall be entertained on this matter.
5. Technical bids will be opened as per the details found in Section 2.3 of this document.
6. Bidder should submit information and scanned copies of all the documents in PDF format in
their technical bid as per the eligibility requirements of the Bid Document.
7. Bidders may be requested to submit original documents for verification during evaluation of
technical evaluation, as and when required.
8. The Time and Date of opening of Financial Bids will be informed on the website.
9. An authorized representative of the Bidder should have valid class II / III Digital Signature
Certificate (DSC) obtained from any Certifying Authority. The authorized representative of the
Bidders shall digitally sign the original Pre-Qualification Bid, Technical Bid and Financial Bid.
The authorization shall be in the form of a written Power of Attorney accompanying the bid or
in any other form demonstrating that the representative has been duly authorized to sign.
10. As per BEST, on opening the technical bid, if is found that the Bidder has not submitted
required documents as per conditions for technical bid then the Bidder shall be intimated to
comply with the said documents within 3 days from the intimation from BEST (through
email), otherwise the bid shall be treated as non-responsive.
BEST reserves the right to accept or reject any or all the Bids without assigning any reason.
Moreover, if no intimation is provided by BEST, then the documents submitted cannot be deemed as
accepted.
1. Bidders are required to enroll on the e-Tendering website by clicking on the link provided in
the Bidder’s Data sheet.
2. The bidders shall pay the EMD/Bid Security online, through Payment Gateway / Bank
Guarantee only before the submission of Bid and shall upload the screenshot of receipt of
payment in Technical bid instead of paying the EMD in person at any of the BEST Offices.
The Technical Proposals of the bidders and Financial Proposals of the eligible bidders will be opened
as per the time-table mentioned in Section 2.3. Any changes to the schedule shall be displayed on
the Portal (https://mahatenders.gov.in).
1. The Bidders are responsible for all costs incurred in connection with participation in this
process, including, but not limited to, costs incurred in the conduct of informative and other
diligence activities, participation in meetings/discussions/presentations, preparation of bid, in
providing any additional information required by BEST to facilitate the evaluation process, and
in negotiating a definitive Contract or all such activities related to the bid process. BEST will,
in no case, be responsible or liable for those costs, regardless of the conduct or outcome of
the bidding process.
2. This RFP document does not provide any commitment by BEST to award a contract or to
engage in negotiations with any of the bidders. Further, no reimbursable costs may be
incurred in anticipation of award. All materials submitted by the Bidder shall become the
property of BEST and may be returned at its sole discretion.
1. BEST will host a Pre-bid Meeting for queries (if any) raised by the prospective bidders. The
details regarding the date, time and place of the meeting are provided in the Bidder’s Data
Sheet in Section 2.3. A maximum of two representatives of each of the bidder may attend the
pre-bid meeting upon the production of an authority letter from the bidder, at their own cost.
The purpose of the pre-bid meeting is to provide a forum to the bidders, to clarify their
doubts / seek clarification or additional information, necessary for them to submit their bid.
2. All enquiries from the bidders, relating to this bid document must be submitted to the
designated contact person as mentioned in the Bidder’s Data Sheet. The queries
should necessarily be submitted in the format given below and strictly in the form of
an excel sheet only.
3. An Authorization Letter in the name of the person attending the pre-bid meeting needs to be
submitted on the letterhead of the Bidder, during the pre-bid meeting (as per the format
specified in Annexure VII).
4. The queries submitted post the specified deadline or which do not adhere to the specified
format may not be responded to. All responses to the queries (Clarifications / Corrigendum)
shall be made available on the website (https://mahatenders.gov.in/).
1. Bidders shall pay, along with their Bids, EMD amount as mentioned in Section 2.3, and it shall
be paid online. The bidders shall pay the EMD through Online Payment Gateway/ Bank
Guarantee only.
2. In case a bid is submitted without the EMD as mentioned above, then BEST reserves the right
to reject the bid, without providing an opportunity for any further correspondence to the
bidder concerned.
3. The EMD shall be denominated in Indian Rupees only. No interest shall be paid by BEST
towards the deposited EMD.
4. All the bidders shall have to deposit Earnest Money Deposit in e-Payment mode or
by submission of Bank Guarantee at our Kussara, Mazgaon Office.
5. The Earnest Money Deposit paid by the unsuccessful bidders will be returned after finalization
of the tender, by e-payment mode only to the same account, from which it was paid.
6. The EMD may be forfeited in any of the following cases:
i. If a Bidder withdraws its bid or increases its quoted prices during the period of bid
validity or its extended period, if any.
ii. In the case of a successful Bidder, if the Bidder fails to sign the Contract or to furnish
Performance Bank Guarantee within specified time in accordance with the format given
in this bid document.
iii. During the bid process, if a Bidder indulges in any such deliberate act as would
jeopardize or unnecessarily delay the process of bid evaluation and finalization.
iv. During the bid process, if any information is found wrong / manipulated / hidden in the
bid.
7. The decision of BEST regarding forfeiture of the EMD and rejection of bid shall be final and
shall not be called upon question under any circumstances.
8. The EMD of Successful bidder will be returned after the award of contract and submission of
the performance Bank Guarantee within specified time.
9. No rejections and forfeiture shall be done in case of curable defects. For non-curable defects,
EMD shall be forfeited and the bid will be liable for rejection.
Note:
1) Curable Defects shall mean shortfalls in submission such as -
a. Non-submission of following documents
□ Valid Registration Certificate.
□ Valid Bank Solvency
□ GST Registration Certificate
□ Certified Copies of PAN documents and photographs of individuals, owners,
etc.
□ Partnership Deed and any other documents
□ Undertakings as mentioned in the tender document
b. Wrong calculation of Bid Capacity
Notwithstanding anything contained in this RFP, BEST reserves the right to accept or reject any bid
and to annul the Bidding Process and reject all Bids, at any time without any liability or any
obligation for such acceptance, rejection or annulment, and without assigning any reasons. In the
event that the Authority rejects or annuls all the Bids, it may, in its discretion, invite all eligible
Bidders to submit fresh bids hereunder.
BEST reserves the right to reject any Application and/ or Bid if:
a. at any time, a misrepresentation is made or uncovered, or
b. the bidder does not provide, within the time specified by the Authority, any supplementary
information sought by the Authority for evaluation of the Application.
In case it is found during the evaluation or at any time before signing of the Agreement or after its
execution and during the period of subsistence thereof including the concession thereby granted by
BEST, that one or more of the pre-qualification conditions have not been met by the Bidder, or the
Bidder has made any misrepresentation or has given any incorrect or false information, the Bidder
shall be disqualified forthwith if not yet appointed as the Successful Bidder either by issue of the LOA
(Letter of Approval) or entering into of the Agreement, and if the Bidder has already been issued the
LOA or has entered into the Concession Agreement, as the case may be, the same shall,
notwithstanding anything to the contrary contained therein or in this TENDER, be liable to be
terminated, by a communication in writing by BEST to the Bidder, without Bidder being liable in any
manner whatsoever to the Bidder and without prejudice to any other right or remedy which BEST
may have under this TENDER, the Bidding Documents, the Concession Agreement or under
applicable law. BEST reserves the right to verify all statements, information and documents
submitted by the Bidder in response to the TENDER. Any such verification or lack of such verification
by BEST shall not relieve Bidder of its obligations or liabilities hereunder nor will it affect any rights of
BEST there under.
The bid shall be rejected if the bidder-
a. Stipulates the validity period less than 180 days.
b. Stipulates own terms and condition/conditions.
c. Does not fill and (digitally) sign undertaking forms, which are incorporated, in the document.
Bidders requiring any clarification on the tender may notify BEST in writing or by e-mail. They should
send in their queries before the date specified in the Section 2.3. BEST shall Endeavour to respond to
the queries within the period specified therein. The responses will be sent by letter and/or e-mail.
BEST will forward all the queries and its responses thereto, to all purchasers of the RFP without
identifying the source of queries.
BEST shall endeavor to respond to the questions raised or clarifications sought by the Bidder.
However, BEST reserves the right not to respond to any question or provide any clarification, in its
sole discretion, and nothing in this Clause shall be taken or read as compelling or requiring the BEST
to respond to any question or to provide any clarification, but not later than the date provided in
Section 2.3 of this document.
BEST may also on its own discretion, if deemed necessary, issue interpretations and clarifications to
all the Bidders. All clarifications and interpretations issued by BEST shall be deemed to be a part of
the tender document. Verbal clarifications and information given by BEST or its employees or
representatives shall not in any way or manner be binding on the BEST.
At any time prior to the deadline for submission of Application, BEST may, for any reason, whether at
its own initiative or in response to clarifications requested by any Bidder, modify the tender by the
issuance of Addendum.
Any Addendum thus issued will be sent in writing/ email to all those who have purchased the RFP. In
order to afford the Bidder a reasonable time for taking an Addendum into account, or for any other
reason, BEST may, in its sole discretion, extend the bid submission due date.
1. BEST may terminate the bid process at any time and without assigning any reason. BEST
makes no commitments, express or implied, that this process will result in a business
transaction with anyone.
2. This bid document does not constitute an offer by BEST. The Bidder's participation in
this process may result in BEST selecting the Bidder to engage in further discussions and
negotiations towards execution of a contract. The commencement of such negotiations does
not, however, signify a commitment by BEST to execute a contract or to continue
negotiations. BEST may terminate negotiations at any time without assigning any reason.
1. A valid Bank Solvency Certificate of amount as mentioned in Section 2.3, that has been issued
not more than six months prior to the date of submission of bid, needs to be submitted in the
Technical Bid.
1. No bid should be withdrawn in the interval between the bid submission deadline and the
expiration of the bid validity period specified in the Bidder’s Data Sheet. Withdrawal of a bid
during this interval may result in the forfeiture of the bidder’s EMD.
2. No bid may be altered/ modified after submission to BEST. Unsolicited correspondences in
this regard from bidders will not be considered.
The bid shall strictly be prepared as per the formats specified in this RFP document. The bids
submitted with deviation from the said formats will be rejected.
The following table enlists the documents to be submitted by the bidders as a part of the proposal.
However, it is responsibility of the respective bidders to make sure that all the requirements as
specified in this RFP document are complied with.
□ Bidders shall furnish the required information on their Pre-Qualification, Technical and
Financial bids in the specified formats only. Any deviations from formats may make the bid
liable for rejection. Disclosure of pricing information in Pre-Qualification or Technical proposal
shall be sufficient grounds for rejection of the bid.
□ The bidders shall categorically provide their Email-ID in Technical Bid.
A firm or an individual blacklisted / banned by any government organization in accordance with their
guidelines shall be ineligible to be awarded a BEST - Financed Contract, or to benefit from a BEST-
Financed Contract, financially or otherwise, during such period of time, as BEST shall determine.
Bidder should have at least one office in Mumbai Metropolitan Region (MMR) (Mumbai / Navi Mumbai
/ Thane). If not, it should open an office in the MMR region within 3 months of the Award of
Contract.
Only bidders complying the Pre - qualification Criteria shall be eligible to participate in this tender
process. The minimum eligibility criteria that should be satisfied by the bidders are mentioned below.
The formats for the Pre-qualification documents are given in Annexures of this RFP, unless specified
otherwise.
The Prime Bidder / Lead Bidder of Consortium, herein also referred as ‘Bidder’, shall be primarily
accountable for the implementation of the entire scope of the project. Only the Lead Member will
submit the Proposal and sign the Contract with BEST. In case of a Consortium, the same should not
consist of more than 2 members. None of the bidders or their subsidiary company or member of
the consortium should be in the same business domain as BEST i.e. Electric Supply and Transport.
The consortia shall submit a valid Agreement on a Stamp Paper as per format (i.e.
Annexure XXIX), signed by the Authorized Signatories of the Companies under Consortium,
and dated prior to the submission of the bid.
The Agreement shall clearly specify the details of Prime bidder, details of each Member of the
Consortium, Stake of each Member and shall also outline the Roles and Responsibilities of each
Member. All the members of the Consortium shall be jointly and severally liable to complete the
project; however, Prime Bidder shall give an undertaking for successful completion of the project and
shall be accountable for the same. In case of any issues, Prime Bidder will be liable for all penalties.
The Agreement between the Prime Bidder and each Member of the Consortium should be for the
entire duration of the Project and the same shall be submitted along with the Bid document. The
Consortium Agreement shall also specify their exclusive association for this bid and joint
responsibility for their respective scope.
Original Equipment Manufacturer (OEM) is defined as the developer of Commercial off the-shelf or
commercially available off-the-shelf (COTS) packaged Enterprise Resource Planning software who
hold the intellectual property rights for the same. ERP with Power Utility Software solution offered by
the prime bidder should be available Commercially Off-The-Shelf (COTS). The software/application
should be readily deployable with or without configuration to suit the BEST’s specific process
requirements and does not involve developing the application from scratch.
BEST shall sign the contract with the Lead Bidder only. All payments shall be made to the Lead
Bidder only. However, the names of all the Consortium Members shall be included in the contract.
10. The Bidder should have valid All Copy of the documentary proof of
Income Tax Returns for the last Consortium Income Tax Returns for the last
three Assessment Years (2017-18, members three Assessment Years. Provide
2018-19 and 2019-20) and the *** copy of PAN card
Bidder (not individual) should have
a PAN Card
11. The Bidder should possess a valid All Valid E.P.F. Registration
registration certificate under E.P.F. Consortium Certificate
& M.P, Act 1952 members
***
Note :
*** In case of bidder (other than lead bidder) who is not having Company registered
under Indian Companies Act, 1956 (Amended in 2013), should submit certificate
relevant jurisdiction of the country where their company / firm is registered (Documents
mentioned in eligibility criteria 1, 10, 11& 12). Lead bidder should be registered under
Indian Companies Act, 1956 (Amended in 2013).
Technical Evaluation of the bids would be carried out on following broad parameters –
□ The Technical Bids of only those Bidders, who qualify in the Pre-Qualification stage, shall be
considered and will be evaluated as per the evaluation criteria in this clause. The Bid
Evaluation Committee shall invite each Bidder to make a presentation-cum-demonstration as
a part of the technical evaluation.
□ The Committee may require verbal/written clarifications from the Bidders to clarify
ambiguities and uncertainties arising out of the evaluation of the Bid documents (to be stated
precisely as it should be in BEST's interest). In order to qualify technically, a Bid must secure
a minimum 70% marks in technical evaluation. Only those Bids which have a minimum score
of 70% of total marks in technical evaluation will be considered for opening of their
Commercial Bid. However, the General Manager (GM), BEST reserves the right to lower the
minimum required marks to 60% of total marks if none of the Bidders achieves 70% of the
total marks. Only the Bids qualifying the technical evaluation will be considered for
commercial evaluation.
□ The bidders' technical solutions proposed in the bid document will be evaluated as per the
requirements specified in the Bid document and adopting the evaluation criteria spelt out is
below.
The above 4 evaluation categories are further divided into various sub-categories (i.e. in
Category A, B, C, D) as mentioned below –
Qualifying criteria for bidders is given in Section 5.3 and Section 5.4. Over and above these
criteria, bidders shall be rated on the following parameters:
each other such as husband, wife, father/mother and minor son/daughter and brother/sister
and minor brother/sister, shall not tender separately under different names for the same
contract.
3. If it is found that firms have tendered separately under different names for the same
contract, all such tender(s) shall stand rejected and tender deposit of each such
firm/establishment shall be forfeited. In addition, such firms/establishments shall be liable, at
the discretion of the General Manager (BEST), for further penal action including blacklisting.
4. If it is found that close relatives (as described above) have uploaded separate
tenders/quotations under different names of firms/establishments but with common address
for such establishments/firms and/or if such establishments/ firms, though they have
different addresses, are managed or governed by the same person/persons jointly or
severally, such tenders shall be liable for penal and legal action including blacklisting.
5. If after awarding the contract it is found that the accepted tender violated any of the
directions pertaining to participation as stated above, the contract shall be liable for
cancellation at any time during its validity in addition to penal action including blacklisting
against the contractors as well as related firm/establishment.
The proposals shall be valid for a period of 180 days from the date of opening of Technical Bid. A
proposal valid for a shorter period may be rejected as non-responsive. In exceptional circumstances,
at its discretion, BEST may solicit the bidder's consent for an extension of the validity period. The
request and the responses thereto shall be made in writing or by email.
1. The bidders are advised to exercise adequate care in quoting the prices. No excuse for
corrections in the quoted figures will be entertained after the Commercial Proposals are
received by BEST.
3. The amount stated in the Commercial Proposal, adjusted in accordance with the above
procedure and as stated in Annexure-III of this RFP, shall be considered as binding on the
bidder for evaluation.
1. The bidder shall quote for this project as per the requirements of the RFP.
3. The bidder should quote the fee considering all costs including the costs insurance for the
Contract Period, travel / stay, daily allowance or any other allowances with respect to their
staff deployed for the execution of this project before or after the award of the Contract.
4. The bidder should provision for GST and any other levies, as applicable.
5. The prices, once offered, must remain fixed and must not be subject to change for any
reason whatsoever within the period of the validity of the proposal and the contract. No
revision of the fee shall be made on account of any variations in costs of labor and
materials, currency exchange fluctuations with international currency or any other cost
component affecting the total cost in fulfilling the obligations under the contract. A
proposal submitted with an adjustable price quotation or conditional proposal may be
rejected as non-responsive.
6. All costs incurred due to delay of any sort, which is attributable to the bidder, shall be
borne by the bidder.
7. The selected Bidder should submit the break- up of the costs as per reference tables in the
soft format within three working days from the date of opening of the Commercial bid.
Also the selected bidder has to submit the further commercial breakup as required by
BEST which will be informed after selecting the bidder.
The proposal and all related correspondence and documents in relation to the bidding process shall
be in English language. The supporting documents and printed literature furnished by the bidder with
the proposal may be in any other language, provided that they are accompanied by translations of all
the pertinent passages in the English language, duly authenticated and certified by the authorized
person of the bidder. The supporting materials, which are not translated into English, may not be
considered for evaluation purpose. For the purpose of intSAPretation and evaluation of the proposal,
the English language translation shall prevail.
1. This RFP is not an offer and is issued with no commitment. BEST reserves the right to
withdraw the RFP and change or vary any part thereof, at any stage. BEST also reserves
the right to disqualify any bidder should it be so necessary at any stage.
2. Timing and sequence of events resulting from this RFP shall ultimately be determined by
BEST.
3. No verbal conversations or agreements with any official, agent, or employee of BEST shall
affect or modify any terms of this RFP and any alleged verbal agreement or arrangement
made by a bidder with any agency, official or employee of BEST shall be superseded by the
definitive agreement that results from this RFP process. Verbal communications by BEST to
bidders shall not be considered binding on it, nor shall any written materials provided by
any person other than BEST.
4. Neither the bidder nor any of the bidder’s representatives shall have any claims whatsoever
against BEST or any of their respective officials, agents, or employees arising out of or
relating to this RFP or these procedures (other than those arising under a definitive service
agreement with the bidder in accordance with the terms thereof).
5. Until the Contract is awarded and during the validity of the Contract, bidders shall not,
directly or indirectly, solicit any employee of BEST to leave the same or any other officials
involved in this RFP process in order to accept employment with the bidder, or any person
acting in collusion with the bidder, without prior written approval of BEST.
All proposals and accompanying documentation of the Technical Proposal will become the property
of BEST and will not be returned after opening of the Technical Proposals. BEST is not restricted in
its rights, to use or disclose any or all of the information contained in the proposal and can do so
without compensation to the bidders. BEST shall not be bound by any language in the proposal
indicating the confidentiality of the proposal, or any other restriction on its use or disclosure.
A proposal may be construed as a non-conforming proposal and ineligible for consideration if:
1. It does not comply with the requirements of this RFP.
2. It does not follow the format requested in this RFP or does not appear to address the
requirements as specified by the directorate.
5.14 Disqualification
The proposal is liable to be disqualified in the following cases or in case the bidder fails to meet the
requirements as indicated in this RFP:
1. The proposal is not submitted in accordance with the procedure and formats prescribed in
this document or treated as non-conforming proposal.
2. During validity of the proposal, or its extended period, if any, the bidder increases the
quoted prices.
4. The proposal is received in incomplete form, received after due date, not accompanied by
all the requisite documents, not accompanied by the EMD or the bidder has quoted only for
a part of the project
8. In case any one bidder submits multiple proposals or if common interests are found in two
or more bidders, the bidders are likely to be disqualified, unless additional proposals are
withdrawn upon notice immediately.
9. The bidder fails to deposit the Performance Bank Guarantee or fails to enter into a Contract
within 15 Days of the date of issue of Letter of Intent or within such extended period, as
may be specified by the BEST.
10. Any bid received by BEST after the deadline for submission of bids shall be declared late
and will be rejected, and returned unopened to the bidder at BEST’s discretion.
11. While evaluating the proposals, if it comes to BEST’s knowledge expressly or implied, that
some bidders may have colluded in any manner whatsoever or otherwise joined to form an
alliance resulting in delaying the processing of proposal then the bidders so involved are
liable to be disqualified for this Contract as well as for a further period of four years from
participation in any of the RFPs floated by BEST.
12. If the Technical Proposal contains any information on price, pricing policy, pricing
mechanism or any information indicative of the commercial aspects of the bid.
By submitting the proposal, each bidder shall be deemed to acknowledge that he has carefully read
all sections of this RFP, including all forms, schedules, annexure, corrigendum and addendums (if
any) hereto, and has fully informed itself as to all existing conditions and limitations.
The bidders are welcome to visit the site/s and obtain additional information at their own cost and
responsibility. However, a prior appointment with the concerned official(s) is recommended.
1 BEST shall constitute a Bid Evaluation Committee to evaluate the responses of the
bidders.
2 The Bid Evaluation Committee shall evaluate the responses to the RFP (cover A and
Cover B) and all supporting documents / documentary evidence. Inability to submit
requisite supporting documents / documentary evidence, may lead to rejection.
3 The decision of the Bid Evaluation Committee in the evaluation of responses to the RFP
shall be final. No correspondence will be entertained outside the process of negotiation/
discussion with the Committee.
4 The Bid Evaluation Committee may ask for meetings with the bidders to seek
clarifications on their proposals. The bidder shall submit requisite supporting
documents/ certificates on the credentials. The committee may visit bidder’s client site
to validate the credentials/ citations claimed by the bidder.
5 The Bid Evaluation Committee reserves the right to reject any or all proposals entail the
basis of any deviations.
6 Each of the responses shall be evaluated as per the criterions and requirements
specified in this RFP.
7 The Bid Evaluation Committee would submit its decision to the competent authority
whose decision would be final and binding upon the bidders.
1. The evaluation process of the bid proposed to be adopted by BEST is indicated in this section.
The purpose of this section is to provide the Bidder an idea of the evaluation process that
BEST may adopt.
2. The bids that are submitted online successfully shall be opened as per date and time as
mentioned in the Bid Data Sheet.
3. Total transparency will be observed and ensured while opening the Bids.
4. BEST reserves the right to postpone or cancel a scheduled Bid opening.
5. BEST shall appoint a Proposal Evaluation Committee (PEC) to scrutinize and evaluate the
technical and commercial bids received. The PEC committee will be constituted by the
General Manager (GM), BEST or his authorized representative. The PEC will examine the bids
to determine whether they are complete, responsive and whether the bid format conforms to
the bid requirements.
6. The Committee may seek inputs from their professional and technical experts in the
evaluation process.
7. BEST reserves the right to do a reference check of the past experience stated by the Bidder.
Any feedback received during the reference check shall be taken into account during the
Evaluation Process.
8. The Proposal Evaluation Committee reserves the right to reject any or all the proposals on the
basis of any deviation without assigning any reason thereof.
9. There should be no mention of bid prices in any part of the bid other than the Commercial
Bid.
10. Any attempt by a bidder to influence the bid evaluation process may result in the rejection of
Bid.
11. In the event of the specified date of the Bid opening being declared a holiday for BEST, the
bids shall be opened at the same time and location on the next working day. In addition to
that, if the representatives of the Bidder remain absent, BEST will continue the process and
open the bids of all the Bidders.
1. Only bids that are opened payment gateway or if Bank Guarantee is submitted on or before
17.00 Hours on the Bid Closing date at our office, shall be considered further.
2. All the bids shall be opened online one at a time, reading out the name of the Bidder, the
presence of an EMD, and any other details as BEST may consider appropriate.
3. BEST shall prepare a record of the bid opening that shall include, at a minimum: the name of
the Bidder and the presence or absence of EMD.
4. Once the bids are opened, each bid will be evaluated for pre-qualification criteria.
a) Bidders should necessarily give the financial details in the formats given in Annexure III of
this RFP. All the financial details should be given in the prescribed format only and in
accordance o the details and terms and conditions as mentioned in the RFP (hence the Bidder
is expected to understand the RFP in all respects). In case the selected bidder does not quote
for or provision for any hardware / software / any other expenses required to meet the
requirements of the RFP, bidder shall be solely responsible for those and would be required
to provide them, without any additional cost to BEST.
b) The Bidder is expected to price all the items and services sought in the RFP and proposed in
the Technical Proposal. The Bid should be comprehensive and inclusive of all the services to
be provided by the Bidder as per the scope of his work and must cover the entire Contract
Period.
c) The Commercial bids shall not be opened by BEST until the evaluation of the Technical
Proposals has been completed.
d) BEST may seek clarifications from the Bidder on the Technical Proposal. Any of the
clarifications by the Bidder on the Technical Proposal should not have any commercial
implications. The Commercial Proposal submitted by the Bidder should be inclusive of all the
items in the Technical Proposal and should incorporate all the clarifications provided by the
Bidder on the Technical Proposal during the evaluation of the technical offer.
e) If a Financial Proposal is seriously unbalanced or front loaded in the opinion of BEST, BEST
may require the Bidder to produce detailed analyses for any or all items of the Technical and
Commercial Proposals, to demonstrate the internal consistency of those prices with the
methodologies and staffing proposed. After evaluation of the price analysis, taking into
consideration the schedule of estimated contract payments, BEST may require that the
amount of the Performance Bank Guarantee be increased at the expense of the Bidder to a
level sufficient to protect BEST against financial loss in the event of default of the successful
Bidder under the Contract.
f) The Commercial Bids will be evaluated by BEST for completeness and accuracy. Arithmetical
errors will be rectified on the following basis-
□ If there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail and the total price shall
be corrected.
□ If there is an error in a total corresponding to the addition or subtraction of subtotals, the
subtotals shall prevail and the total shall be corrected.
□ If there is a discrepancy between words and figures, the amount in words will prevail
unless the amount expressed in words is related to an arithmetic error, in which case the
amount in figures shall prevail subject to the points above.
g) The amount stated in the proposal form, adjusted in accordance with the above mentioned
procedure, shall be considered as binding, unless it causes the overall proposal price to rise,
in which case the proposal price shall govern.
h) If the bidder does not accept the correction of errors, its bid will be rejected and the EMD
may be forfeited.
i) Activities and items described in the Technical Proposal but not priced, shall be assumed to
be included in the prices of other activities or items. In case an activity or line item is
quantified in the Financial Proposal differently from the Technical Proposal, the Evaluation
Committee shall correct the quantification indicated in the Financial Proposal so as to make it
consistent with that indicated in the Technical Proposal, apply the relevant unit price included
in the Financial Proposal to the corrected quantity and correct the total Proposal cost.
j) Commercial Proposal shall not contain any technical information.
a) Each Technical Proposal shall be assigned a technical score out of a maximum of 100
points.
b) Bidders who have scored minimum 70 marks in Technical Evaluation will be considered
for Financial Bid Evaluation.
c) The Financial Proposals of Bidders who do not qualify technically shall be kept unopened
in the e-Tendering system.
d) BEST reserves the right to accept or reject any or all bids without giving any reasons thereof.
e) BEST shall inform to the technically shortlisted Bidders about their technical score, date
and venue of the opening of the financial proposals.
f) The technically qualified bidders will further be selected using QCBS (Quality and Cost Based
Selection) method with Technical Score contributing towards 70% weight age and
Commercial Score contributing towards 30% weightage. The Technical Score (Ts) of the
bidder for the Technical Bid Component is calculated as below:
□ The bidder with Highest Qualifying Technical Bid will be awarded 100 marks (TH).
□ The Technical bid score of other qualifying bidder shall be computed as below.
Technical bid Score of the Bidder (Ts) = (Technical Bid score of the respective
Bidder/ TH) X 100 (Rounded off to two decimal places)
g) The Financial Score (Fs) of the bidder for the Commercial Bid Component as calculated below
□ The bidder with Lowest Qualifying Commercial Bid (CL) will be awarded 100 marks.
□ The Financial bid score of other qualifying bidder shall be computed as below
Financial bid score of the Bidder (Fs) = (CL/ Commercial Bid of the respective
Bidder) X 100 (Rounded off to two decimal places)
h) The overall score will be calculated as follows:-.
CBS = 0.70 Ts + 0.30 Fs
Where:
CBS = Final Composite Bid Score
Ts = Technical score of the bidder (out of maximum of 100 marks)
Fs = Financial Score of the bidder (out of maximum of 100 marks)
i) The overall commercial score will be determined on basis of format given in Annexure
III, following which the bidder with the highest score will be awarded the contract.
j) Please note invitation of price discovery rate for additional work (variable component)
does not imply guarantee of any additional work or any increase in scope. The price
discovery rates are being invited to meet any exigency requirements if a need emerges
during the period of contract.
1. Prior to the expiration of the period of bid validity, the Bidder will be notified in writing or by
email that their bid has been accepted.
2. At the time BEST notifies the successful Bidder that its bid has been accepted, BEST will send
the Bidders the proforma for Contract, incorporating all clauses/agreements between the
parties. The successful Bidder shall sign and date the Contract and return it to BEST within
30 days. Draft Format of the contract has been included in the bid document.
The validity of the period of the Contract will be for 5 years after Go – Live.
BEST reserves the rights to extend this contract based on mutual consent, subject to successful
implementation and result of performance delivery.
1. The Bidder shall at his own expense, deposit with BEST, within fifteen (15) working days of
the notification of award of the contract an unconditional and irrevocable Performance Bank
Guarantee (PBG) from the list of approved banks (specified in the bid document) as per the
format given in this bid, payable on demand, for the due performance and fulfilment of the
contract by the Bidder.
2. This Performance Bank Guarantee will be for an amount equivalent to 10% of the total
contract value. All charges whatsoever such as premium, commission, etc. with respect to the
Performance Bank Guarantee shall be borne by the Bidder.
3. Details on validity of the performance bank guarantee are specified under Section 2.3 of this
document. The Performance Bank Guarantee letter format is at 9.5 in this document.
4. The Performance Bank Guarantee may be discharged/ returned by BEST upon being satisfied
that there has been due performance of the obligations of the Bidder under the contract.
However, no interest shall be payable on the Performance Bank Guarantee.
5. In the event of the Bidder being unable to service the contract for whatever reason, BEST
would evoke the PBG. Notwithstanding and without prejudice to any rights whatsoever of
BEST under the Contract in the matter, the proceeds of the PBG shall be payable to BEST as
compensation for any loss resulting from the Bidder’s failure to complete its obligations under
the Contract. BEST shall notify the Bidder in writing of the exercise of its right to receive such
compensation within 14 days, indicating the contractual obligation(s) for which the Bidder is
in default.
6. The 30 days notice period shall be considered as the ‘Cure Period’ to facilitate the
Implementation Agency to cure the breach. The PBG shall be evoked only if the breach is
solely attributable to the bidder and the bidder fails to rectify the breach within the ‘Cure
Period’.
7. BEST shall also be entitled to make recoveries from the Bidder’s bills, performance bank
guarantee, or from any other amount due to the Bidder, the equivalent value of any payment
made to the Bidder due to inadvertence, error, collusion, misconstruction or misstatement.
8. BEST shall also be entitled to make recoveries from the Bidder’s bills, performance bank
guarantee, or from any other amount due to the Bidder, the equivalent value of any payment
made to the Bidder due to inadvertence, error, collusion, misconstruction or misstatement.
6.10 Failure to agree with the Terms and Conditions of the Bid/Contract
□ Failure of the Bidder to agree with the Terms and Conditions of the bid/Contract shall
constitute sufficient grounds for the annulment of the award of contract, in which event the
contract may be awarded to the next most responsive Bidder which means the bidders who
has score second highest as per evaluation method.
□ In case, if any certificates produced by the bidder during bid submission are not genuine or
after placing the work order to the selected bidder, it is revealed that bidder does not poses
the required qualifications or resources as mentioned in pre-qualification criteria or technical
evaluation then suitable action/penalty such as forfeiture of EMD/ Security Deposit /
Performance Bank Guarantee will be taken.
Bidder is required to refer to the draft Contract Agreement, provided in this bid, for all the terms and
conditions (including project timelines) to be adhered by the successful Bidder during Contract
period. Please note that one needs to read the Contract Agreement as a whole document; and the
Annexure mentioned there-in may not correspond to the bid Annexure.
□ This RFP is not an offer and is issued with no commitment. BEST reserves the right to
withdraw the RFP and change or vary any part thereof at any stage. BEST also reserves
the right to disqualify any Bidder should it be so necessary at any stage.
□ Timing and sequence of events resulting from this RFP shall ultimately be determined by
BEST.
□ No oral conversations or agreements with any official, agent, or employee of BEST shall
affect or modify any terms of this RFP and any alleged oral Agreement or arrangement
made by a Bidder with any BEST, agency, official or employee of BEST shall be
superseded by the definitive Agreement that results from this RFP process. Oral
communications by BEST to Bidders shall not be considered binding on it, nor shall any
written materials provided by any person other than BEST.
□ Neither the Bidder nor any of the Bidder’s representatives shall have any claims
whatsoever against BEST or any of their respective officials, agents, or employees arising
out of or relating to this RFP or these procedures (other than those arising under a
definitive service Agreement with the Bidder in accordance with the terms thereof).
□ Until the Contract is awarded and during the validity of the Contract, Bidders shall not,
directly or indirectly, solicit any employee of BEST to leave BEST or any other officials
involved in this RFP process in order to accept employment with the Bidder, or any person
acting in collusion with the Bidder, without prior written approval of BEST.
7 Scope of Work
The services of Implementation Agency (henceforth referred to as ‘IA’) or Service provider will be
required to implement and support ERP solution across the Electric Supply Division of BEST
Undertaking. The Prime Bidder shall be the SPOC (Single Point of Contact) for BEST and for this
assignment. The total duration of the contract is 6 years. This includes Nine (9) months of
Implementation and Five (5) years of Maintenance and Services. The major deliverables to be
submitted by the IA are as follows –
The IA shall submit survey documents for the readiness required at all BEST offices. Site preparation
will be required at all locations proposed under this project and a detailed survey and gap analysis
shall be done by the IA after coming on-board.
The available documents on Process Study, ‘To Be’ processes and Functional Requirement
Specifications will be shared with the IA at the onset of the assignment. The IA will conduct a
detailed Business Process Study and propose detailed Process Changes/Improvements, with due
business justification that would be facilitated/ necessitated in ERP environment;
1. Identify information requirements for each business process
2. Identify data conversion elements for each business process
3. Identify the legacy systems that may be retained, sunset and interface
The different Aspects of the Survey are covered in the table below -
bidder.
Retaining 1 All functional 1 If certain processes
Key requirements are met by cannot be covered
Functionaliti the ERP Solution. by standard ERP
es 2 The IA shall not carry out Solution, the IA
any invasive customization must suggest,
to the ERP code without develop and
prior approval of the implement suitable
Project Management workaround
Team. solutions, process
3 Any customization shall changes, legacy
ensure that future system interfaces or
upgrades, enhancements extensions to ERP
and bug fixes related to to cover the same
the ERP product are not after obtaining
impacted. necessary approvals
from the purchaser
Ensuring 1 The solution implemented 1 Solution both in
Solution must be easily scalable. terms of number of
Scalability 2 Scalability both in terms of users as well as in
number of users as well terms of the new
as in terms of the new modules from the
module. same ERP suite
3 Solution scalability is which BEST may
particularly important decide to
given the projects implement in the
underway. future.
The solution should be available Commercially Off-The-Shelf (COTS). The software/application should
be readily deployable with or without configuration to suit the specific process requirements and
does not involve developing the application from scratch. The solution should be enterprise wide
integrated application. The solution should provide the Source Code for Customization as per the
license agreement. The solution should support localization features for India taxes and provides the
legal changes for these taxes as a support package from time to time. The solution should provide
integrated tool for monitoring of the implementation, administration and operation of the software.
OEM Scope
BEST expects OEM to play an important role during ERP implementation, Quality Review, Audit &
Other Services in BEST. SI/ IA is required to engage experienced ERP OEM consultants to provide
services in areas listed below by deploying at least one functional or technical consultant and directly
participating in -
Sr. No. Audit Service s Activities Involved
1. Global 1. Reviewing each blueprint
Blueprinting 2. Conduct audit for each core function (including but
not limited to Power Utility Software, CRM, Enterprise
Portal, Business Intelligence and Business Objects,
Mobile Platform, Device Management, GRC etc.)
3. OEM consultants will join SI consultants & also give
observations at the end of each blueprinting stage.
2. Realization 1. Activities where configuration is taking place for each
core function for review configurations and
developments
2. Conduct audit where technical activities (including but
not limited to customization, integration,
developments, server preparation etc.) are taking
place.
3. OEM consultants will join SI consultants will also give
observations at the end of realization stage.
3. Pre-Go Live & 1. Activities for each core function during pre-go-live/
Testing testing to review preparedness of system, users and
organization.
2. Conduct audit.
3. OEM consultants will join SI consultants & also give
observations at the end of pre go-live / testing stage.
4. Process & 1. Guiding BEST & SI on Role Assignment and SoD Matrix
System development.
Compliance 2. Testing across the lifecycle of the project.
3. OEM consultants will join SI consultants to review risks
of access, conflicts and risks and SoD compliance
5. Knowledge 1. Knowledge Transfer to Core team as well as End-User
Transfer enablement by deploying at least one consultant for
each core function (functional or technical).
2. Each consultant is expected to leverage OEM approved
content and tools, if any, for imparting such training
and education services for a total of at least 10 man-
days across each core technical and functional domain.
3. OEM consultants will join SI consultants to review
training strategy, training content, execution &
knowledge transfer for future sustenance. Also they
will plan the strategy for training to core team
Program Governance: In addition to the audit services mentioned above, OEM will need to deploy
a Senior Program Manager (preferably full-time) to review the Project on a periodic basis covering
project management, implementation roadmap, compliance to key deliverables, and critical success
factors to identify potential risks and recommend corrective actions. It will be the responsibility of the
bidder to incorporate time of the OEM project manager over and above the audit effort and make
necessary changes as per the recommendations of the OEM Audit Team.
The details regarding the execution period of the contract scope is as under –
Implementation Agency needs to implement/ incorporate all the functions of the legacy applications
(currently in operation at BEST) and the activities those are not yet computerized in new ERP
Project. Implementation Agency will also be responsible for BEST wide ERP and Power Utility
Software implementation.
Details about required ERP licenses are mentioned in Annexure IX. It is expected that the
Implementation Agency will study the requirement at BEST and propose the licenses which needs to
be procured from OEM to implement ERP COTS solution along with Power Utility software at BEST.
Details of ERP licenses with BEST are mentioned in Annexure IX. Additionally, the Implementation
Agency shall ensure all newly developed Application Software is in compliant with all applicable
regulatory requirements, and with BEST quality standards including but not limited to BEST IT
policies/ IT Policies issued by Government of Maharashtra/ IT Policies issued by Government of
India.
Please Note: ERP application with cloud infrastructure by the Implementation Agency should be
audited from any of the CERT-IN empaneled agency or the developed application software
should be STQC certified. It will be the responsibility of the Implementation Agency to obtain ‘Safe-
to-Host’ certificate from CERT-in empaneled organization before deployment of the ERP applications
at the data center. Required related reports, logs should be arranged within stipulated time.
The Implementation Agency must develop a comprehensive and detailed approach and strategy for
the Implementation of ERP Project and products mentioned as per Annexure IX for BEST including,
but not limited to the following (Service Provider may propose others, based on their strategy/
methodology) –
Customization/ Development should be kept to a minimum (not more than 20%) and industry best
practices should be adhered to. Wherever absolutely required, Customization/ Development should
be done in a manner that it gives a reasonable assurance of upward compatibility with future
versions of the ERP platform.
All the development must meet the requirements for security, performance, ease of use for
operations, administration and management. Typically, ERP recognized or ERP OEM’s industry
standard methodologies should be used.
It will also be the responsibility of the Implementation Agency to ensure proper user management
/access controls mapping with all new ERP Systems using GRC. Implementation Agency needs to
make sure to implement middleware for the interfaces to be developed at BEST.
IA to use Code Vulnerability Analysis tool to identify vulnerabilities for existing the custom code for
any future Custom developments in BEST ERP Systems.
IA to implement/use ERP for Data Slicing and Data encryption to build the ERP Clone Systems
required during the implementation and operation phase. IA to use Testing Tool for implementation
of new ERP Systems.
The IA shall map the requirements of BEST with the proposed solution, and identify the gaps for
customization, configuration and development. The Implementation Agency shall visit BEST office
locations to conduct a comprehensive requirement analysis of the system, infrastructure and training
needs in discussion with all the stakeholders (BEST or its representatives).
Activities conducted as part of this task will result in the project deliverable Site Survey Report, ERP
solution, Software Requirement Specifications (SRS) report, Bill of Material (BOM), Bill of Quantity
(BOQ) and Training Needs Analysis (TNA) report, which shall detail the requirements of the
complete solution and implementation requirements up to the last possible detail.
Timelines: IA shall complete the detailed requirement gathering/SRS activity within a month of
submission of the Survey report.
7.3 ERP Implementation as per Annexure IX, Data Migration and Procurement of
required Licenses
Implementation Agency needs to provide a detailed project plan for all the products mentioned as
per Annexure IX. IA also needs to develop strategies along with the roadmap which will be used for
BEST’s ERP journey as per the Products mentioned in Annexure IX.
The Implementation Agency shall adopt the best /standard practices along with the security
constraints for access and control rights in order to achieve the high level of stability and robustness
required for the application. The Implementation Agency shall follow proper assessment,
documentation, version control and other criteria to ensure long term continuity of this project. The
major deliverables to be submitted by the Implementation Agency are as follows:
1. Data Migration Plan for all the legacy applications
2. Report on Value Addition (Cost and Benefit Validation) to BEST by implementing products
mentioned in this RFP document
The IA shall submit an Inception Report for project implementation which will serve as a foundation
document for the overall project. The Inception Report shall include the overall project plan and the
plan for individual phases along with detailed tasks. The acceptance of the inception report by BEST
is essential for proceeding with the implementation of the project. The Implementation agency shall
plan the project implementation in great details and shall provide a micro level view of the tasks and
activities that they are going to be undertaken in consultation with the Core Committee that shall be
constituted by BEST to steer the project. The minimum list of planning related documentation that
the Implementation Agency shall make at the onset is as follows:
i. Project Schedule: A detailed week-wise timeline indicating various activities to be
performed along with completion dates and resources required for the same
ii. Manpower Deployment List: List and number of all manpower that will be required
along with the task assigned to each. Roles and Responsibilities of every category of
manpower shall be mentioned.
iii. Resource Deployment List: List and number of all other resources that will be required.
iv. Communication Plan: Detailed communication plan indicating what form of
communication will be utilized for what kinds of meeting along with recipients and
frequency.
v. Progress Monitoring Plan: Detailed Daily, Weekly, Monthly Progress Report formats
along with issue escalation format.
vi. Standard Operating Procedures: Detailed procedure for monitoring the ERP application
module wise performance parameters and implementation progress.
vii. Risk Mitigation Plan: List of all possible risks and methods to mitigate them. The
following format will be used for this purpose:
viii. Escalation Matrix and Incident Management: A detailed list of key contact persons
with contact details with escalation hierarchy for resolution of issues and problems. This
has to be via an Incident Management system.
a) Initial Phase -
The Implementation Agency shall submit an Inception Report for project implementation which will
serve as a foundation document for the overall project. The Inception Report shall include the overall
project plan and the plan for products mentioned along with detailed tasks.
The acceptance of the inception report by BEST is essential for proceeding with the implementation
of the project. In this phase, the project will start, plans would be finalized, project team will be
assigned, and work is under way to start the project optimally. The minimum list of planning related
documentation that the Implementation Agency shall make at the onset is as follows:
b) Explore Phase: In this Phase, Implementation Agency will perform a fit/gap analysis to validate the
solution functionality included in the project scope and to confirm that the BEST’s business
requirements can be satisfied and FRS will be prepared with all the detailed requirements of the
complete solution and implementation requirements up to the last possible detail. The indicative FRS
is listed in this document at Section 7.30.
The Implementation Agency shall map the FRS with the solution proposed and identify the gaps for
customization, configuration and development. It is expected that the bidder understands the
complete requirement before bid submission as it will have financial implications. The Key Activities/
Key Deliverables/Key Milestones would be as per the indicative list given below –
c) Realize Phase: The purpose of this phase is to use a series of iterations to incrementally build
and test an integrated business and system environment that is based on the BEST’s business
scenarios and process requirements identified in the previous phase. During this phase, data is
loaded, adoption activates occur, and operations are planned. Mock Data simulations (Dress
Rehearsal) are to be done by Implementation Agencyin this phase.
i. The Implementation Agency shall perform the detailed assessment of the functional
requirements for the services described in the RFP.
ii. Implementation Agency shall understand the processes and other related documents and
seek clarifications from the department, if any.
iii. It is expected that Implementation Agency will gather requirements through structured
questionnaires, focused interviews with user groups. It is also expected that Implementation
Agency will visit the different locations to understand the requirements of users at those
locations.
iv. SRS shall contain the objectives and scope of the system, overview, various levels of business
requirements, architectural requirements, usability requirements, reliability requirements,
design constraints, sizing considerations, applicable standards, interfaces etc. User Role wise
mapping to the various business functions with details regarding their access rights (insert
/update / delete / view etc.) shall also be included in the document.
v. The SRS shall be prepared by the implementation Agency/ Service Provider and a formal sign-
off shall be obtained from the department before proceeding with the Development/
Customization/Configuration/Installation of the application.
The indicative list of Key Activities / Deliverables / Key Milestones for Realize Phase are –
using authorizations
incremental □ Integration Validation
build in time- with 3rd Party
boxed
iterations
Testing Conduct overall □ Solution configuration Integration
end-to-end and tests testing of a
testing of the □ Development/testing of release
solution within enhancements and complete
the QA extensions like Data
environment interfaces, forms, Migration
Conduct workflows, conversions, testing
performance or reports conducted
testing □ User acceptance test User
acceptance
testing
completed
Technical
testing
completed
(including
performance
, load, high-
availability)
Training Conduct □ Technical Quality Project
BEST’s Assurance team and
project team □ Preparation/delivery key users
and key user of train-the-trainer trained
training course
Finalize end
user training
materials and
documentation
Security Prepare for □ Evaluation and Phase
data enhancement of quality
migration and security/controls assessment
data archiving □ Data migration conducted
conducted
d) Deploy Phase: The purpose of this phase is to setup the ERP production system, confirm BEST’s
organization readiness, and to switch business operations to the new system. Upon initiating Deploy
phase, the Implementation Agency has already confirmed (through integration testing in the Realize
phase) that all systems are functioning correctly and there are no remaining integration issues to
resolve. Thus the Implementation Agency’s team prepares for transition of productive business
operations in the new environment, switches on the new solution and conducts the solution adoption
and post go-live support activities.
The Implementation Agency shall prepare and submit the complete architecture of the proposed
application including the system architecture, solution architecture, hardware deployment architecture
and network architecture. The Implementation Agency shall also ensure that all possible and required
improvements have been incorporated in the solution architecture, as applicable; and also ensure that
the architecture would not restrict any scalability or enhancements in future. The Implementation
Agency shall be entirely responsible for the architecture of the system implemented to satisfy all
features, functions, security etc. as described in this document including system sizing. Detailed
Technical manual shall be submitted by the Implementation Agency. The indicative list of the Key
Activities/ Key Deliverables/Key Milestones for Deploy phase would be as follows -
Aspect (as applicable) Activities Major Deliverables Typical Milestones
and Key Decisions
Requirements Identify and □ Post production
Documentation document all support via “extra-
issues care” provided
encountered in
the transition
to the new
solution
Software Development Finalize the Organizational and □ Post production
solution and production support via “extra-
its supporting readiness check care” provided
tools and
processes for
production
go-live:
Resolve all
crucial open
issues
Integration with Check that Operational and □ Production
External Applications system live production environment fully set
management system up
is in place environment
Hosting Infrastructure Proceed with Organizational and □ Data conversion
cut-over production completed
activities, readiness check □ Go-live activities
including data Post Go-Live conducted
migration support provided,
including training
Testing Conduct Technical and □ Go/no-go decision
system tests system testing, as secured
necessary
Training Complete all Pre go-live user □ End user training
scheduled end training delivery completed
user training Post Go-Live
support provided,
including training
Manpower Deployment Establish a Setup operational □ Support organization
“extra-care” support established
center of organization
excellence for Help desk and
support that technical support
provides: operational
Production
support
processes
Exceptional
business
monitoring
processes
□ Extraordinary
technical
support
□ System
enhancements
□ Track and
report on
value delivery
External Integration – □ Execute BEST Organization
Email, SMS Gateway transition and readiness for
etc. cutover plans transition confirmed
including
organizational
change
management
(OCM) plans
Security □ Monitor Cutover to Go-live activities
business production conducted
process results including
and the □ Cutover plan
production update
environment □ Cutover
simulations
□ Data
migration
□ User IDs and
profiles created
e) Run Phase: The Run phase means that all the ERP Products mentioned as per Annexure IX have
been implemented at BEST and they are up and running. BEST’s new ERP systems should be
available and performing at the high levels and required to support business operations. During the
system implementation, the project team put in place an initial set of ERP operation standards. Now
in the Run phase, the live system is assessed by the Implementation Agency to identify opportunities
to further optimize the system by applying additional ERP standards. The indicative list of Key
Activities/ Key Deliverables/Key Milestones for Run phase would be as follows –
f) Documentation and Versioning: The Implementation Agency shall ensure that complete
documentation of the project is provided with the comprehensive user manuals, and adhere to
standard methodologies in software development as per ISO standard and/or CMM models. The
following documents are the minimum requirements -
i. System Requirement Specifications and Solution Design Document
ii. Traceability Matrix document
iii. Communication Plan listing all stakeholders in the project, defining their roles and
responsibilities
iv. All Architecture documents, Design documents, testing and deployment manuals, non-
functional requirements, etc.
v. Quality Assurance Plan stating the planned actions to ensure satisfactory delivery conforming to
functional and technical requirements of the project
vi. Test Plan containing information on the software test environment to be used for independent
testing, the test cases to be performed, and the overall testing schedule. This includes:
schedule, resources, tools, procedures, environment definition, test cases, and software test
results.
vii. Operations Manual providing instructions for installing the application, troubleshooting,
interpreting message logs, and FAQs (Frequently Asked Questions) to be uploaded
viii. User Manual (online and downloadable content) providing detailed instructions in the form of a
narrative on how to use the software to be uploaded
ix. A data dictionary listing out all the data elements shall be prepared
x. Minutes of Meeting, Agenda, Proceedings and tracking of decisions during the entire
implementation period.
xi. All the documents including, but not limited to the above shall be submitted to BEST for sign-
off.
Automated Provisioning/De-Provisioning
□ Automated user account provisioning for employees based on the information provided by the HR
system.
□ The solution should be able to handle user provisioning/ de-provisioning activities which include
sub-processes such as user creation, modification, transfer, termination and suspension.
□ User entitlements and access should be granted appropriately and in a timely manner.
□ Actions include revoking access in a timely manner when no longer required due to termination,
transfer or suspension.
□ Access Management would focus on a Role Based Access Control (RBAC) for access to
applications and support for Segregation of Duties conflict violations check for access within the
various applications.
7.5 User Acceptance Testing Criteria for all the ERP Applications
The Implementation Agency shall ensure that the application is thoroughly tested as per standard
process defined hereunder or as defined by BEST. The process of User Acceptance Testing shall
evolve over the contract period. The department requires thorough and well-managed test
methodology to be conducted. The Implementation Agency shall build up an overall plan for testing
and acceptance of system, in which specific methods and steps shall be clearly indicated and
approved by the department. The Implementation Agencies required to incorporate all suggestions /
feedback provided after the elaborate testing of the application, within a pre-defined, mutually
agreed timeline.
The Implementation Agency shall keep a track of the suggestions that deviate from the original
requirements before classifying them as change request/ enhancement. This classification shall be
done in separate meetings where all stakeholders will agree on the level of change and the revised
timeline to implement it. All fixes done to comply with the already specified requirements are
required to be done as per the specified timelines at no extra cost to BEST.
The Implementation Agency shall undertake the following activities:
1. Outline the methodology that will be used for testing the system
2. Define the various levels or types of testing that will be performed for system
3. Provide necessary checklist/documentation that will be required for testing the system
4. Describe any techniques, test cases/ scenarios / scripts that will be used for testing the
system
5. Describe how the testing methodology will conform to requirements of each of the
functionalities
6. Indicate/demonstrate to the department that all applications installed in the system have
been tested
7. The Implementation Agency shall provide a workflow for sign-off on test deliverables that is
mutually agreed upon by both the parties
The competent Authority from BEST may issue appropriate acceptance certificate to the
Implementation Agency for stabilization of all modules and successful operationalization of the
application.
The Implementation Agency shall conduct various type of testing on the new build/package before
releasing it for deployment on the production environment according to standard Software Testing
Life Cycle (STLC). The testing levels shall include: Unit Testing, Integration Testing, System Testing
and Acceptance Testing. These tests levels shall be included as: security testing, performance
testing, Usability testing, Concurrency testing, etc.
In view of the above, the different types of testing followed generally as a part of typical Software
Development Life Cycle have been mentioned below to understand the exact testing requirements
for this project –
□ Unit testing - Testing of individual software components or modules. Typically done by the
programmer and not by testers, as it requires detailed knowledge of the internal program design
and code.
□ Integration testing - Integration testing shall be amongst the modules to verify the
functionality of data sharing within the application. This shall include integration testing with
external applications to verify the combined functionality after integration.
□ Regression testing – After implementing a bug fix or new change request, the system shall be
tested again by the IA to check whether any new bug has been introduced or not. Here the
application shall be tested as a whole after each update or change in the software. The cost of
any automation tools used in this testing shall be borne by the Implementation Agency.
□ Acceptance testing - Normally this type of testing is done to verify if system meets the
customer specified requirements. The department will conduct this testing to determine whether
to accept application.
□ Usability testing – This is for the User-friendliness check. In this the following areas shall be
tested: Application flow, for a new user to understand the application easily, proper help
documented to guide whenever a user is stuck at any point, minimum keyboard entry and
maximum use of drop-downs/auto-prompt feature, etc. Basically system navigation shall be
checked in this testing.
□ Security testing – This test shall be conducted to check if the system can be penetrated by any
hacker. The Implementation Agency shall conduct security testing to check how well the system
protects itself against unauthorized internal or external access and to check if system database is
safe from external attacks.
□ Performance testing – This term often used interchangeably with ‘stress’ and ‘load’ testing to
check whether system meets performance requirements under different levels of loads and to
check the maximum load at which the system performance degrades. For this testing
Implementation Agency shall use different performance and load tools. If as a result of
performance testing, BEST determines that one or more system performance requirements have
not been satisfied, then each of these requirements will be recorded as a defect with a severity
classification of "High”. The cost incurred for the fixing of the Problem shall be borne solely by
the Bidder and such cost shall not be reimbursed by BEST.
□ Concurrency testing - Concurrency testing is also known as multi-user testing, performed to
identify the defects in an application when multiple users login to the application. It helps in
identifying and measuring the problems in system parameters such as response time, output,
locks/dead locks or any other issues associated with concurrency. The Implementation Agency
shall carry out proper testing as required to meet the stated performance criteria.
□ Defect Severity Classification - A brief description of the defect severity classification is given
below -
□ Critical - A failure of software evidenced by abnormal termination of programs or windows.
□ High - A failure of software evidenced by incorrect results with respect to critical data and for
which there is no 'work around'.
□ Medium - A failure of software evidenced by either incorrect result with respect to critical
data for which there is a 'work around', or incorrect presentation of information.
□ Low - A minor or cosmetic flaw in the software normally involving screen layouts, report
formats and error messages. Note: A 'work around' is defined as performing a system user
action or actions to achieve the same physical result i.e. the same database state, without
unduly hindering normal operations.
Problems raised by BEST during user acceptance testing will be classified as follows –
□ Problem within specifications. Such Problem shall be recorded on the defect log with the
appropriate severity status of Critical, High, Medium or Low. The cost incurred for the fixing
of the Problem shall be borne solely by the Bidder and such cost shall not be reimbursed by
BEST
□ Problem is outside specifications but is attributable to changes in software within
specifications. Problem will be recorded on the defect log with the appropriate severity status
of Critical, High, Medium or Low. The cost incurred for the fixing of the Problem shall be
borne solely by the Bidder and such cost shall not be reimbursed by BEST
□ Problems raised by BEST during user acceptance testing will be documented on a Non
Compliance Report (NCR) and communicated to the Bidder for analysis and solution. The
classification of the problem and the severity of the problem will be determined by BEST. The
Bidder will document their analysis of the problem and their proposed solution on the "NCR"
document.
The Implementation Agency shall submit a responsibility matrix highlighting the secondary
responsibilities. An indicative responsibility matrix is given below:
P: Primary Responsibility; S: Secondary Responsibility
Test User
Testing Responsibility Developer Tester
Manager Department
Test Planning
□ Test Strategy/Master Test Plan S P
Detailed Test Plans
□ Unit Test P
□ Integration Test S P S
□ System Test / Regression Test P S
□ Acceptance Test P S S
Test Preparation
□ Unit Test P S
□ Integration Test S P S
□ System Test / Regression Test P S
□ Acceptance Test S S P
Test Execution
□ Unit Test P
□ Integration Test S P S
□ System Test / Regression Test P S
□ Acceptance Test S S P
Results Reporting
□ Unit Test P
□ Integration Test S P
□ System Test / Regression Test S P
□ Acceptance Test S S P
Table: Responsibility Matrix for Testing
The Implementation Agency shall ensure that the test documentation includes test procedures, test
data and test results. The test cases once prepared by the Implementation Agency shall be sent to
the department for approval before the testing begins. The Implementation Agency shall also submit
Requirement Traceability Matrix (mapping of test cases to requirements) and test plan for approval
before testing. The Implementation Agency shall use a defect tracking tool (the cost for which (if
any) shall be borne by the IA itself) and submit a defect workflow that shall be followed for all
defects logged into that system.
Errors detected during testing shall be logged, classified, reviewed, and resolved prior to release of
the software. Software error data that is collected and analysed during a development/customization
life cycle may be used to determine the suitability of the software product for release and
installation. Test reports shall comply with the requirements of the corresponding test plans.
The Acceptance Tests shall demonstrate that the Implementation Agency has met each and every
requirement specified in the FRS and SRS documents and has delivered an effective operational
system.
a. User Acceptance Testing (UAT)
The department shall form different user groups for the purpose of UAT. These user groups would
test the application and the results of all the above mentioned tests submitted by the
Implementation Agency will be considered to ascertain the functionality of the application. Once the
defined acceptance criteria are completely met, Implementation Agency shall take a formal sign off
from the group for acceptance of each module. Based on the sign off and user feedback, department
would issue UAT certification to the Implementation Agency for that particular module/ sub-module.
The Implementation Agency shall submit the Test Strategy, Test Plan and test Metrics to BEST.
The Test Strategy document (prepared once for the project) shall include -
i. Objectives of testing and the activities that will serve to meet these objectives
ii. Contents of the tests (which characteristics are to be tested and which are not)
iii. Defining priority levels and severity levels
iv. Associated documents (such as the project plan, overall quality assurance strategy,
other project documents) being referenced
v. Resource staffing and allocation (hardware/software/personnel) for testing
vi. Test stages and cycles
vii. Selection of suitable testing methods
viii. Test management (defect reporting, defect management & triaging)
ix. Release environments and test tools used for testing.
The Test Plan document (prepared for every change/enhancement/patch) shall include –
i. Scope of testing within the context of the project
ii. Test systems and objects to be tested with priority levels
iii. Impact analysis in the system landscape – This shall include the identification of risks,
either positive or negative, analyze the risk, the probability of the risk occurrence and its
impact and the plan to control or mitigate the risk
iv. Criteria for interrupting and terminating testing, as well as acceptance criteria for each
test stage i.e. Entry / Exit Criteria
v. Testing roles and responsibilities
Testing Metrics
The following minimum metrics shall be captured and reported for the project on a periodic basis as
defined by BEST –
BEST believes that the key to successful implementation will be Implementation Agency’s ability to
train BEST’s staff in the operation of the proposed business solutions .The Implementation Agency
shall conduct training needs analysis of all the concerned staff and draw up a systematic training plan
in line with the overall project plan. The trainings shall be provided at BEST premises or any other
premises, as fixed by BEST. The training is expected to be hands-on and conducted at the training
by the BEST. It shall be the responsibility of the BEST to set-up training centers with associated
hardware and networking infrastructure.
The Implementation Agency shall submit a softcopy and hardcopy of the training material to the
department before commencing the training session. Training program shall be continuously
monitored by the department and Implementation Agency so as to ensure desired quality standards.
Implementation Agency shall also prepare a feedback mechanism (i.e. printed feedback forms) and
get it filled by the participating batch and submit the same on a regular basis to the department.
The Implementation Agency shall provide audio-video content based multimedia software as training
material. The Implementation Agency shall install and train the application users using the same. It
is the responsibility of the Implementation Agency to prepare documents including User manuals,
technical manuals, installation manual, administration manuals, training manuals and provide the
same to the department.
Tests for assessing the trainees after training shall be designed by the Implementation Agency and
approved by the department. Rating of the trainers shall be finalized by the department or its
nominee. On the basis of the training assessment and feedback provided by the participants, the
decision on final rating of the trainers shall be taken at the sole discretion of the BEST.
After each training, training completion certificate duly signed by the trainees, trainers, HOD of
department and Implementation Agency shall be recorded.
Please Note - All the module/sub module wise trainings provided by Implementation Agency are to
be uploaded in a central repository. Use of recommended training tools/ software(s) for providing
various training is essential. Adequate training material which includes training manuals, quick
reference cards etc. should be provided during the training sessions.
The objective of Capacity Building (CB) initiatives is to equip the direct users and other stakeholders
of Department with the right skills, and knowledge to optimally use the IT solution implemented.
The Training program would be split into series of sessions for different user groups and across
functional areas of the system. Training will be provided by Respective Domain Experts. Training to
be given to core Module Users before Go Live as mentioned in the plan, these core users can then
guide/train the other BEST people within the department.
The Implementation Agency shall be responsible for the following activities as part of the End User
and train the Trainer Training:
□ Develop overall training plan including formation of user groups and classifications
□ Develop Location-Wise Training Schedule, Curriculum, and Training Material for Department
Staff
□ Deliver training to end users including carrying out the training effectiveness evaluation
□ Identifying Department Champion for Train the Trainer Training
□ Implementation Agency to provide their indicative training plan before go live of any ERP
system
Please Note - BEST may at any time ask for one ad-hoc training per module per department in a
month with minimum 20 participants at no extra cost. All trainings should arranged/ managed by
project manager.
Sr.
Particulars Relevant Response
No
1. The supporting training materials were: Not really Useful to some Very helpful
helpful extent
2. Whether the training will help you in your Not useful To some To a large
regular office work? at all extent extent
3. Whether the training met your overall Not at all To some To a large
expectations? extent extent
Operational Acceptance shall be given to the Implementation Agency upon final acceptance of the
completion of implementation of all modules of the application. But if for reasons not attributable to
the Implementation Agency, the implementation schedule is affected, the department may take
decision on case-to-case basis.
The Operational Acceptance Tests shall be the primary responsibility of the department. However, it
should be conducted with the full cooperation of the Implementation Agency to ascertain whether
the System conforms to the scope of work, including, but not limited to, the functional requirements.
The department will verify whether the installed system is functioning according to the desired
objectives and outcomes. The operational acceptance of data centre and disaster recovery will also
be included.
If for reasons attributable to the department, the Operational Acceptance Test of the System cannot
be successfully completed within the period specified, from the date of receipt of stabilization
certificate or any other period agreed upon in writing by the department and the Implementation
Agency, the Implementation Agency shall be deemed to have fulfilled its obligations with respect to
the technical and functional aspects of the scope of work and SLAs pertaining to this category of
work will not apply.
After the Operational Acceptance has occurred, the Implementation Agency may give a notice to the
department requesting the issue of an Operational Acceptance Certificate. Within fourteen (14) days
after receipt of the Implementation Agency’s notice, the department shall -
1. Issue an Operational Acceptance Certificate; or
2. Notify the Implementation Agency in writing about any deficiencies or other reason for the
failure of the Operational Acceptance Tests.
Once deficiencies have been addressed, the Implementation Agency shall notify the department, and
the department with the full cooperation of the Implementation Agency, shall use all reasonable
endeavours to promptly carry out re-testing of the application. Upon the successful conclusion of the
Operational Acceptance Tests, the Implementation Agency shall notify the department of its request
for Operational Acceptance Certification; the department shall then issue to the Implementation
Agency the Operational Acceptance Certification, or shall notify the Implementation Agency of
further deficiencies, or other reasons for the failure of the Operational Acceptance Test. The
procedure set out in this clause shall be repeated, as necessary, until an Operational Acceptance
Certificate is issued.
If the failure to achieve Operational Acceptance within the specified time period is a result of the
failure of the department to fulfil its obligations under the Contract, then necessary decision will be
taken by appropriate higher authorities regarding the acceptance or conditions of acceptance.
Ite Service
Application Maintenance & Support services BEST
m Provider
I. Requirements Analysis
19. Set up and retain control of the use of DBMS system administration IDs
and privileges
20. Provide implementation planning for production database modifications
21. Implement database changes into the production environment
22. Perform access grants to database objects
23. Establish schedules and plans for performing production database
maintenance, modifications, enhancements and backups
III Data Communication Software and Middleware Software Support and
Operations
24. Install, upgrade and maintain the Middleware subsystem software
25. Manage the data communication subsystem and middleware subsystem
resource availability
26. Execute recovery procedures as required for middleware subsystem
resources
27. Monitor Middleware subsystem status
28. Develop procedures for planned and unplanned outages affecting the
middleware environment
The Implementation Agency shall be responsible for the Operation and maintenance (O&M) support
of the entire the application during the contract period. The Implementation Agency will provide
post implementation support.
a. The Implementation Agency must provide Post Implementation Support (including warranty)
till the end of contractual period as per implementation plan
b. The Implementation Agency should provide 60 months onsite support for ERP System at
BEST and after 60 months of onsite support, it will be the responsibility of the
Implementation Agency to hand over the entire ERP system to BEST
c. During the O&M phase, the Implementation Agency shall:
i. Ensure that all necessary measures are taken for the smooth operation of the application
ii. Ensure that all necessary know-how is transferred to the department support team in an
effective manner to facilitate a smooth transition. The transition plan will need to be
agreed between the Implementation Agency and the department
iii. Ensure adherence to baseline performance Service Level Agreement (SLA) matrix as
defined in this RFP.
Implementation Agency should propose and provide the following services for new implemented ERP
systems at BEST:
□ Implement issue/ticket tracking methodology and the tool to be developed for measuring the
SLA parameter during the contract period.
□ Propose governance model to engage the stakeholders effectively.
□ Any other value addition that can be provided as support partner.
□ Business process study methodology for each department for any development / modification
or change request.
The Implementation Agency will create an environment that, in and of itself, fosters the creation of
recommendations that will have a positive impact on BEST Services. The Implementation Agency will
make recommendations to improve productivity, Service Levels and Key Performance Indicators,
achieve savings, and reduce complexities in processes.
Software Maintenance / Development / Programming Team: The team should provide ERP
modules Implementation /maintenance / customization /configuration / up gradation. All the Assets
required by this team should be provided by Implementation Agency at no extra cost to BEST.
The Implementation Agency will be required to perform the following Application Maintenance
activities -
□ Bug fixing
□ Updating application for patches released by responsible for technology stack
□ Version up gradation as deemed necessary by BEST and as per industry Best Practices
□ Application log purging;
□ Application log analysis;
□ Application performance monitoring using and performance tuning;
□ Application data analysis and migrations between environments;
□ Application configuration changes in all environments; and
□ Application security and access related activities
Please Note - In addition to above listed all the activities, the Implementation Agency need to
perform all the ERP related activities assigned by BEST authorities.
Application Maintenance and Support will be delivered by a pre-determined resource pool (otherwise
referred to as “baseline” maintenance staff) to be provided by the Implementation Agency.
Service Level Agreements and KPIs (Refer in draft Agreements) defines the following services
Implementation Agency are expected to provide. Applications Maintenance and Support will be limited
to the in-scope applications. This service includes:
□ ERP System and Cloud database maintenance for all the products mentioned in the RFP
□ Enhancements and integration support
□ Cloud Support
□ Disaster Recovery/ Cloud support
□ Configuration Management for development and test environment
□ Documentation
□ Management and reporting
□ One-time responsibilities for application/modules hand-over
The list of in-scope applications/modules/functionality may be amended, from time to time, over the
duration of the contract, at the BEST’s discretion. All Enhancements workload will be managed from
within the resources of the baseline maintenance staff, based on BEST specified priorities without
any extra financial implications. However, the BEST may at its discretion request the Implementation
Agency to either adjust the size of its baseline maintenance staff group, or acquire additional
resources to accommodate specific enhancement requests.
During the Operations & Maintenance period manpower is required for supporting the entire project.
The manpower required is mainly categorized into below types -
1. Application maintenance and support services: Apart from the profiles being evaluated in the
technical evaluation stage, the additional profiles required are given below -
Minimum
Manpower
Sr. No. Qualification/Certificatio Experience of Manpower
Category
n
Minimum
Manpower
Sr. No. Qualification/Certificatio Experience of Manpower
Category
n
Database Education: B.E./B.Tech. Total Relevant Experience: 3 -6
1. Administrator Computer Science years
Relevant Certifications required
Programme Education: B.E./B.Tech. Total Relevant Experience: 3 -6
Consultant Should have knowledge of Years
2.
coding languages i.e. ABAP, Experience in relevant coding
DotNet, Java etc. domain of 3-6 years
Elect. Billing Education: B.E./B.Tech. Total Relevant Experience: 3-6 Years
and Meter
3.
Reading
Consultant
Consumer Education: B.E./B.Tech. Total Relevant Experience: 3-6 Years
Relationship /
4.
Engagement
Consultant
Portal Education: B.E./B.Tech. Total Relevant Experience: 3 -6
Management Years
5.
Consultant (For Enterprise Portal/ Net weaver
Portal)
Business Education: B.E./B.Tech. Total Relevant Experience: 3 -6
Intelligence/ Years
Business
6.
Objects
Consultant
(Secondary)
Open Text Education: B.E./B.Tech. Total Relevant Experience: 3 -6
7. Archival Years
Consultant
Asset Education: B.E./B.Tech. Total Relevant Experience: 3 -6
8. Management Years
consultant
Meter Data Education: B.E./B.Tech. Total Relevant Experience: 3 -6
9. Management Years
Consultant
Access Control Education: B.E./B.Tech. Total Relevant Experience: 3 -6
10. Consultant Years
Java Education: B.E./B.Tech. Total Relevant Experience: 3 -6
11.
Consultant Years
Testing Education: B.E./B.Tech. Total Relevant Experience: 3 -6
12.
Consultant Years
The Project Manager shall also be responsible for problem management, continuous system
improvement, version control and version validation, risk management, etc.
The IA shall plan the deployment of resources according to the implementation plan and not all
resources will be required from day one. Any extra manpower required beyond the manpower
planning shall be procured by the department on actual. Please check Annexure X for BEST
Locations.
During the course of the contract, if it becomes necessary to replace any of the Key Personnel, the
Implementation Agency shall forthwith with due approval from the department, provide as a
replacement, a person of qualifications and experience matching the requirements stated in the bid
need to be deployed. Failure to replace personnel with the required qualifications shall result in a
penalty as per the SLA defined in the contract.
The application maintenance and monitoring during the O & M period for ERP System includes -
a. Compliance to the Functional and Technical Requirements
b. Compliance to SLA
c. Application Software Maintenance, Problem identification and Resolution
d. Software Change and Version Control as per ERP industry standards
As part of Post-Implementation services, the Implementation Agency shall undertake the following -
a. Updated system design documents, specifications etc.
b. Latest source code, application deployment files, configuration files for entire solution
c. Updated user manuals, administration manuals, training manuals etc.
The average application response time(s), application availability and other performance parameters
are given in the SLAs. The application software shall be designed to cater to the required load
without any degradation of performance as explained below -
a. The database schema and design shall be capable of handling current and future loads
without any degradation of performance.
b. System shall be upwardly scalable in the event of increased usage of the system or new
business requirements.
c. The Implementation Agency shall provide comprehensive report every month on the
performance of the application and infrastructure.
d. The department may initiate, with prior notice, the audit of such measurements to their
satisfaction.
The application maintenance shall include, but not be limited to the following: -
a. Performance Bottleneck Checks
The Implementation Agency shall monitor and check the system regularly for performance
bottlenecks, and resolve the issues, if SLAs are not being met, with the dedicated component(s)
without impacting the overall system at no extra cost.
b. Periodic Retention Policy
The Retention Policy will be defined by the department.
c. Security
The Implementation Agency shall take rigorous provisions to prevent unauthorized alteration or
damage to the application and all related ERP applications and databases. Implementation Agency
shall provide basic level of security by providing the end users with username and password to
access the applications. Implementation Agency shall deploy the application only after it has
undergone User Acceptance Testing (UAT) and is security audited for Vulnerability Assessment (VA)
and Penetration Testing (PT). The UAT shall also include assessment and evaluation of all application
SLA’s. However, Implementation Agency shall undertake and conduct all sorts of testing and follow a
standard Software Testing Life Cycle approach (STLC) before deployment of application in a
Production Environment in addition to assessment and certification through BEST.
d. Backup Policy
The Implementation Agency shall design and successfully test backup and recovery capabilities for
the application. The Implementation Agency shall finalise the functionality and the frequency of
backup in consultation with the department and should be documented and signed off.
Any required version/software /hardware upgrades, patch management, etc. shall be the
responsibility of the Implementation Agency for the entire contract period at no extra cost to BEST
for all the systems at BEST including Application ,Db and OS. The required upgrades for the entire
stack has to be implemented within six months of release/general availability including –
i. Supply, installation and maintenance of the updated/upgraded versions of software
ii. Rectification of bugs/ defects if any
iii. Fine tuning of the application, as and when required
iv. Maintenance of the application
v. Re-installation of software/application/database whenever required
f. Environment Management
Implementation Agency will be responsible for maintaining various environments as per the best
SDLC practices in the industry for all the products mentioned.
g. Staging Environment:
Implementation Agency will be responsible for maintaining the staging environment which will be the
exact replica of a production environment for software testing. This environment will be used to test
codes, builds, and updates to ensure quality under a production-like environment before application
deployment.
h. Monitoring Tool: The Implementation Agency shall ensure the deployment of management
and monitoring tools for Application Performance Monitoring, version control (software as well as
document) and bug tracking. The Implementation Agency shall use a proper project management
tool for monitoring the implementation of project. The Implementation Agency shall provide access
of the tool to the high level officials of the department. All necessary training regarding the use of
the tool should be provided by the Implementation Agency.
Installs and configures ERP software and other related products mentioned in
the RFP and upgrades /patches , application Installation ,application
monitoring, Installation of patches and security updates Monitoring
application services for
Manages ERP Login Credentials i.e. User administration (setup and
maintaining account, Setup security policies for users) Handles incidents
Manages and support various environments involved for ERP Administration
Should administer all the servers of ERP systems as mentioned
Evaluates, tests and Updates system as soon as new version of OS and/or
application software is released (after obtaining a formal approval from BEST)
Assists in developing, implementing, testing and maintaining backup and
disaster recovery policies and procedures
Server Management (Sizing of server infrastructure), Assist in backups and
recoveries regularly and as and when required, Web dispatcher operation,
Load Balancer Operation, Certificate Handling, system Performance
Management.
Provides suggestions and implements software-related measures for
maximizing uptime and Supports development team whenever required
Output Management ( create, change ,delete Printers in ERP systems ,Re-
organize Spool Request, Check spooler table consistency to prevent printing
issues, Lock/Unlock Printer, Troubleshooting technical spool- and print-
problems (within the ERP system)
Monitors system performance to ensure high availability of the system
Ensures ERP application / user security and authorization management,
change correction management / Transport management system, etc.
Ensure Batch Job Monitoring, Interface Administration, client Operations
(client copy, client Export ,Import)
4 Developer Analyses Functional Specifications and get clarifications from Business
s owners/functional consultants
Consultant Creates technical specifications, Technical Design Document & code review
s checklist
Develops Custom reports (Classical, Interactive)
Develops Online Interfaces and BDC programs
Fine-tunes and modifies of the custom programs / Custom Code Migration for
SAP, Code Push, Creation of CDS View etc.
Performs Pre-Delivery Reviews and Final Testing
Develops ALE/IDoc Interfaces and Maintaining ALE Configuration in All the
systems
Prepares Unit Test Plans, coordinating with middleware and Legacy
developers during process chain testing
Supports Unit Testing & Business Acceptance testing
5 Functional The staff sitting at central place and carrying out development, change
Consultant request, bug fixing and all types of up gradation, providing backend support
(Secondar etc. to BEST users as and when required.
y) Understand and study the current business processes along with designing
current business workflows
It will be the responsibility of the Implementation Agency to enhance and modify the existing ERP
implementation based on the needs of the user department. The Implementation Agency shall
address all the Change Requests in the functionality offered by the solution (vis-à-vis the FRS) at no
additional cost during the operations & maintenance phase.
Sr. Services
No.
1 Change Request due to changes in business process (Performing end to end processes to
support change request which include requirement gathering, requirement documentation,
design development, configuration, testing, facilitating user acceptance testing, training and
deployment)
2 Change Request for enhancement in ERP application (Performing end to end processes to
support change request which include requirement gathering, requirements documentation
, design, development, configuration, testing, facilitating user acceptance testing, training
and deployment
3 Preparing and updating various versions of Business Blue Prints for all modules of
SAP implemented or to be implemented at BEST.
4 Preparing and updating various versions of User Manuals for all modules of ERP
implemented
or to be implemented at BEST.
5 Preparing and updating various versions of Training Manuals for all modules of ERP
implemented or to be implemented at BEST.
6 Preparing and updating of versions System Installation / configuration Manuals of all
modules of ERP system including System Landscape etc. implemented / to be implemented
at BEST.
7 Creating integration touch points with various BEST or external applications as required by
BEST.
8 Any other customization / documentation services not listed above but required for smooth
functioning of implemented module of ERP system directed by BEST.
The Change Request Management handles all the change requests, urgent or not, received from
various sources inside and outside the Application Maintenance Services process.
The submitted Change Requests shall be validated and logged, and then they will be assessed and
submitted for approval to the BEST Change Control Board in a specified template. The Change
Control Board will determine the criticality of change request and the timeline for its implementation,
which the Service Provider need to follow. The SLAs will be determined based on the compliance of
implementation of change request.
Bug Management is an important activity and based on the severity level, it becomes highly critical.
As the parties involved are Users/ functional team members of Department and Service Provider,
SLAs may not be directly defined. Service Provider commits involvement in resolution on ‘best of
efforts’ basis as per requirements. Following are the steps involved -
□ Problem definition
□ Context definition (through functional teams as per requirements)
□ Request Analysis by Service Provider
□ Priority Categorization
□ Logging with concerned team and tracking to resolution
Implementation Agency shall address all the errors/bugs/gaps in the functionality offered by the
solution (vis-à-vis the FRS) at no additional cost during the operations & maintenance.
Implementation Agency shall identify and resolve application problems like system malfunctions,
performance problems, data corruption etc. due to which the solution is not able to give the
desired performance
Implementation Agency shall be responsible for the following -
□ Updating all available patch/ updates to the solution
□ Providing handholding support to end users
□ Ensuring proactive and timely support in identification and provision of solutions including
Support for resolution
□ Timely logging of Bugs/Problems
□ Perform Defect fixes for the existing functionalities
□ Major/ Minor enhancements against the delivered solutions
□ Incorporate new requirement against the implemented solutions
Maintain Documentation for the following -
□ Functional and technical specification
□ Configuration document update
□ Test document
□ Business Blue Print
□ User Manual
□ Code Review Checklist
Change Control Notice (‘CCN’): Change Request can be raised by any BEST application user/
stakeholder who shall be responsible for obtaining approval for the change and shall complete the
CCN Initiation part of the form.
Change Control Note (Sample): The Implementation Agency shall assess the CCN and complete
the CCN, on completing the CCN the IA shall provide as a minimum -
a. Description of the change
b. List of deliverables required for implementing the change
c. Time table for implementation
d. Estimate of any proposed change
e. Relevant acceptance criteria
f. Assessment of the value of the proposed change
g. Material evidence to prove that the proposed change is not already covered within the
Agreement and the scope of work
Prior to submission of the completed CCN to the BEST, or its nominated agencies, the
Implementation Agency shall undertake its own internal review of the proposal and obtain all
necessary internal approvals. As a part of this internal review process, the Implementation Agency
shall consider the materiality of the proposed change in the context of the SLA and the Project
Implementation affected by the change and the total effect that may arise from implementation of
the change.
The Implementation Agency shall be obliged to implement any proposed changes once approval in
accordance with above provisions has been given, with effect from the date agreed for
implementation and within an agreed timeframe. Implementation Agency shall not be obligated to
work on a change until the parties agree in writing upon its scope, price and/or schedule impact. A
sample change control note is given under Annexure XIV.
The Implementation Agency will be required to create and maintain formal project schedules (Gantt
charts) for all Change Request Development projects with a forward looking forecast of future
projects and associated resource requirements.
The Implementation Agency will be required to coordinate and identify potential future resource
constraints based on the future looking project schedule.
The Implementation Agency will be required to provide formal project management oversight of the
Service Provider’s Change Request Development team and ensure that they deliver as per the
defined project schedules.
The Implementation Agency will work as per the responsibilities outlined in Annexure XV, for project
management activities for the Change Request Development Services.
The Implementation Agency will be required to report on all Change Request Development activities
using templates that will be mutually agreed to by the BEST and Implementation Agency.
The Implementation Agency will work as per the responsibilities outlined in Responsibility Matrix, for
reporting activities for the Change Request Development Services.
It will be responsibility of the Implementation Agency to ensure and put in place a process for
ensuring that each ticket is logged by the users themselves and with adequate self-explanatory
information on type of support/issue. Similarly at each stage of resolution the ticket should be
updated with the resolution/resolution procedure/status in self-explanatory language.
Please Note - It is mandatory for the Implementation Agency to use an appropriate tool for
ticketing system.
Regarding sitting facilities - BEST will provide the premise and will pay electricity charges for that
premise. IA has to set up his own working environment at that premise.
Regarding Training facilities - BEST will provide the training centers in the BEST's premises.
Resources working for BEST's project should follow BEST's working / holiday calender.
The IA shall ensure monitoring, operation and maintenance services of the centralized solution
during the contract period. O & M of the Infrastructure will include -
a. IT Infrastructure Operations and Maintenance (including but not limited to Hardware, System
Software, Application Software and other Infrastructure till the end of the contract period.
b. Customize and implement a proper SLA monitoring tool in consultation with the department
Authorities during O&M Phase
c. Provisioning of Application Software, Hardware etc. for integration of any intervention with
application during Operation and Maintenance Phase
With respect to the hosting of the application, the Implementation Agency shall ensure the following
either directly or through the third party -
a. System Administration, Maintenance and Management Services
b. Network Management Services
c. Storage Administration and Management Services
d. Backup and Restoration Services
e. IT Security Administration Services as per ISO 27001 and ISO 20000 compliance
The Implementation Agency shall ensure that the required contract with the third party for hosting
the application shall cover the required warranty and AMC services. The Implementation Agency
shall ensure that the required contract with the third party for hosting the application shall cover the
required warranty and AMC services.
Implementation Agency must maintain the infrastructure at DC and DR site on a day-to-day basis. If
any system has to be upgraded at DC and DR end, that shall be done by the Implementation
Agency. The Implementation Agency shall send the reports of the components listed below -
a. Monitoring of replication status
b. Lag in replication due to any unforeseen errors
c. Network monitoring
d. Security monitoring and analysis
e. Reporting if any issue is arising in replication
f. Daily backup at DC and DR
The Implementation Agency shall ensure that the required contract with the third party for hosting
the application shall cover the required Warranty and AMC services. As part of the warranty services
the IA shall provide -
1. A comprehensive warranty support and on-site free service warranty for the entire contract
period from the date of Operational Acceptance.
2. Implementation Agency shall provide the comprehensive manufacturer’s warranty in respect
of proper design, quality and workmanship of all hardware, equipment, accessories etc.
covered in the scope. Implementation Agency shall warrant all hardware, equipment,
accessories, spare parts and software etc. procured and implemented against any
manufacturing defects during the warranty period.
3. Implementation Agency shall provide the performance warranty in respect of performance of
the installed hardware and software to meet the performance requirements and service
levels.
4. Implementation Agency shall upgrade Application Software/ any licensed software / Database
to latest versions of system software for application and database servers as required.
5. Implementation Agency is responsible for sizing and procuring the necessary hardware and
software licenses as per the performance requirements. Bill of Material and Bill of Quantity of
the Data Centre and Disaster Recovery shall be done by the Implementation Agency. The
warranty of those shall be ensured by Implementation Agency. During the warranty period
Implementation Agency shall replace or augment or procure higher-level new equipment or
additional licenses at no additional cost to the department in case the procured hardware or
software is not adequate to meet the service levels.
6. Implementation Agency shall monitor warranties to check adherence to preventive and repair
maintenance terms and conditions of all equipment’s, devices and components.
The IPR of the source code of the customized version of the COTS product and/or the bespoke
application shall lie with BEST. In case any subsystem is completely developed, the rights of the
source code shall be with BEST. The source code needs to be transferred within three months of
successful Operational Acceptance. All the costs associated with the transfer of source code shall be
borne by the Implementation Agency. The following protocol shall be followed for the transfer of
source code to the client -
a. The Implementation Agency shall submit detailed documentation for each module of the
application to the department. This includes all the modules deployed. The list of the
documents to be submitted are as follows:
i. Functional Specification Document
ii. Technical Specification Document
iii. Software architecture Documentation
iv. User Manuals
v. Training Manuals
vi. Test Plan , Test Cases and Results
vii. Release Notes
viii. User Guide to install, configure and use the module
All the documents shall be updated as per the last release of that module. The documents shall be
reviewed by the department or agency appointed by the department. Implementation Agency shall
ensure that any disparity / lacunae found in the documents are rectified and revised documents are
submitted for further review. The transfer of documentation to be considered as complete after the
department issues the completion certificate for the task.
b. Transfer of all the code files, supporting libraries, database scripts, libraries and metadata
dictionary, procedures and supporting software components. Source Code to be exact replica
of the department application live on the production server.
c. Documentation of step-by-step procedure for recompilation of the application shall be
submitted by Implementation Agency. The documentation shall enable BEST (or any third
party appointed by BEST) to install, configure and recompile the application.
d. While submitting the Source Code files, Implementation Agency shall submit the declaration
that the Source code is of the same version which is on Production Environment and used for
live operations. Implementation Agency shall provide the environment to recompile the
source code and provide access to the application to confirm that the Source Code is of the
latest version and is same as that on the Production Environment.
e. Implementation Agency shall conduct the necessary Knowledge transfer sessions to the
technical staff provided by the BEST. The success criterion of training will be that IT team
provided by BEST is able to recompile successfully the entire application on the test server
independently.
f. The transfer of source code shall be an on-going exercise. As and when, a new version of the
application is deployed in production; the source code of the changed modules shall be
transferred as per the above protocol to the department. At the end of contract period or at
the end of the complete development and deployment of all the change requests provided by
the department within the contract period or whichever is later, the entire source code shall
be transferred in the same way.
g. The department may conduct the (a) Software architecture and code review and (b) Security
Audit of the application; and necessary compliances are carried out before handing over the
source code during exit management. Timelines for this compliance shall be jointly decided
between the department and Implementation Agency.
h. All plans, specifications, reports, customized software, other documents, patent and data
generated shall be absolute property of BEST. The Successful Bidder(s) shall not use, share
this information, any other data derived from this application, customized software etc.
anywhere, without taking permission, in writing, from the BEST and the BEST reserves right
to grant or deny any such request.
The implementation of the proposed project is a complex process requiring provisioning of hardware
and software, networking, change management and capacity building. It is therefore necessary that
a dedicated project monitoring team is deployed for implementation of the project in a time bound
and outcome- oriented manner. The dedicated Project Monitoring Team will have resources of
required skills to lend directions to and monitor the progress of the project. Such a team is expected
to include technology and integration champions, change management drivers, legal advisors. The
dedicated team shall be responsible for overall project management including review of the system
requirement specifications, system design, project implementation monitoring, change request
monitoring, facilitation of site survey, etc. The team shall also be responsible for support in defining
and finalizing the requirements, support for coordinating training activities, etc.
The Overall Roles and Responsibilities of the Dedicated Project Team would be -
a. To ensure the project meets implementation timelines and budget covering all facets of
implementation including but not limited to -
i. Policies and Strategies for Capacity Building and Change Management
ii. User Acceptance testing of the software application
iii. Formulation of Backup and Disaster Recovery and retention Policy
b. Project Management
i. Contract Management
ii. Project Metrics
iii. Ensure milestone based project tracking
iv. Enforcement of SLAs
v. Periodic Audits and Quality reviews
c. Advice on strategies to help and develop an effective IT workforce through planning, training
and managing in order to meet the current and future requirements of the Healthcare
facilities.
d. Sign off and acceptance of critical project milestones, identifying implementation challenges,
dependencies and integration points.
e. Facilitate rollout of new/upgraded solution. Formulate advice and review exit management
strategies and hand-over arrangements. Bidder shall provide knowledge transfer / handover
after the completion of the contract period and on successful delivery of services and formally
close the project. This process will be initiated 3 months before the ending of the project
contract. In order to align both the parties on transition modalities, Agency will submit an Exit
Management Plan before 6 months of the ending date of the contract. Exit Management Plan
will include following but limited to -
a. Details of inventory of all the assets, IT Infrastructure, source code its
location, condition, licenses, documents, manuals, etc. created under the
Project.
b. Roles and responsibilities of both the parties for regular activities and
support system implemented during project operations.
BEST will approve exit plan after necessary consultation and start preparation for transition.
Selected Implementation Agency should host the ERP solutions on MeitY empanelled cloud and the
system would be accessed over the Internet/ intranet. Post go live of Hosting of ERP Systems by
Implementation Agency and Cloud service Provider the necessary ERP systems will be accessed by
BEST users and Citizens hence appropriate bandwidth provisioning need to be done by Bidder/CSP
for smooth functioning and access of all ERP system.
The IA and CSP together needs to make necessary provision for bandwidth scalability depending on
the user load. Apart from the Production Environment, IA shall maintain the Development,
Testing/QA, Training and Staging Environments as well in the same third party location. The software
application shall be developed / customized in a suitable environment as per agreement with the
department.
The Implementation Agency shall justify the choice of development environment. The application
shall be developed/customized and hosted as per ERP standard with commercially available tools.
The Implementation Agency shall list all tools to be used to develop, customize and maintain the
application, as well as the hosting platform, hardware and software. The Implementation Agency
shall be responsible for providing the Backup, Business Continuity Plan, Disaster recovery for the
application and Disaster Recovery Operational Plan.
Cloud Service Provider to bear the cost of tools, band width required for Data migration from Existing
BEST systems to new ERP systems and also for the entire contractual period at no extra cost to
BEST. They should also consider Database growth and scalability of the ERP system in terms of
compute, infrastructure Sizing (Hardware, network, bandwidth, firewall, webserver, application
server, database server, IOPs, CPU, Memory, Storage) while submitting the commercial bid. Please
check the Annexure XII Current Data Sizing of BEST Systems.
The CSP should provide VPN access required for administration of all the ERP systems at BEST at no
extra cost to BEST. The Implementation Agency and CSP should provide at least 50 VPN Access for
administration purpose of the servers hosted at CSP location.
The CSP should implement EMS Tools required for various reports like Average Response Time
during peak usage hours, application uptime, Database performance etc.at no extra cost to BEST.
The Implementation Agency should prepare and submit a detailed plan during execution of order
with following details: Mapping of detailed hardware at primary site and DR site should be prepared
with detailed analysis including following parameters -
□ Cloud Solution requirements
□ VM Server Provisioning requirements
□ Storage Requirements
□ Network interfaces requirement
□ Network throughput requirement
□ Backup requirement
□ Detailed planning of hardware deployment and configuration should be submitted to BEST.
The configuration planning should include following details.
□ Network architecture planning including
a. VLAN configuration planning
b. IP address planning
c. Subnet planning and routing planning
□ Firewall configuration planning
□ Backup methodology
□ Failover mechanism for replication links
On acceptance of the Implementation Plan by BEST, the Implementation Agency shall implement the
cloud solution and offer for testing.
Roles and Responsibilities of Cloud Service Provider (CSP)
The Implementation Agency will be responsible for providing a tier 3 or above Cloud site within
India, where BEST applications will be hosted. Following are the requirements w.r.t. Cloud Hosting -
□ The Cloud site must be within India.
□ Cloud Service Provider to provide best Hardware sizing for selected ERP solution along
with the other products mentioned in this document.
□ The DR (Disaster Recovery) site of the Cloud must be in India must be offered as part of
the cloud solution to BEST.
□ The service provider shall develop, prepare and provide a Cloud Solution Implementation
Plan. The Implementation Plan shall have the detailed design, specifications, drawings
and schedule along with inspection and test plan, risk matrix and risk mitigation strategy,
training material and documentation for all deliverables
□ The service provider shall provision the cloud infrastructure, as and when ordered by
BEST, as per scope of work defined in subsequent sections.
□ Responsible for the replication of data between the proposed Cloud Solution site and own
DR Site. The service provider will be responsible for commissioning the bandwidth, as
required by BEST, for replication of data and the SLA for the replication of data will be
attributed to the service provider.
□ The Cloud Service Provider shall offer DR as a service for all resources offered on main
(primary) cloud site.
□ The solution is envisaged for application level recovery scalable to site level recovery
based on the impact of the disaster.
□ Network setup (including switches, routers and firewalls) and uninterrupted network
availability through a network link dedicated for connecting between the main DC site, DR
site and Cloud site.
□ Necessary support in bringing the machines to login level in case of disaster / DR drills.
□ Network setup (including switches, routers and firewalls) and uninterrupted network
availability through a network link dedicated for connecting between the main DC site, DR
site and Cloud site.
□ Shared storage sizing for Cloud Hosting requirements.
□ Provisioning, configuring and managing FC-IP router for DC to DR replication in case the
proposed solution requires FC-IP router.
□ Support during the recovery operations of data from DR site.
□ Ensuring related DNS changes for internet, application availability and integrity, and
database synchronization with application at DR site.
□ 24x7x365 support for Hardware restoration (from self and OEMs used), managed hosting
support (including L1, L2, and L3 support), Uptime commitment up to OS levels, managed
& monitored backup and backup retention (as per period required by BEST), OS
provisioning & management, dedicated security services operations, etc.
□ Monitoring and maintenance reports over a monthly basis and as and when required.
□ Availability of server logs/ records for audits.
□ Access to monitoring tools for measuring the service levels, application performance,
server performance, storage performance and network performance.
□ Support in audit of the entire system on an yearly basis.
□ Review and suggest modification in Disaster recovery plans and guidelines for BEST
providing details of -
□ The key persons to be contacted during the disaster
□ The various activities to be done by vendor and BEST for complete operations from
DR site and restoration of operations to main production (cloud) site.
□ On expiration / termination of the contract, handover of complete data in the desired
format to BEST which can be easily accessible and retrievable.
□ Compliance process to the defined international standards and security guidelines such as
ISO 27001, ISO 20000, ITIL etc., for maintaining operations of cloud and ensuring privacy
of BEST data. For the same an audit will have to be conducted on a periodic basis as per
the requirements in this RFP document.
□ The Cloud infrastructure and BEST data must be maintained ONLY at the location of the
identified Cloud Hosting site. Data can only be moved to other site in case of any
emergency with prior approval of BEST concerned authority.
□ Scaling the server and storage infrastructure up or down based on the needs of BEST.
□ In case of reverse replication, since the DR site would be acting as main site, all the
necessary support to run the environment has to be provided by the Cloud service
Provider.
□ Reverse Replication is necessary and envisaged when the DR site is acting as the main
site. The solution should ensure consistency of data in reverse replication till the
operations are not being established at the Cloud site. The RPO would be applicable in
reverse replication also. The entire data should be made available for restoration at
Primary Data Centre. Restoration at Primary Data Centre will be the prime responsibility
of IA (Application and Cloud Service Provider).
□ It will be the Cloud Service Provider's responsibility to ensure that back up data is in a
format that is restorable at Cloud Site or DR Site.
□ Detailed RACI matrix for the same is to be provided by Bidder/CSP.
The CSP should be empanelled member of MeitY / DIT for the cloud service provisioning.
The CSP should comply with following as per MeitY CSP Guidelines/ Contractual Terms.
Information Security: One of the most critical issues that need to be addressed is the security of
data. This issue further poses a significant risk if the data is sensitive in nature.
a) Certification/Compliance:
□ ISO 27001 - Data Center and the cloud services should be certified for the latest version of
the standards.
□ ISO/IEC 27017:2015-Code of practice for information security controls based on ISO/IEC
27002 for cloud services and Information technology.
□ ISO 27018 - Code of practice for protection of personally identifiable information (PII) in
public clouds.
The following privacy and security safeguards should be ensured by the CSP
□ Avoid Security Hazards with the Cloud
□ No Disclosure about the information
c) Location of Data (text, audio, video, or image files, and software (including machine images),
that are provided to the CSP for processing, storage or hosting by the CSP services in connection
with the Department's account and any computational results that a Department or any end user
derives from the foregoing through their use of the CSP’s services) shall be as per the terms and
conditions of the Empanelment of the Cloud Service Provider.
Managed Services Requirements: The below are managed services requirements that CSP
should provide to BEST.
Backup Services
1. The CSP should configure, schedule and manage backups of all the data including but not limited
to files, folders, images, system state, databases and Enterprise applications as per the policy
defined by MeitY or the BEST.
2. The CSP shall be responsible for file system and database backup and restore services. As part of
the responsibilities, the CSP should -
a. Perform and store data and file backups (process of duplicating the customers “to-be-backed-
up” “Target Data”) consisting of an initial full back up with daily incremental backups for files;
b. For the files, perform weekly backups;
c. For the databases, perform a twice weekly full database backup, with a three times daily
backup of database log files;
d. Cloud platform should provide Encryption of all backup files and data and management of
encryption keys as a service that can be enabled for BEST that require such a service.
e. Monitor and manage backup activity;
f. Restore the requested data with the objective to initiate a minimum of 95 percent of the total
number of restore requests per calendar month within a two hour timeframe for data that can
be restored from a local copy;
g. Retain inactive versions of backed up flat files for 30 days and the last version of a deleted file
for 60 days;
h. Retain database backups for thirty (30) days;
i. Perform administration, tuning, optimization, planning, maintenance, and operations
management for backup and restore;
j. Provide and install additional infrastructure capacity for backup and restore, as required and;
k. Perform backup on the next scheduled backup window in case of any scheduling conflicts
between backup and patch management.
1. In addition to the Primary DC, the CSP is responsible for Disaster Recovery Services so as to
ensure continuity of operations in the event of failure of primary data center and meet the RPO
and RTO requirements.
2. RPO should be less than or equal to 2 hours and RTO shall be less than or equal to 4 hours.
The key transaction data shall have RPO of 15 minutes. However, during the change from DC
to DRC or vice-versa (regular planned changes), there should not be any data loss. There shall
be asynchronous replication of data between Primary DC and DRDC and the CSP will be
responsible for sizing and providing the DC-DR replication link so as to meet the RTO and the
RPO requirements.
3. The Primary DC and the DRC should be in different seismic zones.
4. The DRC can be offered from a traditional Data Center Facility and all the relevant mandatory
requirements defined for the Primary Data Center as indicated below apply for the Disaster
Recovery Center -
a. Deployment Model Specific Requirements as mentioned in this RFP
b. General Requirements as defined in this RFP
c. Service Level Agreement Management as defined in this RFP
d. Operational Management as defined in this RFP
e. Data Management as defined in this RFP
f. User/Admin Portal Requirements in this RFP
g. LAN / WAN Requirements as mentioned in this RFP
h. Data Center Facilities Requirements as mentioned in this RFP
i. Security Requirements as defined in this RFP
j. Legal Compliance Requirements in this RFP
k. Management Reporting Requirements in this RFP
l. Exit Management and Transition Requirements as mentioned in this RFP
5. In case of any disaster, the security posture of the DR site shall be identical to the posture
provided in the DC.
6. The disaster recovery site shall have the similar environment (physical & IT), processes, and
controls (security, etc.) as that of the primary DC. During normal operations, the Primary Data
Center will serve the requests. The Disaster Recovery Site will not be performing any work but
will remain on standby. During this period, the compute environment for the application in DR
shall be available but with minimum possible compute resources required for a functional DR as
per the solution offered. The application environment shall be installed and ready for use. DR
Database Storage shall be replicated on an ongoing basis and shall be available in full (100% of
the PDC) as per designed RTO/RPO and replication strategy. The storage should be 100% of
the capacity of the Primary Data Center site.
7. In the event of a site failover or switchover, DR site will take over the active role, and all
requests will be routed through that site. Application data and application states will be
replicated between data centers so that when an outage occurs, failover to the surviving data
center can be accomplished within the specified RTO. This is the period during which the
Compute environment for the application shall be equivalent to DC. The installed application
instance and the database shall be usable and the same SLAs as DC shall be provided. The use
of this Full Compute DR environment can be for specific periods during a year for the purposes
of DC failure or DR Drills or DC maintenance. The Database and storage shall be of full capacity
and the licenses and security shall be for full infrastructure. The bandwidth at the DR shall be
scaled to the level of Data center. Users of application should be routed seamlessly from DC
site to DR site. The CSP shall conduct DR drill for two days at the interval of every six months
of operation wherein the Primary DC has to be deactivated and complete operations shall be
carried out from the DR Site. However, during the change from DC to DRC or vice-versa
(regular planned changes), there should not be any data loss.
8. The CSP shall clearly define the procedure for announcing DR based on the proposed DR
solution. The CSP shall also clearly specify the situations in which disaster shall be announced
along with the implications of disaster and the time frame required for migrating to DR. The
CSP shall plan all the activities to be carried out during the Disaster Drill and issue a notice to
the Department at least two weeks before such drill.
9. The CSP should offer dashboard to monitor RPO and RTO of each application and database.
10. The CSP should offer switchover and switchback of individual applications instead of entire
system.
11. Any lag in data replication should be clearly visible in dashboard and alerts of same should be
sent to respective BEST authorities.
Data Management: It will be the responsibility of CSP to -
□ Manage data isolation in a multi-tenant environment.
□ Provide tools and mechanism to the BEST or its appointed agency for defining their backup
requirements & policy.
□ Provide tools and mechanism to the BEST or its appointed agency for configuring, scheduling,
performing and managing back-ups and restore activities (when required) of all the data
including but not limited to files, folders, images, system state, databases and Enterprise
applications in an encrypted manner as per the defined policy.
□ Transfer data back in-house either on demand or in case of contract or order termination for
any reason.
□ Manage data remanence throughout the data life cycle.
□ Provide and implement security mechanisms for handling data at rest and in transit.
□ CSP shall not delete any data at the end of the agreement (for a maximum of 45 days
beyond the expiry of the Agreement) without the express approval of the BEST.
□ When the BEST or CSP (with prior approval of the BEST) scale down the infrastructure
services, CSP shall be responsible for deleting or otherwise securing BEST‘s Content/data
prior to VM deletion and in case deleted, shall ensure that the data cannot be forensically
recovered.
a. Support maintenance of user profiles and present the user with his/her profile at the time of
login
The below requirements are mandatory to be complied with for the Implementation Agency / CSP -
The service shall be available online, on-demand and dynamically scalable up or down per request
for service from the end users (BEST or BEST’s nominated agencies) with two factor authentication
via the SSL through a web browser.
1. Service shall provide auto-scalable, redundant, dynamic computing capabilities or virtual
machines.
2. Service shall allow BEST authorized users to procure and provision computing services or
virtual machine instances online with two factor authentication via the SSL through a web
browser.
3. Service shall allow users to securely and remotely load applications and data onto the
computing or virtual machine instance from the SSL VPN clients only as against the public
internet.
4. Perform an Image backup of Customer VM Image information or support the ability to take
an existing running instance or a copy of an instance and export the instance into BEST’s
approved image format.
5. Configuration and Management of the Virtual Machine shall be enabled via a Web browser
over the SSL VPN clients only as against the public internet.
6. In case of suspension of a running VM, the VM shall still be available for reactivation for a
reasonable time without having to reinstall or reconfigure the VM for the BEST solution. In
case of suspension beyond a reasonable time, all the data within it shall be immediately
deleted/ destroyed and certify the VM and data destruction to the BEST as per stipulations
and shall ensure that the data cannot be forensically recovered.
7. CSP shall ensure that VMs receive OS patching, health checking, Systematic Attack Detection
and backup functions.
8. Monitor VM up/down status and resource utilization such as RAM, CPU, Disk, IOPS and
network.
9. Provide hardware or software based virtual load balancer Services (VLBS) through a secure,
hardened, redundant CSP Managed Virtual Load Balancer platform.
10. Provide hardware or software based virtual load balancing as a service to provide stateful
failover and enable Customers to distribute traffic load across multiple servers.
11. Support Clustering
12. Operating System (OS)
a. Service shall support one or more of the major OS such as Windows, LINUX.
b. Management of the OS processes and log files including security logs retained in guest
VMs;
c. Provide anti-virus protection;
d. Provide OS level security as per CSP standard operational procedures as defined in the
Information Security Controls for Cloud Managed Services and supporting
documentation;
13.Persistence
a. Persistent Bundled Storage is retained when the virtual machine instance is stopped or
Listed below are mandatory requirements to be provided by CSP for all cloud deployment
models. The service shall be available online, on-demand, and dynamically scalable up or down
per request for service from the end users (BEST/Citizens) with two factor authentication via the
SSL through a web browser.
1. Service shall provide scalable, redundant, dynamic storage.
2. Service shall provide users with the ability to procure storage with two factor authentication
via the SSL through a web browser and manage storage capabilities remotely via the SSL VPN
clients as against the public internet.
3. Service shall provide storage capabilities on-demand, dynamically scalable per request and
management of the storage via the SSL VPN clients as against the public internet.
4. Storage Space: Online, on-demand virtual storage supporting a single storage sizes in
multiples of 1 GB.
5. Data Transfer Bandwidth: Bandwidth utilized to transfer files/objects in/out of the providers
infrastructure supporting a minimum of 100GB of data transferred (in and out) within 1 hour
via the network.
6. There shall not be any additional costs associated with data transfer over and above the
ordinary bandwidth charges, or for bulk transfer for BEST.
Once the centralized MeitY empaneled third party location is ready for hosting the application,
the service level parameters related to the Data Centre shall be tested. After successful testing,
the application will be hosted for live usage. After successful commissioning all the concerned
service level parameters shall be tested. The Implementation Agency shall also provide
documentation related to the support required at the hosting environment, which shall follow
the ITIL (Information Technology Infrastructure Library) standards. The Minimum list of
documents includes -
a. Computing infrastructure bill of material
b. Details of the Manpower Support
c. Process documentation: The IA shall be responsible for preparing process documentation
related to the operation and maintenance of the application at primary site. The prepared
process document shall be approved by BEST before completion of Operational Acceptance.
The initial list of the Process Documentation are -
i. Data Backup policy and the Security
ii. Security Policy
iii. Configuration details of Routers, Switches, Firewall, IPS, etc.
BEST may modify the list time to time based on the policies. The Implementation Agency shall
adhere to the policies drafted and enforced by BEST, like security policy, etc. Tests such as
infrastructure testing, data integrity testing, etc. shall be conducted on the Data Centre during its
acceptance. Proper documented evidences shall be submitted by the Implementation Agency on the
above test results for the acceptance of DC.
The service provider shall conduct training sessions, explaining features of the Cloud system and how
to use these features for in case of any departmental requirement. The training material (master
copy) will be provided by the solution provider. Hands on training sessions should be of about one
day duration and shall be conducted at BEST. The training shall be provided by a trained &
experienced professional having excellent communication skills. BEST will be providing
desktops/OHP/necessary infrastructure to trainers. The training should be at no extra cost to BEST.
The bidder will submit two hard copies of the orientation and technical training to BEST.
Sr. Type of Target No. of sessions Duration Manual /
No. Training Audience (Batch size =20) per Session Material
Required
(Yes / No)
Technical BEST IT Staff 1 per Quarter for
1 2 Days Yes
Session 1st Year
Technical 1 per year for 2nd
2 BEST IT Staff 2 Days Yes
Session year onwards
Listed below are mandatory requirements applicable for all cloud deployment models provided by
CSP.
1. CSP is responsible for provisioning, securing, monitoring, and maintaining the hardware,
network(s), and software that support the infrastructure and present Virtual Machines (VMs)
and IT resources to the BEST.
2. In case, the CSP provides some of the System Software as a Service for the project, CSP is
responsible for securing, monitoring, and maintaining the System and any supporting
software. IA/CSP is responsible for securing and maintaining the all the products as
mentioned in this document.
3. The Data Center Facility shall at a minimum implement the security toolset: Security & Data
Privacy (Data & Network Security including Anti-Virus, Virtual Firewall, Multi Factor
Authentication, VPN, IPS, Log Analyzer / Syslog, SSL, DDOS Protection, HIDS / NIDS, Rights
Management, SIEM, Integrated Vulnerability Assessment, SOC, Private Virtual Zones, Data
Privacy, Data Encryption, Certifications & Compliance, Authentication & Authorization, and
Auditing & Accounting)
4. Meet the ever evolving security requirements as specified by CERT-In (http://www.cert-
in.org.in/)
5. Meet any security requirements published (or to be published) by MeitY or any standards
body setup / recognized by Government of India from time to time and notified to the CSP by
MeitY as a mandatory standard
6. MeitY and BEST reserves the right to verify the security test results.
a. In case of the Government Community Cloud, MeitY and BEST reserves the right to verify
the infrastructure.
7. Implement industry standard storage strategies and controls for securing data in the Storage
Area Network so that clients are restricted to their allocated storage.
8. Deploy public facing services in a zone (DMZ) different from the application services. The
Database nodes (RDBMS) should be in a separate zone with higher security layer.
9. Ability to create non-production environments and segregate (in a different VLAN) non-
production environments from the production environment such that the users of the
environments are in separate networks.
10. Cloud offering should have built-in user-level controls and administrator logs for transparency
and audit control.
11. Cloud Platform should be protected by fully-managed Intrusion detection system using
signature, protocol, and anomaly based inspection thus providing network intrusion detection
monitoring.
12. Cloud platform should provide Edge-to-Edge security, visibility and carrier-class threat
management and remediation against security hazards like Denial of Service (DoS) and
Distributed Denial of Service (DDoS) attacks, botnets, etc. Also, shall provide protection
against network issues such as traffic and routing instability.
13. Cloud platform should provide Web Application Filter for OWASP Top 10 protection as a
service that can be enabled for BEST that require such a service.
14. Access to BEST provisioned servers on the cloud should be through SSL VPN clients only as
against the public internet.
15. Virtual Machines should not have console access.
16. Cloud Service provider shall allow audits of all administrator activities performed by BEST and
allow BEST to download copies of these logs in CSV format.
17. Maintain the security features described below, investigate incidents detected, undertake
corrective action, and report to Government Department, as appropriate
18. Deploy and update commercial anti-malware tools (for systems using Microsoft operating
systems), investigate incidents, and undertake remedial action necessary to restore servers
and operating systems to operation.
19. Shall provide consolidated view of the availability, integrity and consistency of the
Web/App/DB tiers
20. CSP should enforce password policies (complex password, change password in some days
etc.)
21. Shall be contractually subject to all BEST IT Security standards, policies, and reporting
requirements. The CSP shall meet and comply with all BEST IT Security Policies and all
applicable BEST standards and guidelines, other Government-wide laws and regulations for
protection and security of Information Technology.
22. Shall generally and substantially and in good faith follow BEST guidelines and CERT-In
Security guidance. Where there are no procedural guides, use generally accepted industry
best practices for IT security.
23. Conduct regular independent third party assessments of the CSP’s security controls to
determine the extent to which security controls are implemented correctly, operating as
intended, and producing the desired outcome with respect to meeting security requirements
and submit the results to BEST.
24. CSP is responsible for mitigating all security risks found and continuous monitoring activities.
All high-risk vulnerabilities must be mitigated within 30 days and all moderate risk
vulnerabilities must be mitigated within 90 days from the date vulnerabilities are formally
identified. BEST will determine the risk rating of vulnerabilities.
25. BEST has the right to perform manual or automated audits, scans, reviews, or other
inspections of the CSP’s IT environment being used to provide or facilitate services for the
Government Department through a MeitY's designated third party auditor. CSP shall be
responsible for the following privacy and security safeguards -
a. CSP shall not publish or disclose in any manner, without BEST’s written consent, the
details of any safeguards either designed or developed by the CSP under the Agreement
or otherwise provided by the GoI& Government Department.
b. To the extent required to carry out a program of inspection to safeguard against threats
and hazards to the security, integrity, and confidentiality of any non-public Government
data collected and stored by the CSP, the CSP shall afford the BEST logical and physical
access to the CSP’s facilities, installations, technical capabilities, operations,
documentation, records, and databases within 72 hours of the request. Automated audits
shall include, but are not limited to, the following methods -
i. Authenticated and unauthenticated operating system/network vulnerability scans
ii. Authenticated and unauthenticated web application vulnerability scans
iii. Authenticated and unauthenticated database application vulnerability scans
Following cloud resource deployment/provisioning, the testing of the same at Cloud site becomes
very important. Therefore the service provider must perform following testing -
□ Infrastructure testing - The bidder should perform various testing procedures listed below on
infrastructure (server, storage and network infrastructure) provided at Cloud site.
□ VM testing
□ Storage/Disk IO testing
□ Network throughput testing
□ CPU and RAM benchmarking testing
□ Read/Write latency testing
□ Data Integrity Testing, Reverse Replication Testing and Switch over testing: The Cloud Service
Provider will facilitate the DR Vendor and FMS vendor of BEST to carry out these testing,
whenever required.
collected and stored by the CSP, the CSP shall afford the MeitY or its nominated agency
access to the CSP’s facilities, installations, technical capabilities, operations, documentation,
records, and databases.
□ d. If new or unanticipated threats or hazards are discovered by either the MeitY or BEST,
Government or the CSP, or if existing safeguards have ceased to function, the discoverer shall
immediately bring the situation to the attention of CERT-In and the other party.
after cloud resources and provisioned and switchover testing (as applicable) has been completed.
Switchover testing would include:
□ Switch over of application from DC to DR as per defined RTO and RPO
□ Switch over applications from DR to DC as per defined RTO and RPO
□ Complete Data Replication and Reverse Data Replication as per RPO
□ Fully functional application while DR site is operational as confirmed by BEST end users of
application
The service provider will have to facilitate the operational acceptance tests. Operational acceptance
tests will be performed by BEST; however the Cloud Service Provider will have to facilitate operation
acceptance during commissioning of the system (or subsystem[s]), to ascertain whether the system
(or major component or Subsystem[s]) conforms to the scope of work, including, but not restricted
to, the functional requirements. The service provider will have to facilitate the testing of all
applications from BEST users during the operational acceptance.
After the Operational Acceptance is completed, the Service provider may give a notice to BEST’s
Project Manager requesting the issue of an Operational Acceptance Certificate. Within fourteen (14)
days after receipt of the Service provider’s notice, the Project Manager shall -
□ issue an Operational Acceptance Certificate; or
□ notify the Service provider in writing of any deficiencies or other reason for the failure of the
Operational Acceptance Tests; or
□ If the System or Subsystem fails to pass the Operational Acceptance Test(s), then either -
□ BEST may consider terminating the Contract, or
□ BEST to fulfill its obligations under the Contract, the Service provider shall be deemed to have
fulfilled its obligations with respect to the relevant technical and functional aspects of the
Contract.
If within thirty (30) days after the receipt of Service provider’s notice, Project Manager fails to issue
the Operational Acceptance Certificate or fails to inform the Service provider in writing of the
justifiable reasons why the Project Manager has not issued the Operational Acceptance Certificate,
the System or Subsystem shall be deemed to have been accepted as of the date of the Service
provider’s said notice. Operational Acceptance has to be performed for each phase.
Help Desk /Customer Support: The Bidder shall provide a centralized helpdesk/ customer care
center telephone number/ E-mail/ fax number for attending user request/ complaints at no extra cost
to BEST. The helpdesk/customer care centre shall operate during working hours as per BEST for the
support period. A detailed escalation plan shall have to be submitted before the commissioning of the
services, consisting of not more than 4 tiers from helpdesk to Global/Country Service Manager.
The service provider shall provide an incident tracking system via a web interface / mail / IVR,
available in real-time which will issue a trouble ticket once a complaint is booked successfully where
SLA’s can be calculated at no extra cost to BEST . This trouble ticket system should be capable of
generating monthly/quarterly/half yearly/yearly reports.
The help desk service will serve as a single point of contact for all incident and service requests at
the Cloud Service Provider. The activities related to Cloud shall include the following -
□ Solution should comprise of a completely automated system of raising issues on a portal
through web / intranet, call logging, ticket generation, sending alerts on email and escalation
to the cloud administrators and end users.
□ The solution provider shall ensure that if any tickets pertain to action from their end, these
calls are fully responded by the professional team.
□ Provide Help Desk facility during agreed service period window for reporting user department
incidents / issues / problems with the IT infrastructure.
□ Provide necessary channels for reporting issues to the help desk.
□ The Help desk shall log user calls related to Cloud Solution and assign an incident/ call ID
number. Severity shall be assigned to each call as per the SLAs.
□ Creation of knowledge base on frequently asked questions to assist user departments in
resolving basic issues themselves Track each incident / call to resolution.
□ Provide feedback to callers.
□ Analyze the call statistics.
□ Creation of knowledge base on frequently asked questions to aid users. Any call logs and its
associated resolution shall be stored in knowledge management database for future
reference.
□ Escorting of BEST IT department executives to the server farm area (for any inspection etc.)
will be done by helpdesk team.
□ Continuous monitoring of cloud based IT infrastructure at the site to ensure availability as
per agreed SLAs.
□ Escalate the calls, to the appropriate levels, if necessary as per the escalation matrix agreed
between the IA and the user department. The escalation matrix shall be developed by the IA
in discussion with the department.
□ Analyze the incident/ call statistics and provide monthly reports including but not limited to:
o Type of incidents / calls logged
o Incidents / calls resolved
o Incidents / calls open
Provisioning Cloud Services for additional quantities at same rate: The rates offered by
Bidder/ Cloud Service Provider must be valid for entire contract/project duration. No variation in
these quoted rates shall be allowed during this period. BEST will have liberty to order additional
cloud service items, at the rates offered in the commercial bid.
b. Weekly Reports
□ Summary of systems rebooted.
□ Summary of issues / complaints logged with the OEMs.
□ Summary of changes undertaken in the Data Centre including major changes like
configuration changes, patch upgrades, etc. and minor changes like log truncation,
volume expansion, user
□ Creation, user password reset, etc.
□ Report for Security Breaches if any and action taken by CSP
□ Hypervisor patch update status of all servers including the Virtual Machines
c. Monthly reports
Security Audits
The Cloud Service Provider’s services offerings should be audited and certified by STQC/MeitY.
The Cloud Service Provider’s services offerings shall comply with the audit requirements defined
under the terms and conditions of the Provisional Empanelment of the Cloud Service Providers (or
STQC/ MeitY guidelines as and when published).
The Audit, Access and Reporting Requirements should be as per the terms and conditions of the
Provisional Empanelment of the Cloud Service Provider.
The service provider shall conduct vulnerability and penetration test (from a third party testing
agency which may be CERT-IN empaneled) on the proposed Cloud solution in every 6 months and
reports should be shared. The service provider needs to update the system in response to any
adverse findings in the report, without any additional cost to BEST. BEST may also depute auditors
to conduct security check/ vulnerability test/penetration test.
Additionally, the Cloud Service Provider shall ensure all newly deployed Infrastructure is in compliant
with all applicable regulatory requirements and with BEST quality standards including BEST IT
policies.
Exit Management and Transition Requirements: Listed below are mandatory requirements
applicable for CSPs-
1. Continuity and performance of the Services at all times including the duration of the Agreement
and post expiry of the Agreement is a critical requirement of the BEST. It is the prime
responsibility of CSP to ensure continuity of service at all times of the Agreement including exit
management period and in no way any facility/service shall be affected/degraded. Further, CSP is
also responsible for all activities required to train and transfer the knowledge to the Replacement
Agency (or BEST) to ensure similar continuity and performance of the Services post expiry of the
Agreement.
2. At the end of the contract period or upon termination of contract, CSP is required to provide
necessary handholding and transition support to ensure the continuity and performance of the
Services to the complete satisfaction of BEST.
3. CSP shall support the BEST in migration of the VMs, data, content and any other assets to the
new environment created by the BEST on alternate Cloud Service Provider’s offerings to enable
successful deployment and running of the BEST’s solution on the new infrastructure. CSP shall
certify the VM, Content and data destruction to the BEST as per stipulations and shall ensure that
the data cannot be forensically recovered. CSP shall have the responsibility to support and assist
the BEST till the Department is able to successfully deploy and access the services from the new
environment.
4. CSP shall not delete any data at the end of the agreement (for a maximum of 45 days beyond
the expiry of the Agreement) without the express approval of the BEST.
5. During the exit/transition management process, it is the responsibility of the CSP to address and
rectify the problems with respect to migration of the Department application and related IT
infrastructure including installation/reinstallation of the system software etc.
6. The ownership of the data generated upon usage of the system, at any point of time during the
contract or expiry or termination of the contract, shall rest absolutely with BEST.
7. During the contract period, the CSP shall ensure that all the documentation required by the BEST
Department for smooth transition including configuration documents are kept up to date and all
such documentation is handed over to the department during the exit management process.
Traffic Application
The applications of Traffic Department are developed by BEST internal IT Team. But now it is being
transformed into ITMS (Intelligent Traffic Management System), for that a separate vendor has been
on boarded and the development is under process.
Mobile Applications –
Mobile app for Mains Engineer O&M - integrated with OLCCS.
Mobile app for dashboard to provide MIS
Mobile app for Meter Reading: Mobile application to collect Meter reading data from site.
Mobile app for Fuse Man: Mobile Application built for Supply department using .NET API.
MiBEST Mobile App: BEST supply department uses this mobile Billing application for departmental
purposes, it was developed by BEST IT Team.
BEST PARIWAAR Mobile App: This Mobile app is built for BEST Employees, this application helps
employee to view his /her SR details, payslip, PF details, Leave details, LTA, ITAX, etc. Phone diary is
also available in this mobile application.
Ntracker Mobile App: This Mobile application is built for BEST Supply Department outdoor staff.
Work allocation, managing field duty staff, their attendance, Overtime payment, Casual labour
attendance.
LMS : Mobile app for Leave management
eOffice :used as an electronic file transfer application and is integrated with Digital Signature
BEST Websites:www.bestundertaking.com , www.bestundertaking.co , olccs.bestundertaking.net
The BrihanMumbai Electric Supply & Transport Undertaking of the BrihanMumbaiMagarpalika website
is http://www.bestundertaking.com/in/. IA will be required to integrate all the existing
links/Urls/applications used by BEST into one Single Window using ERP Enterprise Portal.
www.bestundertaking.co and olccs.bestundertaking.net are the websites maintained by IT
Department.
IA would be responsible to map all the existing Assets spread across various departments of BEST
with the new ERP solution. There should be integration of Asset Management with GIS, SCADA,
AMR, and MDAS and that should be done by IA. It is expected that the proposed solution should be
able to perform the following activities -
□ Define the Asset Type
□ Create Asset Categories (Class and Sub Class)
□ Define Category Sets/Asset Groups
□ Associate and confine the Category Sets to the Asset Group
□ Define the Organization Level Default Cost element
□ Define the Organization Level Default Cost Category
□ Define the Maintenance Activities &Schedule based on criticality of assets or past history of
assets to breakdown"
□ Define Asset Activity Association Templates
□ Define relationship between Asset Groups, Asset Categories and Activities/ associate Activity
Templates to the Asset Groups
□ Attach Documents (that are generic to all the assets under that group) to the Asset Groups
□ Define organization wise maintenance work request approval
□ Workflow should be triggered depending upon the priority
□ Organization and Department wise approvers (Department Heads) for Work Request
Approval.
□ Define Asset Numbering format that is unique across the Business Group
□ Define Asset Number Creation mode
□ Associate the asset Tag number with the maintainable asset.
□ Define default WIP accounting classes for each maintenance organization.
□ Define the default department for the maintenance organization. Parent child relationship
need to be established.
□ Define the Location/ Areas for the asset deployment and define the same.
□ Define the asset owning departments and respective departments should be responsible for
their maintenance activities.
□ Enable workflow for work orders. Work order should have all tasks related to that work on
one order.
□ Identify whether work order approval is required for the maintenance organization or not
□ "Ability to define the parameters/ elements based on which the work order will be approved
through different levels/ department heads. The parameter level may include:
□ Organization
□ Work Order Type (Planned/ Breakdown/ Preventive/ Major and Minor etc.)
□ Work Order Priority
□ Asset Group
□ Asset Priority
□ Asset Criticality
□ Work Order Activity
□ Work Order Estimated Cost
□ Work Permits required or not
□ Define the Activity Types, Activity Causes, Activity Sources, Activity Priorities
□ Define Asset Sensitivity/ Risk Levels for each Maintainable Asset.
□ Define the Work Request Types/ at Business Group Level & entity level
□ Define the Work Request Priorities (Business Group)
e) Variance
f) Variance percentage
□ Report to identify those assets where a PM jobs was still had resulted in Break Down
and hence the resulting BD cost
□ "Breakdown Cost & Preventive Cost Analysis Report. Maintenance Cost Report Drill
down should be there to see element wise cost by Group"
a) Preventive Cost
b) Preventive Cost percentage
c) Breakdown Cost
d) Breakdown Cost percentage
2.3 The MDM shall be such that it should be capable of operating all the functionality of Smart
Meters.
3. Consumer Indexing -
Power is received from TATA at BEST Receiving Stations at 110 / 33 / 22 kV which is further stepped
down to 11 kV. Electrical Network right from TATAs Incomer to Consumer’s Service is maintained in
Consumer Indexing Module in a hierarchy shown below. 98.5% Consumers are indexed in the
system. Consumers affected on a particular network are identified from indexing and Supply
interruptions SMSs are sent to affected consumers. Outages are also reported at UrjaMitra for first leg
feeders. Feeder wise consumer added for a specific period is required to be extracted from Consumer
Indexing.
The IA shall do a Business Requirements Study for departments of BEST considered under scope.
The As-Is processes and To-Be processes of each of these department shall be prepared and
studied by the IA. Though enough care has been taken to include processes and functions in RFP,
there could be more processes which may need to be captured by the bidder. IA has to ensure
functional compliance requirements of BEST as given below. However, the list given below is not an
exhaustive list. The IA is expected to capture the detail reporting requirements of all the
Departments mentioned in ‘BEST Department-wise activities’ based on discussions with the
Departments and activities covered in current legacy applications in use.
The IA shall also identify the customizations that need to be made to the ERP product & submit a
Business solution blueprint, Solution Architecture and Gap Analysis document. The document will
indicate the additions/ modification that need to be made to the business processes if any in view
of the ERP implementation.
It is the responsibility of the IA to demonstrate the best practices available in the proposed ERP
and how these best practices affect and can be implemented in the existing business processes.
IA has to do self-Certification for the functionality defined below. In case anything is found not true
during project period, the penalty of Rs.10,000/- per functionality will be charged. Remark should
be given for each functionality as given below. Marks will be given on the basis of ‘Remark’. -
Readily available - ‘Y’
Can be customized- ‘C’
Not Supported - ‘N’
The Bidder has to submit the response to the Functional requirements specification in excel format.
Power Utilities
Work order
Work Flow
Meter Reading, Billing & Invoicing
Customer Payment & Account
Customer Interface & Consumer Services
Integration with Other Applications
S. No. Requirement Enter Only If ‘Y’
Y-Readily or ‘C’
available then
C-Can be provide
customized Module
N-Not Name
Supported
1 General
1.1 Work Orders
1.1.1 To create, maintain historic records and delete Work Orders
ups viz. Rev, Int. on Rev, Tax, Int. on Tax, Misc., Prev.
Reading, Pres Reading, Diff, Multiplying Factor,
Consumption Slab wise, FC slab wise, Energy charges slab
wise, rebates, Excess load penalty, PF Surcharge, Delated
payment charges, Penal Interest, D&R Fee, other Debits,
Tax, Credits, adjustments, Govt. subsidy, Payments,
Incentives, payment cancellations, adj. of deposits, adj. of
Int. on Deposit, adj. of Itax on Int. on Deposit, write off,
closing balance with all break ups as available in the
database. (This is only an indicative)
2.5.23 Generation of monthly Debit Credit Report
2.5.24 Ledger Adjustment –
□ Support adj. – debit
□ Support adj. – credit
2.5.25 Last bill generation –
□ Last bill generation - customer initiated (out of
cycle)
□ Last bill generation - Utility initiated
2.5.26 Provision for holding printing bill till checked –
□ should have post billing filters to sort out abnormal
bills
2.5.27 Provision for –
□ Multilingual bill (Marathi, English, Hindi)
□ Net meter billing
□ Dual source energy meter billing
□ franchisee consumer
□ On-line bill of any individual consumer can be
generated from the system any time on the basis of
reading obtained at that time
□ Spot billing including optional spot collection
□ Street Light Billing
□ suspense a/c system
□ Advance Payment Module
□ On Demand Billing for Voluntary Disconnection
cases.
□ Disconnection notice generation
□ Generation of Cutting-Off jobs
□ Abatement, Revised Bill generation
□ Court case activity
□ Anti-Pilferage activity
□ Customized Closing activity
□ Letter of Credit (NC) and Bank guarantee system
(BG) involving Consumer, Discom, DF and vendor
□ Burnt Meter System
□ Vigilance claim and compounding charges and
Reviewing claim amount for settlement of claim
□ Short term supply billing like billing for Puja, etc
□ Long term temporary supply for construction, etc
□ Treasury Management system
□ CRM and Consumer Services system
□ Modification of due date for a segment of consumers
due to any unforeseen event like strikes, etc.
□ Change of consumer shall be possible across wards /
cycle / MRU
4.1.6 The modules shall incorporate all the existing stages and
business rules involved in processing the new consumer
application. Comprehensive dashboards and reports shall
depict the number of applications received and applications
at each stage and if the applications are being processed
within the regulatory standards.
4.1.7 The New Connection Module shall include O/S checking,
LCC checking, consumer number allocation. There should
be provision for integration of the new connection system
with the Site Office system, Enterprise asset management
and GIS.
Provision for Calculation and processing of Security Deposit
for New Connection and Additional Load are required.
Customer Data Management –
□ An account is always linked to a main customer
(person), who is financially responsible for the
account’s obligations. An Account may have multiple
additional contact Persons linked to it, and a Person
may have more than one Account. This shall allow
□ Balance Sheet
□ Profit and Loss Account
□ Cash Flow statement
□ Reserves and Surplus
□ Trade receivables
□ Cash & Cash equivalents
□ Revenue from Operations, Other Income, Non-Tariff
Income, Others
□ Cost of Power Purchase
□ Finance Costs, Depreciation & Amortization
Expenses
□ Administration & General Expenses, Administration
& General Expenses - Details of remuneration to
Statutory Auditors (excluding Service Tax)
□ Other Debits, Tax Expense - Income Tax/Deferred
Tax
□ Prior Period Items
□ Customer Sales
□ Wheeling charges
□ Voltage wise Sales
□ Distribution Losses
□ Energy Balance
□ Demand & Supply Position
□ Power Purchase Expenses
□ Power Procurement Quantum
□ Administration & General Expenses
□ Non-Tariff Income
□ Provision for bad and doubtful debts
□ Income Tax
□ Revenue from Sale of Electricity forFY x+1 – x+2
seconds.)
Document Management
S. No. Requirement
System should be able to support for any file/document type
1 including pdf, word, excel, email messages, periodicals, email
or print multiple documents based on authorizations.
Facility of storing the various drawings of all the relay
2 schemes and shall also have access to the central storage of
drawings and Documents.
Provision to access the content associated with Business
3 objects/transactions from GUI, Portal, Business Client,
Desktop Windows Explorer or Web UI
4 Ability to perform Full Text search & Attribute based search
Ability to do version control for simple and compound
5 documents, audit trails, comprehensive search, user, group,
and role-based access controls
System should be able to support the records management
covering full lifecycle management. Should also include
capabilities to define content retention policies in addition to
6
formalizing the procedures to classify (ensuring appropriate
metadata), retain, destroy, and/or archive the records of an
organization
System should be able to restrict the ability to add, modify,
7
and delete documents in the repository to authorized users
System should be able to create and maintain audit
8 information of users accessing the files/documents,
modifications, additions, retrievals and deletions
Ability to provide archival of documents & data and provide
9 an interface for viewing archived documents. Should provide
data compression in archiving process
Technological
S. Requirement
No.
Integration
The system should assign and enforce access rights to users for
4 accessing certain data and functions within the application
appropriate to their position and job roles
Consumer Indexing
S. Requirement
No.
1. Power is received from TATA at BEST Receiving Stations at 110
/ 33 / 22 kV which is further stepped down to 11 kV. Electrical
Network right from TATAs incomer to Consumer’s Service should
be maintained in Consumer Indexing Module
2. Consumers affected on a particular network should be identified
Asset Management
S. Requirement
No.
5. IA would be responsible to map all the existing Assets spread
across various departments of BEST
6. There should be integration of Asset Management with GIS,
SCADA, AMR, and MDAS
7. Define the Asset Type
8. Asset Categories (Class and Sub Class)
9. Define Category Sets/Asset Groups
10. Associate and confine the Category Sets to the Asset Group
11. Define the Organization Level Default Cost element
12. Define the Organization Level Default Cost Category
13. Define the Maintenance Activities &Schedule based on criticality
of assets or past history of assets to breakdown"
14. Define Asset Activity Association Templates
15. Define relationship between Asset Groups, Asset Categories and
Activities/ associate Activity Templates to the Asset Groups
16. Attach Documents (that are generic to all the assets under that
group) to the Asset Groups
17. Define organization wise maintenance work request approval
18. Workflow should be triggered depending upon the priority
19. Organization and Department wise approvers (Department
Heads) for Work Request Approval.
20. Define Asset Numbering format that is unique across the
Business Group
21. Define Asset Number Creation mode
22. Associate the asset Tag number with the maintainable asset.
23. Define default WIP accounting classes for each maintenance
organization.
24. Define the default department for the maintenance organization.
Parent child relationship need to be established.
25. Define the Location/ Areas for the asset deployment and define
the same.
26. Define the asset owning departments and respective
departments should be responsible for their maintenance
activities.
27. Enable workflow for work orders. Work order should have all
tasks related to that work on one order.
Implementation Agency will be paid as per its bid price and commercial terms and conditions
mentioned in contract agreement.
The Work Completion timelines are provided Subsystem wise:
‘T’ = Date of issue of “Purchase Order”
The below represents the work completion timelines and payment terms of the project having
implementation period of 9months,post implementation and Cloud Hosting support for 5 years.
Please note the Timelines are based upon assumptions.
30% of A5
9 User Acceptance testing T + 7 months 30% of A1
20% of A2
20% of A3
20% of A4
20% of A5
10 Training of staff T + 8 Months 90% of A6
11 Security Audit certificate for Go-Live T + 8 months 20% of A1
and Data Migration 10% of A2
10% of A3
10% of A4
10% of A5
12 Achievement of Go-Live T + 9 months 20% of A1
30% of A2
30% of A3
30% of A4
30% of A5
10% of A6
** The cost of licenses should not be more than 25% of the overall cost of the project
proposed by the bidder.
***Implementation Agency / Implementation Agency has to apply staggered Licenses
approach. However, the payment will be disbursed accordingly for staggered Licenses.
Initially part of the licenses (as per the need) should be procured and remaining
licenses should be procured after UAT is completed and before go-live.
Please Notes -
□ Adherence to timelines is critical for the success of the project.
□ No advance payment shall be made for staff mobilization.
□ If the Implementation Agency is liable for any penalty as per the SLA (refer to the related
clause of this agreement), the same shall be adjusted from payments due to the
Implementation Agency.
□ BEST will release the payment within 30 days of submission of valid invoice subject to the
condition that invoice and all supporting documents produced are in order and work is
performed as per the scope of the project and meeting the SLA Criteria. BEST shall be entitled
to delay or withhold the payment of a disputed invoice or part of it delivered by
Implementation Agency, when BEST disputes such invoice or part of it, provided that such
dispute is bonafide.
□ It is mandatory for the successful bidder to give details of a bank account in any of the banks
approved by BEST (Specified in Annexure V of the bid document) for easy and quick payments.
All payments under the contract will be made only in this bank account through Electronic
Clearing System/RTGS/NEFT/CBS.
□ BEST at its own discretion may decide to release the partial payment (upto 30%) for specific
milestones, acceptance of which got delayed for reasons not attributable to the IA. In such
cases the remaining 70% shall be released on full acceptance of that particular milestone by
BEST.
Notes:
The payments for Support of BEST ERP systems after Go Live and Hosting and Support Charges
post ERP Go Live to the vendor will be made on the Quarterly invoices generated by vendor on
the basis of the resources deployed on a time and material basis with certified attendance sheet
(Attendance should be based on Aadhar based Biometric Attendance System implemented at
BEST) from appointed authorities of BEST. Attendance sheet along with the deliverable certificate
from the BEST nodal officer should be submitted with the Quarterly invoice for payment. In case
the penalties are in excess of the quarterly payment, service provider shall pay the same in form
of demand draft to BEST within 2 weeks of intimation failing which an interest of 1.5% will be
applicable per day.
The cumulative amount will be paid to the Implementation Agency after obtaining adequate
satisfaction certificate from the end users. Payment will be made to the Implementation Agency
inclusive of GST. Should there be a change in applicable taxes, the actual taxes on the date of
billing would be prevail.
Payment for last 2 quarters shall be made at the end of contract after due calculation of SLA and
Penalties. If the penalty is in excess of the amount to be paid the same shall be paid by the
Implementation Agency within 2 weeks of contract closure failing which an interest of 1.5% will
be applicable per day.
The Implementation Agency will submit the Bills/Invoices as per the terms & conditions of the Bid
Document and contract agreement.
BEST will release the payment within 30 days of submission of valid invoice subject to the
condition that invoice and all supporting documents produced are in order and work is performed
to the satisfaction of BEST. BEST shall be entitled to delay or withhold the payment of any invoice
or part of it delivered by Implementation Agency, when BEST disputes such invoice or part of it,
provided that such dispute is bonafide.
It is mandatory for the Implementation Agencys to give details of a Bank Account in any of the
banks approved by BEST (specified in Annexure V of the document) for easy and quick payments.
All payments under the contract will be made only on this Bank Account through Electronic
Clearing System/ RTGS/ NEFT/ CBS.
1. Critical / High: The application is down impacting critical business functions or multiple
modules/functions down impacting users on daily operations or any module /functionality
deemed as highly critical by BEST.
2. Medium: One module/functionality down impacting critical business functions having
major impact on daily operations.
3. Low: Loss of business functionality for less than 10 users impacting day to day operations
or minor functionality down impacting less than 10 users.
□ The SLAs have been logically segregated in the following categories:
1. Implementation and Hosting of ERP solutions and data migration along with the products
mentioned in the Annexure IX.
2. Deployment of Manpower
3. Application Performance
4. Disaster Recovery
5. Training
6. Security Audit
7. Support/Issue Response and Resolution
8. Change Request
9. Reporting
Commencement of SLA: The SLA shall commence from implementation period itself for adherence to
the implementation plan. The penalty will be deducted from the next payment milestone during the
implementation period. During the O & M period, the penalty will be deducted from the quarterly
payments.
A)Implementation of ERP solutions and Products mentioned as per Annexure IX
including Data Migration and Hosting Charges (including DR) till go Live
Sr. Parameter Metric Basis Penalty
No.
1. Adherence to planned The delay for each Per Rs.15000/day
implementation schedule. milestone as per the Occurrence penalty for the
□ Project Initiation agreed schedule first 3 months
□ Team Mobilization should not be □ Rs.20000/day for
□ User Acceptance exceeded the next three
Testing months
□ Implementation and □ Rs.25000/day for
Operational Six months
Acceptance onwards
□ Design Documents
□ SRS
□ Test Cases and results
□ User Manuals
□ Training Manual
□ Technical Documents
like System Architecture,
Network/Infrastructure
Architecture, etc.
3. Failure to implement Per module Per module Rs.15000/day
Products mentioned as per penalty for the
Annexure IX first 3 months
□ Rs.20000/day for
the next three
months
Rs.25000/day for Six
months onwards
B) Deployment of Manpower
Sr. Parameter Metric Basis Penalty
No.
1 Mobilisation of the team for Within 1 month from Per Rs.15000/day
commencement of work the date of issue of Occurrence penalty for the
the first 3 months
LoI/Purchase/Work □ Rs.20000/day for
Order whichever is the next three
earlier months
□ Rs.25000/day for
Six months
onwards
2 Manpower Availability & Rs. 10,000 per day per
Readiness Resource in case there is
shortage in manpower
deployment or lack of
adequate skills as listed is
the section
In case the resource is
absent for any working
100% as per
day, the payment of that
requirement Daily
resource will be deducted
timelines
on prorata basis from the
running quarter bill.
In case the resource is
not available for
continuous 7 working
days, the penalty of Rs.
10,000 per day will be
imposed.
□ Successful
switch
over and
operation
of
application
4. Recovery of T weeks, Rs. 5,000 for delay of each week, subject to a maximum of
data lost where 10% of contract value.
during T is the time
disaster period
mutually
agreed
between
BEST and IA
for the 100%
recovery of
lost
data
E) Security Audit and ISO Certification
Sr. Parameter Target Basis Penalty
No.
1. Third Party Security Audit Once every year Per Rs. 5,000 for delay of
Certificate from CERT-In (first Security Audit occurrence each week, subject to a
empaneled agencies for to be done Before maximum of
the entire application and GO Live ) Or any 10% of contract value.
the action taken report by major updations in
the Implementation agency the system.
F)Training
Sr. Parameter Metric Frequency/basis Penalty
No.
1. Adherence to training
95% of the batches Batches planned Rs. 5,000 per
timetable at individual per institution breach per batch.
institutions to be
conducted as per
planned schedule.
2. Training Feedback from 75% of the Feedback Per Rs. 1,000 per
Participants and training participants in a batch breach per batch.
completion certification batch to offer a
feedback rating of 3
or above on a scale
of 1 to 5.
H)Change Request
Sr. Parameter Metric Basis Penalty
No.
1. Criticality of < T, Weekly per Rs. 5,000 value per
Change Occurrence week subject to a
where T is the timeframe for
maximum10% of
completion of the Change request
contract value post
as agreed upon by BEST and the
which BEST may
Implementation Agency
invoke annulment of
the contract.
I)Reporting during pre-implementation, implementation and post implementation
phases ( including Operations and Maintenance Phase)
Type Measurement Penalty
Weekly Status Delivered on Weekly Basis No Penalty
Report
Monthly Status Report Delivered at monthly intervals by the Rs. 5000 per additional week’s
5th of every month with the details of delay.
the previous month. The format of
the report shall be mutually agreed
between BEST and the IA
J)OS , DB ,Security Patches , enhancement Packages upgradation Post Go Live
Type Measurement Penalty
Installation/Upgradation Per Occurrence Rs. 5,000 for delay of each week,
of Packages , updates , subject to a maximum of
upgrades and patches 10% of contract value.
of OS , DB ,application
as and when available
and provided by OEM
within three
months and critical
Patches/updates to be
done within 10 days
from the release of
OEM
K)Miscellaneous Factors
Type Measurement Penalty
Scheduled downtime for Per Occurrence Rs. 1, 00,000 per occurrence for
System Maintenance unscheduled downtime or
per week scheduled downtimes exceeding
<= 2 times per month the specified metric.
Application Security Per occurrence Depending on the type of
Cyber Crime / Hacking Incident and its impact , a
/Data Theft /Fraud penalty of INR 1,00,000 per
attributable to the incident or in case of severe
service Provider issues ( as defined by BEST )
such breach may lead to
termination of contract
□ The down time will be calculated on monthly basis. Non-adherence to any of the services as
mentioned below will lead to penalty as per the SLA clause and will be used to calculate
downtime. The downtime calculated shall not include the following
□ Down time due to hardware/software and application which is owned by BEST at their
premises
□ Negligence or other conduct of BEST or its agents, including a failure or malfunction
resulting from applications or services provided by BEST or its vendors.
□ Failure or malfunction of any equipment or services not provided by the Bidder.
However, it is the responsibility/ onus of the selected Bidder to prove that the outage is attributable
to BEST. The selected Bidder shall obtain the proof authenticated by the BEST’s official that the
outage is attributable to the BEST.
□ The Agency shall deploy sufficient manpower suitably qualified and experienced in shifts
to meet the SLA. Agency shall appoint as many team members as deemed fit by them, to
meet the time Schedule and SLA requirements.
8 Solution Overview
BEST’s ecosystem mainly includes Transport, Electricity supply and General administration.
This tender document is for procurement of ERP licenses, implementation, Cloud Hosting and post
implementation support of the BEST ERP solution for Electricity Billing, Customer Care application and
allied activities. The ERP solution should be core modular, automated, scalable and integrated
software application hosted centrally at third party location from where the users in these entities
can access it through web portal interface. The detailed functional requirement specifications are
given in this Bid document. The system should be able to communicate with various other
modules or independent solutions at BEST.
The Enterprise Resource Planning is an integrated solution that has been revolutionizing the business
processes in collaborative and distributed way. It considered as the backbone of the management
systems due to the unlimited benefits it promises.
Details about required ERP licenses are given in this RFP document, it will be the
implementation Agency’s responsibility to decide new ERP Licenses requirement for procurement
and procure the same in the name of BEST.
The Three (3) main divisions of BEST are as mentioned below -
A. Traffic
B. ElectricSupply
C. General Administration
The ‘User’ Layer: This layer includes the end users accessing the applications over Internet or
Intranet. Role based access would be defined for the internal users for having accessibility to the
respective application modules, and MIS / DSS which would be accessed by higher authorities which
would help them in decision making process. Integrated database structure would ensure a one point
stop search available to all the units.
The ‘Application’ Layer represents all the functional modules, i.e. core application modules and
supporting modules. These modules shall communicate by sharing of data with one another, or by
coordinating an activity between two or more services as per integrated workflows. Users can easily
access solution components having an interface with single sign-on.
The ‘Business Logic’ Layer: All the processes and functionalities within the ERP system be guided
by
‘Business Rules’ and ‘Logics’. The rules engines shall cater to the requirements of each individual
functional module at the ‘Application’ layer and also help in interacting with the modular databases /
data tables.
The ‘Data Access’ layer is envisaged to contain the ‘Metadata’ and also cache of frequently used
raw data. This layer shall closely interact with the ‘Masters’ to control how the data flows to individual
databases / tables and also how efficiently it is retrieved.
The ‘Data’ Layer: The overall solution shall be based on a centralized architecture comprising of
centrally located databases at the Data center as central repository.
The Network Layer: The overall networking solution shall be based on redundant connectivity to
be provisioned by BEST, ensuring optimum up time at all the desired locations.
159
The Implementation agency shall ensure that the BEST portal and other modules has both static and
dynamic information supported in English and Marathi languages. The Implementation agency shall
ensure that the ERP solution web portal is integrated/ interfaced with the existing BEST Portal. The
ERP shall be accessible through a web browser via Internet and Intranet. The kind of information to
be displayed on the web portal shall be managed and controlled through the ‘Application Admin’
module and ‘Content Management’ module in the system. The static web content shall include the
information about the various facilities, and the services available at these facilities, RTI details, key
initiatives of BEST information, quick links, etc. The dynamic content in the web page shall be linked
to ‘Content Management’ module of the ERP core application, where the authorized user, with
adequate rights (granted through ‘Admin’ module) may verify the dynamic content like reports /
information / statistics, scroll messages, etc. and submit for publishing. The Implementation agency
shall be coordinating with BEST regarding upload of relevant contents on the portal and maintaining
the same.
Administration Module
The ERP shall be customized, configured and enabled for various requirements of individual BEST
ERP modules facility. This shall be achieved through the creation and maintenance of various
masters and managing the access to various modules and functionality of the application through an
‘Admin Module’. The Admin Module shall enable or disable access to different modules and
functionalities based on Role Based Access Control(RBAC) and individual facility requirements and
hence the interface will be different for various types of users and depends on the facility. The
application and its functionalities shall be granular and modular enough for the administrator to
enable or disable any particular function of ERP at any department facility, at any given time, asper
their requirement, through ‘Application Admin’ interface, without the need for a developer / code
level change / custom UI change. The Implementation Agency is expected to completely integrate the
modules and enable efficient data sharing among these modules.
Personalized Dashboard
Each user shall have unique login id and password to access the module of ERP solution. After
successful login, all the authorized users shall be able to view their own personalized dashboard. The
Implementation Agency is expected to enable each of the users to view their virtual personal space
and manage their tasks, organize their work etc. based on their roles and responsibilities and
assigned privileges based on Role Based Access Control (RBAC) mechanism. The following features
are required for the personal Dashboard facility controlled through the ‘Admin’ module for all the
internal users -
i. Quick Links – Links within the application as well as external links to access any application
module or website.
ii. Pending Activities/Tasks – A list of tasks assigned / to be performed by the concerned
User, arranged sequentially, along with number and type of tasks. The standard sequence of
completing the tasks for all users should be First in First out (FIFO) sequence.
iii. History of Completed Activities / Tasks – All the completed activities should be displayed
to the concerned User, in case they want to refer it in future. User friendly features like
pagination or drill down to see further details of the completed tasks may be provided, as
required.
iv. MIS reports (Fixed and Ad-hoc / Customized reports) – which may be bookmarked
from the Reporting module of the system; and
v. Red Flags – notifications, alerts etc. as per pre-defined logic or escalation matrix
MIS Reporting
The Implementation Agency shall give authorized users the ability to have a customized list of
reports they wish to use. This module shall be further linked to the Personalized Dashboard where the
same links to these reports can be displayed in small port lets, so that any user may not always
search for their frequently used reports from the reports module, and they can add it to their own
dashboard for ease of use. All the reports made available shall be controlled through ‘Admin’ module
for variable access depending upon the nature and status of the user. The access control list of the
reporting servers shall be mapped and configured with the admin access control policies. The
implementation agency has to coordinate with BEST Departments for the required MIS reports.
Dear Sir,
Having examined the bid, the receipt of which is hereby duly acknowledged, we, the undersigned,
offer to provide the professional services as required and outlined in the bid for the <insert Name of
the bid/project>.
We attach hereto our responses to pre-qualification requirements and technical and commercial bids
as required by the bid. We confirm that the information contained in these responses or any part
thereof, including the exhibits, and other documents and instruments delivered or to be delivered to
The BrihanMumbai Electric Supply & Transport Undertaking (BEST),are true, accurate, verifiable and
complete. This response includes all information necessary to ensure that the statements therein do
not in whole or in part mislead the BEST in its short-listing process.
We fully understand and agree to comply that on verification, if any of the information provided here
is found to be misleading the selection process, we are liable to be dismissed from the selection
process or termination of the contract during the project, if selected to do so.
We agree for unconditional acceptance of all the terms and conditions set out in the bid document
and also agree to abide by this bid response for the bid validity period as mentioned in the RFP. We
hereby declare that in case the contract is awarded to us, we shall submit the contract performance
guarantee bond in the form prescribed in the bid.
We agree that you are not bound to accept any bid response you may receive. We also agree that
you reserve the right in absolute sense to reject all or any of the products/ services specified in the
bid response.
It is hereby confirmed that I/We are entitled to act on behalf of our company/ corporation/ firm/
organization and empowered to sign this document as well as such other documents, which may be
required in this connection.
Designation :
Address :
Telephone and Fax :
E-mail address :
6. Website URL
7. Details of Company Registration (Please
enclose copy of the Company Registration
Certificate)
8. Name of the Registration Authority
9. Registration Number and Year of Registration
10. ISO/CMMi Certifications with Validity
11. GST Registration No.
12. Permanent Account Number (PAN)
13. Company’s Revenue for last 3 years (Year - wise)
14. Company’s Net Worth for the last year (as on
March 2019)
Please Note - Bidders need to submit the relevant proofs and supporting documents for the details
provided above.
Contact Details of concerned officials for future correspondence regarding the bid process -
Details Authorized Signatory Secondary Contact
Name
Title
Company Address
Phone
Mobile
Fax
E-mail
(To be submitted on the Letterhead of the responding firm and On a Stamp Paper of Rs 500)
I, of ,do hereby
declare and undertake as under -
Dated day of , 20
Identified by me
Before me
Advocate
Date: DD/MM/YYYY
To
<Insert Complete Postal Address>
<Insert Complete Postal Address>
<Insert Complete Postal Address>
Dear Sir,
I would like to hereby state that in the proposal submitted by M/s. ---------------, there are no
deviations from the Bid Document Requirements / Terms & Conditions. The entire work shall be
performed as per the project requirements.
Yours faithfully,
INSTRUCTIONS: 1) The Bank Guarantee should be executed exactly as per this Draft
on a stamp paper of Rs. 500/- along with a Confirmatory Letter
from the regional office of the Bank concerned in the enclosed
format.
(Nature of Business)
under the style and name of M/s.
(Name of the firm)
(hereinafter called “The Contractor”) of the one part and the General Manager, The
Brihanmumbai Electric Supply & Transport Undertaking (hereinafter called “The Undertaking”)
for and on behalf of the Mumbai Municipal Corporation for the purpose of the Undertaking (in
which expression are included, unless the inclusion is inconsistent with the context or
meaning thereof his successor or successors for the time being holding the office of the
“General Manager and Acting General Manager”) of the second part and WHEREAS
at the request of the Contractor we
the Contractor of any of the terms and conditions of the said Contract and/or the
performance thereof. We agree that the decision of the General Manager, whether any
breach of the terms and conditions of the said Contract and/or any failure in the performance
thereof has been committed by the Contractor and the amount of loss, damage, costs,
expenses or otherwise that has been caused or suffered by the Undertaking shall be final and
binding on us and the amount of the said loss, damage, costs and expenses or otherwise
shall be paid by us forthwith on demand to the Undertaking.
(2) We
(Name of the firm and Bank)
further agree that the guarantee herein contained shall remain in full force and effect during
the period that would be taken for satisfactory performance and fulfillment in all respects of
the said Contract provided always that before the expiry of the date of the validity of the
guarantee herein contained, we shall, from time to time on being called upon by the General
Manager, extend the date of validity thereof for the period of 6 months on each occasion
and that if any claim accrues or arises against us -
further agree that the guarantee herein contained shall not be affected by any change in the
constitution of the said Contractor or the Bank.
1. Our liability under this Bank Guarantee shall not exceed Rs. (Rupees
).
2. The Bank Guarantee shall be valid upto and the same can be further extended,
if so requested by the applicant/Contractor.
3. We are liable to pay the guaranteed amount or any part thereof under this Bank
Guarantee only if you serve upon us a written claim or demand on or before
.
For
(Name of the Bank)
(2)
(Signature)
(Signature)
Dear Sir,
We refer to the captioned Bank Guarantee issued on behalf of our clients M/s.
, which is drawn at our
Bank.
The above Bank Guarantee has been given by our clients towards Security Deposit /
Performance Guarantee for the execution of the contract with the BEST Undertaking.
In this regard, we assure and undertaking that in the event of any demand is made by you
for invoking the said Bank Guarantee, the Bank will honour the commitment made by them and the
payment will be made to you without any demur forthwith upon receipt of demand from your office
as per the terms of the guarantee. We, once again, assure you that the interest of your
organization under any circumstances will be fully protected by us.
Yours faithfully,
Dear Sir,
Ref.: Guarantee No. dated
For Rs. issued on behalf of
M/s.
Yours faithfully,
Bidders have to submit a very structured and organized technical bid, which will be analysed by the
Technical Evaluation Committee w.r.t. completeness as per the scope of work and other
requirements in the RFP document. The bidders are required to segregate the bid response as per
the following sections –
A. Bidder’s Competency
This document should bring about the capability of the firm to execute this project. Some of the
required documents are as follows:
□ Financial Capability of the Bidder in required formats and supporting documents
□ Experience of Bidder in ERP implementation or post implementation support projects in
the required formats
□ Experience of Bidder in execution of projects (software development/ customization /
implementation / post-implementation support projects) in Urban Local Bodies / BESTs /
Public Sector Companies in India in required format
□ Experience of the Bidder in executing implementation or post implementation support
projects with Urban Local Bodies in India
B. Proposed Team
As specified in the Technical Bid Evaluation Framework, the department would lay importance to
the right people proposed for the project. Bidder may propose different people for different skill-
sets required and different responsibilities (during Project Implementation and Post-
Implementation). Following documentation is expected in this section -
□ Overall Project Team for both Project Implementation and Support Phases
□ Escalation Chart for the entire Project Duration
□ Summary Table giving Qualification, Experiences, Certifications, Relevance of the
proposed resources
□ Certificate from HR specifying number of technical employees – Software Design,
Development, Testing and Maintenance activities for Urban Local Bodies
□ Certificate from HR specifying number of resources having prior experience in
Customization, Implementation and Support of ERP Systems and experience in
implementing ERP modules as per the details given in this RFP document
□ CVs and Certificates of the Key Resources
□ Detailed CVs in the format attached
Broad areas to be covered in the Technical Solution documentation are given below –
1. Bill of Material: This should include the details of all the proposed IT and Non-IT components,
without specifying the costs. Please note that the bid shall get disqualified if Bidder includes any
pricing details in the technical document.
2. Mapping of features as per the FRS or requirements specified in the bid document.
3. Describe the proposed Technical Solution in a structured manner. Following should be included -
a. Clear articulation and description of the design and technical solution and various components
including details of the application software proposed
b. Justification for choosing the technology over other options.
c. Extent of compliance to technical requirements specified in the scope of work
d. Strength of the Bidder to provide services including examples or case-studies of similar solutions
implemented for other clients
4. Clearly articulate the Strategy, Approach and Methodology for Installation, Configuration
and Implementation of hosted components, data recovery, hosting infrastructure of the project.
5. Approach and Methodology for Management of SLA Requirements specified in the bid document.
Bidders are required to clearly articulate how the SLA requirements would be adhered to.
6. Detailed Project Plan with timelines, resource allocation, milestones etc. for supply, installation
and commissioning of the various project components.
7. Transition Management Plan, wherever applicable
8. Training Plan and Training Methodology
9. Environment management and usage of development, testing, staging and production
environment.
All above mentioned documents shall have an index page with page numbers specified for all the key
information / headers.
General Information
Client for which the Project was executed
Name of the Client Contact Person(s)
Deliverables
Technologies used
Current Status
Other Details
Total Cost of the Project
Total Cost of the Services provided
Duration of the Project (Number of Months,
Start Date, Completion Date, Current Status)
Other Relevant Information
Mandatory Supporting Documents:
□ Work order / Purchase order / Contract for the project
□ Client Certificate giving present status of the project and view of the quality of services by
the Bidder
Please Note - The Bidder is required to use the above format for all the projects referenced for the
Pre-Qualification Criteria and Technical Bid evaluation.
Total Relevant
Total
Sr. Name of the Proposed Highest Experience for the
Experience
No. Resource Role Qualification Proposed Position
(in years)
(in years)
General Information
Client for which the Project was executed
Name of the Client Contact Person(s)
Project Details
Description of the Project
Deliverables
Current Status
Other Details
Total Cost of the project
Total Cost of the services provide
Duration of the Project (Number of Months,
Start Date, Completion Date, Current Status)
Other Relevant Information
Mandatory Supporting Documents:
□ Work Order / Purchase Order / Contract for the project
□ Client Certificate giving present status of the project and view of the quality of services by
the Bidder
Language
8
Proficiency
From Month
and & Year/ To
Month and &
Year:
Employer:
Position Held:
Experience
Total No. of
Years of
11 Experience for
the Role
Proposed
Name of the
Assignment or
Highlights of
Project:
Relevant
Month &Year:
Assignments
handled and Location:
12 significant Client:
Accomplishments Main project
(Use following Features:
format for each Positions held:
project)
Activities
Performed:
10.4 Technical Bill of Material and Bill of Quantity (To be provided by the Bidder)
Please Note -
1. The Implementation Agency shall submit the technical proposal including the BoM with 'Make'
and 'Model' details excluding the Cost.
2. The Bidders can add additional line items as per their requirements
3. Bidder should not include any bid price information in the technical bid
Implementation Agency shall provide the same details as requested in the Section 11.2 Commercial
Bid Formats excluding man month rates and costs. The format is given.
To
<Insert complete postal address>
<Insert complete postal address>
<Insert complete postal address>
Sub : Authorisation Letter to M/s. -------------- for the participation in the bid for Procurement of
Services for Implementation and Support of ERP Software for Electricity Billing,
Customer Care and allied activities
Ref : Bid No: <No> Dated <DD/MM/YYYY>
Sir,
We herewith certify that the above mentioned equipment’s/devices / software products are not end
of the life and we hereby undertake to support these equipment /devices / software for the duration
of minimum 5 years from the date of submission of the bid.
Yours faithfully,
Company Seal
Signature :
Name :
Designation :
Address :
Date :
Please Note - This letter of authority should be on the letterhead of the concerned manufacturer
and should be signed by a person competent and having the power of attorney to bind the
manufacturer.
To
<Insert complete postal address>
<Insert complete postal address>
<Insert complete postal address>
Dear Sir,
We, the undersigned Bidders, having read and examined in detail all the bidding documents in
respect of “Procurement of Services for Implementation and Support of ERP Software for
Electricity Billing, Customer Care and allied activities“ do hereby propose to provide services
as specified in the bid referred above.
2. UNIT RATES
We have indicated in the relevant schedules enclosed, the unit rates for the purpose of payment
as well as for price adjustment in case of any increase to / decrease from the scope of work
under the contract.
3. DEVIATIONS
We declare that all the services shall be performed strictly in accordance with the bid documents
and there are no deviations.
4. QUALIFYING DATA
We confirm having submitted the information as required by you in your Instruction to Bidders.
In case you require any other further information/documentary proof in this regard before
evaluation of our bid, we agree to furnish the same in time to your satisfaction.
5. BID PRICE
We declare that our Bid Price is for the entire scope of the work as specified in the bid document.
These prices are indicated in the subsequent sub-sections of this Section.
We hereby declare that our bid is made in good faith, without collusion or fraud and the information
contained in the bid is true and correct to the best of our knowledge and belief.
We understand that our bid is binding on us and that you are not bound to accept a bid you receive.
We confirm that no Technical deviations are attached here with this commercial offer.
Thanking you,
Yours faithfully,
The Bidder has to quote the rates in the BoQ Spreadsheet available online with this bid. Details to be
filled up for price bid are as below –
All bidders have to quote only the lump sum cost as per the summary of commercial format on the
e-tendering portal. Further, the selected Bidder should submit the break- up of the costs as per
reference tables in the soft format within three working days from the date of opening of the
Commercial bid. Also the selected bidder has to submit the further commercial breakup as required
by BEST which will be informed after selecting the bidder.
The fees shall be inclusive of GST, Income Tax, duties, fees, levies, charges and
commissions as applicable under the relevant Laws of India. Should there be a change in
applicable taxes, the actual taxes on the date of billing would prevail.
Description Cost in INR
(Basic Rate
Sr. No.
+ All the
taxes)
A. Implementation Period of 9 months
A1. License Cost of the proposed ERP solution
A2. Cost of Customization, Configuration and Implementation of the
proposed ERP solution for the required Modules
A3. Cost of Integration with Third Party or External Applications.
(refer Annexure IX for the indicative list of modules)
A4. Cost of Data Migration from Legacy Applications
A5. Hosting Charges
A6. Training of Staff
B. Maintenance Period of 5 years
B1 Annual Support for Licenses, if any
B2. Operations and Maintenance Support
B3. Hosting of Services
B4. Disaster Recovery Services
B5. Helpdesk Support
The Commercial Bid value would be arithmetic sum of table A and B in INR.
Please Note -
1. The Bidder should submit only the 'Summary of the Commercial Format' on the e-Tendering
portal and the detailed commercial bid should be submitted within 2 days of the opening of
Commercial Bid.
2. The bidders may visit the site and obtain additional information at their own cost.
3. The Implementation Agency will quote both for Implementation Cost and the Operations and
Maintenance Cost, the details of which are given in the Bid Document.
4. It is mandatory for the successful bidder to submit the bank account details of any of the banks
approved by BEST (Specified in Annexure V of the bid document) for easy and quick payments.
All payments under the contract will be made only in this bank account through Electronic
Clearing System/RTGS/NEFT/CBS.
5. In case Go-Live is preponed or delayed, payment will be on actuals and the corresponding
operations and maintenance phase will start after the Go-Live is completed.
6. A Project Implementation Committee (PIC) will be constituted which will be responsible for
monitoring the performance of the Implementation agency and recommendations and approvals
for the payment.
7. If the implementation agency is liable for any penalty/liquidated damages as per the SLAs (refer
to the section 7.32), the same shall be adjusted from monthly payments due to the service.
8. BEST to scale up and scale down resources based on requirements. Any line items may be
removed from the scope based on BEST’s discretion.
9. All the prices are to be entered in Indian Rupees ONLY.
10. The allocated Secondary Resources of the service provider to provide services of different
modules can be interchanged as per the requirement of the BEST and in this case the order of
the General Manager (BEST) will be final. Also, it is to be mentioned that Vendor is strictly not
allowed for resource interchange among different modules without BEST permission.
11. Prices indicated in the schedules shall be inclusive of all taxes, Levies, duties etc. It is mandatory
to provide breakup of all Taxes, Duties and Levies wherever asked for.
12. During the payment stage, BEST reserves the right to ask the Bidder to submit proofs of payment
against any of the taxes, duties, levies indicated.
13. The Bidder needs to account for all Out of Pocket expenses due to Boarding, Lodging and other
related items. No additional/separate payment shall be made regarding the same.
14. For the purpose of evaluation of Commercial Bids, BEST shall make appropriate assumptions to
arrive at a common bid price for all the Bidders. This however, shall have no co-relation with the
Contract value or actual payment to be made to the Bidder.
15. The Contract Price shall be firm and not subject to any alteration.
16. The Implementation agency should be deemed to have satisfied itself as to the correctness and
sufficiency of the contract price, which shall, except as otherwise provided for in the contract,
cover all its obligations under the contract.
17. Wherever present, the items mentioned as Lump Sum in above table will have quantity as 1 in
the BOQ available online via e-tendering. However, the bidder should consider the same as Lump
Sum and submit the commercials.
18. All payments shall be made for the corresponding goods or services actually delivered, installed,
or operationally accepted, per the Contract Implementation Schedule, at unit prices and in the
currencies specified in the Commercial Bids.
In addition to the above Commercial Bid Format in part ‘A’ and ‘B’, the Bidder has to
quote the rates in the BOQ Spreadsheet ‘C – Commercials for additional man months in
case of change request management’ available online with this bid. Details to be filled up
for price bid are as below –
Note – The evaluation will be done only on the basis of components defined in BOQ
containing part ‘A’ and ‘B’ only.
DRAFT AGREEMENT
BETWEEN
The General Manager, The BrihanMumbai Electric Supply & Transport Undertaking (“BEST”),
Maharashtra State, (which term or expression, unless excluded by or repugnant to the subject or
context, shall mean and include its successors-in office and assigns) of the First Part (which term or
expression, unless excluded by or repugnant to the subject or context, shall mean and include its
successors-in office and assigns) of the First Part;
AND
Whereas BEST intends to provide convenient and speedy services using Information and
Communication Technologies (ICT) to its officials and has published the bid vide its Tender number
[•] dated [•] to seek services for implementation and support of ERP Project at BEST Undertaking
along with the Cloud Hosting Services and Procurement of required Licenses;
Whereas after evaluation of the bids, BEST has shortlisted and selected the bid of [•] being the most
suitable bidder on the basis of QCBS and issued its LOA vide letter no. [•] dated [•].
And whereas BEST and M/s. --------------------------- have decided to enter into this Agreement on the
terms and conditions stipulated hereinafter.
Whereas the Service Provider has deposited the Performance Bank Guarantee as per the terms of
the Tender through [•]
NOW, THEREFORE, in consideration of the premises covenants and promises contained herein and
other good and valuable considerations, the receipt and adequacy of which is hereby acknowledged,
the Parties intending to be bound legally, IT IS HEREBY AGREED between the Parties as follows –
a. The “Agreement” shall mean this Agreement, together with the recitals and the
schedules and the contents, requirements, specifications and standards (as may be
amended, supplemented or modified in accordance with the provisions hereof) and
the Tender and acceptance thereof together with the documents referred to therein
including these conditions and appendices and any special conditions, the
specifications, designs, drawings, price schedules, bills of quantities and schedule of
rates. All these documents taken together shall be deemed to form one Contract and
shall be complementary to one another.
c. The “Annexure” referred to in these conditions shall mean the relevant annexure
appended to the Tender issued by the BEST.
d. “Bid” means the bid process conducted by BEST and the technical and commercial
bids submitted by the Service Provider, along with the subsequent clarifications and
undertakings, if any;
e. “Commencement Date” means the date upon which the Bidder receives the notice
to commence, issued by the BEST.
h. “Confidential Information” shall have the meaning as provided in clause XLIV (a);
i. “Customers” mean all citizens and business organization and users who use the
BEST services.
k. “Deliverables” means all the activities related to the setting up and operations of
the infrastructure, technical documents, Software Applications, customized Source
Codes, as defined in the bid and subsequent Corrigendum (if any), based on which
the technical bid and commercial bid was submitted by the Bidder and as required as
per this Agreement;
l. “Damages” means the mutually agreed genuine pre-estimated loss and damages
payable by either Party to the other, as set forth in this Agreement, whether on per
diem basis or otherwise, which is incurred by a Party on account of sole acts or
omissions of the other Party which entitles such other Party to receive the same from
the defaulting Party are not by way of Penalty.
m. “Drawings” means all the drawings, calculations and technical information of a like
nature provided by BEST to the Service Provider under this Agreement and all
drawings, calculations, samples, patterns, models, operation & maintenance manual
and other technical information of like nature submitted by the Service Provider and
approved by BEST.
n. “Effective Date” means the date on which the Purchase Order or Letter of Intent is
issued to Service Provider;
t. “Required Consents” means the written consents, clearances and licenses, rights
and other authorizations as may be required to be obtained by the Service Provider,
for all tasks/activities/software/hardware and communication technology for this
project; from all the concerned departments/agencies, etc. as the case may be.
v. The Start Date/Commencement Date is given in the Contract Data. It is the date
when the Service Provider shall commence execution of the Works. It does not
necessarily coincide with any of the Site Possession Dates.
w. “Temporary Works” shall mean all Temporary Works of every kind required in or
about execution, completion or maintenance of the work also Temporary Works are
works designed, constructed, installed, and removed by the Service Provider that are
needed for construction or installation of the Works of the Agreement as found
necessary as per suggestion of the BEST.
x. “Tender” means document seeking Bids from the Bidder’s to the BEST for the
execution and completion of the Works and the remedying of any defects therein in
accordance with the provision of the Agreement, as accepted by the Letter of
Acceptance.
y. “Time for Completion” means the time for completing the execution of and passing
the Tests on Completion of the Works or any Section or part thereof as stated in this
Agreement calculated from the Commencement Date.
z. Service Level(s) means the performance standards, which will apply, to the services
delivered through the Software Application and hardware implemented by the Service
Provider.
aa. Service Level Requirement(s) means the timelines and the quality levels to be
adhered to by the Service Provider for delivering various services under the
Agreement;
bb. Services means the content and services delivered and to be delivered to the
customers or the offices of BEST by the Service Provider, and includes but not limited
to the services specified in the Tender or as specified and incorporated in this
Agreement.
cc. “Specification” shall mean the specification referred to in the Tender and any
modification thereof or addition or deduction thereto as may from time to time be
furnished or approved in writing by the BEST.
dd. Users means the departmental staffs or any other BEST officials having access to
application including its Implementation Agencies, technology vendors, corporations
and agencies and their employees, as the context admits or requires.
ff. The “Works” shall mean the Permanent Works and the Temporary Works or either of
them as appropriate to be executed in accordance with this Agreement or part(s)
thereof, as the case may be and shall include all extra or additional, altered or
substituted works as required for performance.
II) Interpretations
b. Words denoting the singular shall include the plural and vice-versa and words
denoting persons shall include firms and corporations and vice versa;
c. Unless otherwise expressly stated, the words “herein”, “hereof”, “hereunder” and
similar words refer to this Agreement as a whole and not to any particular Article,
Schedule. The term Articles, refers to Articles of this Agreement. The words “include”
and “including” shall not be construed as terms of limitation. The words “day” and
“month” mean “calendar day” and “calendar month” unless otherwise stated. The
words “writing” and “written” mean “in documented form”, whether electronic or hard
copy, unless otherwise stated;
d. The headings and use of bold type in this Agreement are for convenience only and
shall not affect the interpretation of any provision of this Agreement;
e. The Schedules to this Agreement form an integral part of this Agreement and will be
in full force and effect as though they were expressly set out in the body of this
Agreement;
g. References “roll out” includes, unless the context otherwise requires, design,
development, implementation, engineering, procurement, delivery, transportation,
installation, processing, fabrication, acceptance testing, certification, commissioning
and other activities incidental to the construction or roll out, and “construct” or “roll
out” shall be construed accordingly;
h. Any word or expression used in this Agreement shall, unless defined or construed in
this Agreement, bear its ordinary English language meaning;
i. The damages payable by a Party to the other Party as set forth in this Agreement,
whether on per diem basis or otherwise, are mutually agreed genuine pre-estimated
loss and liquidated damages likely to be suffered and incurred by the Party entitled to
receive the same and are not by way of penalties;
j. This Agreement shall operate as a legally binding agreement specifying the master
terms, which apply to the Parties under this agreement and to the provision of the
services by the Service Provider;
m. The agency/individual will establish appropriate processes for notifying the Service
Provider of any deviations from the norms, standards or guidelines at the earliest
instance after taking cognizance of the same to enable the Service Provider to take
corrective action;
n. Such an involvement of and guidance by the agency/person will not, however, absolve
the Service Provider of the fundamental responsibility of designing, installing, testing
and commissioning the application and the infrastructure for efficient and effective
delivery of services as contemplated under this Agreement.
i. This Agreement;
ii. Purchase Order or Letter of Intent issued by BEST to the Service Provider
and
vi. Service Provider’s ‘Technical Bid’ submitted in response to the bid and
responses/clarifications provided in response to queries raised by BEC.
p. i) In the event of conflict between this Agreement and the Schedules, the terms of this
Agreement shall prevail; with overriding effect;
ii) In the event of conflict between terms of this Agreement and the Tender, the terms
of the Tender shall prevail to the extent of such conflict.
□ The term of this Agreement shall be a period of 75 months from the date of execution
of this Agreement. This includes the time required for Implementation and Operations
and Maintenance Support.
□ In the event of implementation period getting extended beyond the stipulated time,
for reasons not attributable to the Service Provider, BEST reserves the right to extend
the term of the Agreement by a suitable period with mutual consensus to allow
validity of Agreement from the date of operational acceptance.
c. In the event of the Service Provider being unable to service the Agreement for
whatever reason, BEST shall be entitled to invoke the Performance Bank Guarantee.
d. Notwithstanding and without prejudice to any rights whatsoever of BEST under this
Agreement in the matter, the proceeds of the Performance Bank Guarantee shall be
payable to BEST as damages for the Service Provider’s failure to complete its
obligations under this Agreement.
e. BEST shall also be entitled to make recoveries from the Service Provider’s bills,
Performance Bank Guarantee, or from any other amount due to the Service Provider,
the equivalent value of any payment made to the Service Provider due to
inadvertence, error, collusion, misconstruction or misstatement.
V) BEST’s Decision
a. Except where otherwise specifically stated, the BEST representative in consideration
with Service Provider will decide contractual matters between BEST and the Service
Provider in the role representing the BEST. However, if BEST representative is
required under the rules and regulations and orders of the BEST to obtain prior
approval of some other authorities for specific actions, he will so obtain the approval,
before communicating his decision to the Service Provider.
b. Except as expressly stated in this Agreement, BEST representative shall not have any
authority to relieve the Service Provider of any of his obligations under the contract.
VI) Delegation
BEST representative, with the approval of the BEST Authority, may delegate any of his duties
and responsibilities to other person(s), except to the Adjudicator, after notifying the Service
Provider, and may cancel any delegation after notifying the Service Provider.
VII) Communication
All certificates, notices or instructions to be given to the Service Provider by BEST shall be
sent on the address / Email Address or contact details given by the Service Provider of Bid.
The address and contact details for communication with the BEST shall be as per the details
given in Agreement Data. Communications between parties that are referred to in the
conditions shall be in writing. The Notice sent by facsimile (fax) or other electronic means
shall be effective on confirmation of the transmission. The Notice sent by Registered post or
Speed post shall be effective on delivery or at the expiry of the normal delivery period as
undertaken by the postal service.
IX) Personnel
a. The Service Provider’s personnel shall appropriately be qualified, skilled and experienced
in their respective trades or occupations. BEST shall have authority to remove, or cause to
be removed, any person employed on the site or Works, who carries out duties
incompetently or negligently.
b. If BEST asks the Service Provider to remove a person who is a member of the Service
Provider‘s staff or work force, stating the reasons, the Service Provider shall ensure that
the person leaves the site within 15 days preferably immediately and has no further
connection with the Works in this Agreement.
a. BEST may require the Service Provider to attend a management meeting. The business
of a management meeting shall be to review the plans for progress of the Works.
b. BEST shall record the business of management meetings and provide copies of the
record to those attending the meeting. The responsibility of the Parties for actions to be
taken shall be decided by BEST either at the management meeting or after the
management meeting and stated in writing to all those who attended the meeting.
XII) Tests
a. The Service Provider will have to perform the mandatory tests as prescribed in the
Specifications. The Service Provider shall be solely responsible for:
b. If BEST instructs the Service Provider to carry out a test not specified in the
Specification/ Quality Assurance Handbook to check whether any work has a defect and
the test shows that it does, the Service Provider shall pay for the test and any samples.
If there is no defect, the test shall be a compensation event.
c. The cost of testing shall be borne by the Service Provider even if the result of the sample
confirms or do not confirm to the relevant specifications.
d. All expenditure required to be incurred in testing shall be borne by the Service Provider
himself.
XIII) Variations
BEST shall, having regard to the scope of the Works and the sanctioned estimated cost, have
power to order, in writing, Variations within the scope of the Works it considers necessary or
advisable during the progress of the Agreement. Such Variations shall form part of the
Agreement and the Service Provider shall carry them out and include them in updated
Programmes produced by the Service Provider.
If rates for Variation items are specified in the Bill of Quantities, the Service Provider shall
carry out such work at the same rate.
a. If Drawings and/or operating and maintenance manuals are required, the Service Provider
shall supply them by the dates stated in the Agreement Data.
b. If the Service Provider does not supply the Drawings and/or manuals by the dates stated in
the Agreement Data, or they do not receive the BESTs approval, BEST shall withhold the
amount stated in the Agreement Data from payments due to the Service Provider.
b. Furthermore, the Service Provider shall keep BEST indemnified in case any action is taken
against the BEST by the competent authority on account of contravention of any of the
provisions of any Act or rules made there under, regulations or notifications including
amendments. If BEST is caused to pay or reimburse, such amounts as may be necessary to
cause or observe, or for non-observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the Service
Provider, BEST shall have the right to deduct any money due to the Service Provider including
its amount of Performance Guarantee. BEST shall also have right to recover from the Service
Provider any sum required or estimated to be required for making good the loss or damage
suffered by BEST.
c. The Service Provider shall require his employees to obey all applicable laws, including those
concerning safety at work.
d. The employees of the Service Provider in no case shall be treated as the employees of the
BEST at any point of time.
The Service Provider shall of all the persons employed in any Works in connection with the
Agreement that the India Official Secrets Act, 1923 (XIX of 1923) applies to them and will
continue to apply even after execution of the said Works and they will not disclose any
information regarding this Agreement to any third party. The Service Provider shall also bring
into notice that, any information found to be leaked out or disclosed the concern person as
well as the Service Provider will be liable for penal action; further the BEST will be at liberty
to terminate this Agreement without notice.
The Service Provider shall save harmless and indemnify the BEST from and against all claims
and proceedings for or on account of infringement of any Patent rights, design trademark or
name of other protected rights in respect of any constructional plant, machine work, or
material used for or in connection with the Works or any of them and from and against all
claims, proceedings, damages, costs, charges and expenses whatsoever in respect thereof or
in relation thereto. Except where otherwise specified, the Service Provider shall pay all
tonnage and other royalties, rent and other payments or compensation, if any, required for
the Works.
It is agreed that the BEST or its representative or Officer shall not be liable to pay any
interest or damage with respect of any moneys or balance which may be in its or its
representative’s or officer’s hands owing to any dispute or difference or claim or Power Utility
Software understanding between the BEST or its representative or Officer on the one hand
and the Service Provider on the other, or with respect to any delay on the part of the BEST or
representative or Officers in making periodical or final payments or in any other respect
whatever.
All documents and other information supplied by the Authority or submitted by a Service
Provider to BEST, Authority shall remain or become the property of BEST Authority. Service
Provider are to treat all information as strictly confidential and shall not use it for any purpose
other than for preparation and submission of their Application. BEST Authority will not return
any Application or any information provided along therewith.
XXI) Taxes
a. G.S.T. and other State Levies/ Cess which are not subsumed under GST will be applicable.
The Service Provider has already quoted the price inclusive of all taxes. It is clearly
understood that BEST will not bear any additional liability towards payment of any Taxes &
Duties.
b. Wherever the services to be provided by the Service Provider falls under Reverse Charge
Mechanism, the price quoted shall be exclusive of GST, but inclusive of Taxes/ Duties/ Cess
other than GST, if any.
c. Rates accepted by BEST shall hold good till completion of work and no additional individual
claim shall be admissible on account of fluctuations in market rates, increase in taxes/ any
other levies/ tolls etc. Except that payment/ recovery for overall market situation shall be
made as per price variation.
a. Agreement may be rescinded and Performance Bank Guarantee (PBG) forfeited for bribing a
public officer;
b. If the Service Provider assigns or sublets his contracts or attempt so to do;
c. Fails to perform any obligation under this Agreement;
d. If bribe, gratuity, gift, loan, perquisite, reward or advantage, pecuniary or otherwise, shall
either directly or indirectly be given and promised or offered by the Service Provider or any of
its servants or agents through public officer, or person in the employ of BEST/Govt.
e. any representation or warranty made by Service Provider in or pursuant to this Agreement or
in any document or certificate or statement is or proves to have been incorrect in any
material respect when made and the circumstances giving rise to the breach of such
representation or warranty.
Upon occurrence of any of the above mentioned defaults of the Service Provider, the
Performance Bank Guarantee (PBG) of the Service Provider shall thereupon stand forfeited
and be absolutely at the disposal of BEST and the same consequences shall ensure as if the
Agreement had been rescinded; and in addition the Service Provider shall not be entitled to
recover or be paid for any work therefore actually performed under the Agreement.
XXIII) Fees
a. Total fees to be paid to the Service Provider for the execution of this Agreement shall as per
the Section 9 of Commercial Bid Formats
<<NOTE >>: While Preparing the Contract please copy paste the pertinent
section from Section 9 Commercial Bid Format.
b. The fees shall be inclusive of GST, Income Tax, duties, fees, levies, charges, and
commissions as applicable under the relevant laws of India. Should there be a change in
applicable taxes, the actual taxes on the date of billing would prevail.
a. Service Provider will be paid as per its bid price and commercial terms and conditions
mentioned in this Agreement.
10% of A3
10% of A4
10% of A5
8 Readiness of the data center for hosting T+ 6 months 10% of A2
the application as certified by lead 10% of A3
bidder 10% of A4
30% of A5
9 User Acceptance testing T + 7 months 30% of A1
20% of A2
20% of A3
20% of A4
20% of A5
10 Training of staff T + 8 Months 90% of A6
11 Security Audit certificate for Go-Live T + 8 months 20% of A1
and Data Migration 10% of A2
10% of A3
10% of A4
10% of A5
12 Achievement of Go-Live T + 9 months 20% of A1
30% of A2
30% of A3
30% of A4
30% of A5
10% of A6
** The cost of licenses should not be more than 25% of the overall cost of the project
proposed by the bidder.
***Implementation Agency / Implementation Agency has to apply staggered Licenses
approach. However, the payment will be disbursed accordingly for staggered Licenses.
Initially part of the licenses (as per the need) should be procured and remaining
licenses should be procured after UAT is completed and before go-live.
h. If the Service Provider is liable for any damage as per the SLA (refer to the related clause of
this agreement), the same shall be adjusted from payments due to the Service Provider.
i. BEST will release the payment within 30 days of submission of valid invoice subject to the
condition that invoice and all supporting documents produced are in order and work is
performed as per the scope of the project and meeting the SLA Criteria. BEST shall be
entitled to delay or withhold the payment of a disputed invoice or part of it delivered by
Service Provider, when BEST disputes such invoice or part of it, provided that such dispute is
bonafide.
j. It is mandatory for the Service Provider to open a bank account in any of the banks approved
by BEST (Specified in Annexure V of the Tender) for easy and quick payments. All payments
under the Agreement will be made only in this bank account through Electronic Clearing
System/RTGS/NEFT/CBS.
k. BEST at its own discretion may decide to release the partial payment (up to 30%) for specific
milestones, acceptance of which got delayed for reasons not attributable to the Service
Provider. In such cases the remaining 70% shall be released on full acceptance of that
particular milestone by BEST.
l. The payments for Support of BEST ERP systems after Go Live and Hosting and Support
Charges post ERP Go Live to the Service Provider will be made on the Quarterly invoices
generated by Service Provider on the basis of the resources deployed on a time and material
basis with certified attendance sheet (Attendance should be based on Aadhar based
Biometric Attendance System implemented at BEST) from appointed authorities of BEST.
Attendance sheet along with the deliverable certificate from the BEST nodal officer should be
submitted with the Quarterly invoice for payment. In case the damages are in excess of the
quarterly payment, Service Provider shall pay the same in form of demand draft to BEST
within 2 weeks of intimation failing which an interest of 1.5% will be applicable per day.
m. The cumulative amount will be paid to the Service Provider after obtaining adequate
satisfaction certificate from the end users. Payment will be made to the Service Provider
inclusive of GST. Should there be a change in applicable taxes, the actual taxes on the date
of billing would be prevail.
n. Payment for last 2 quarters shall be made at the end of Agreement after due calculation of
SLA and damages. If the damage is in excess of the amount to be paid the same shall be
paid by the Service Provider within 2 weeks of Agreement closure failing which an interest of
1.5% will be applicable per day.
o. The Service Provider shall submit the Bills/Invoices as per the terms & conditions of the
Tender and Agreement.
p. BEST will release the payment within 30 days of submission of valid invoice subject to the
condition that invoice and all supporting documents produced are in order and work is
performed to the satisfaction of BEST. BEST shall be entitled to delay or withhold the
payment of any invoice or part of it delivered by Service Provider, when BEST disputes such
invoice or part of it, provided that such dispute is bonafide.
q. It is mandatory for the Service Provider to open a Bank Account in any of the banks approved
by BEST (specified in Annexure V of the Tender) for easy and quick payments. All payments
under the Agreement will be made only on this Bank Account through Electronic Clearing
System/ RTGS/ NEFT/ CBS.
b. Timelines specified in the above section (Work Completion Timelines and Payment
Terms) shall form the Service Levels for delivery of Services specified there-in.
c. All the payments to the Service Provider are linked to the compliance with the SLA metrics
specified in this Agreement.
d. The project Service Level Agreement are proposed to be performance based. For
purposes of Service Level Agreement, the definitions and terms as specified along with
the following terms shall have the meanings set forth below:
8. “Uptime” shall mean the time period for which the specified services / components with
specified technical and service standards are available for the application. Uptime, in
percentage, of any component (Non-IT and IT) can be calculated as:
Uptime = {1- [(System Downtime) / (Total Time – Planned Maintenance Time)]} * 100
9. “Downtime” shall mean the time period for which the specified services / components
with specified technical and service standards are not available for the Users, the
scheduled outages / Planned Maintenance time planned in advance for application,
related infrastructure and link failures. This includes Servers, Routers, Firewall, Switches,
all servers and any other IT and non-IT infrastructure, their subcomponents etc. at all
Project locations etc. The planned maintenance time / scheduled downtime will include
activities like software upgrades, patch management, security software installations etc.
10. The Service Provider will be required to schedule ‘planned maintenance time’ with prior
approval of BEST. This will be planned outside working time. In exceptional
circumstances, BEST may allow the Service Provider to plan scheduled downtime in the
working hours.
12.“Helpdesk Support” shall mean the 24x7x365 centre which shall handle Fault reporting,
Trouble Ticketing and related enquiries during this Agreement.
13.“Response Time” shall mean the time incident is reported to the help desk and an
engineer is assigned for the call.
14.“Resolution Time” shall mean the time taken (after the incident has been reported at the
helpdesk), in resolving (diagnosing, troubleshooting and fixing) or escalating (to the
second level) getting the confirmatory details about the same from the Service Provider
and conveying the same to the end user), the services related troubles during the first
level escalation.
e. The resolution time shall vary based on the severity of the incident reported at the help
desk. The severity would be as follows:
1. Critical / High: The application is down impacting critical business functions or multiple
modules/functions down impacting users on daily operations or any module /functionality
deemed as highly critical by BEST.
2. Medium: One module/functionality down impacting critical business functions having
major impact on daily operations.
3. Low: Loss of business functionality for less than 10 users impacting day to day operations
or minor functionality down impacting less than 10 users.
There are the following categories of the SLAs:
1. Implementation and Hosting of ERP solutions and data migration along with the products
mentioned in the Annexure IX.
2. Deployment of Manpower
3. Application Performance
4. Disaster Recovery
5. Training
6. Security Audit
7. Support/Issue Response and Resolution
8. Change Request
9. Reporting
Commencement of SLA: The SLA shall commence from implementation period itself for
adherence to the implementation plan. The damage will be deducted from the next payment
milestone during the implementation period. During the O & M period, the damages will be
deducted from the quarterly payments.
is the section
In case the resource is
absent for any working
day, the payment of that
resource will be deducted
on pro-rata basis from
the running quarter bill.
In case the resource is
not available for
continuous 7 working
days, the penalty of Rs.
10,000 per day will be
imposed.
3 Replacement of resources Within 15 days of Per Rs. 5,000 per week of
release of existing occurrence delay for deployment of
resource initiated alternate resource
either by BEST or
the Service Provider.
The resource should
be of equivalent or
higher qualification
and experience.
C)Application Performance post Go Live
Sr. Parameter Target Basis Penalty
No.
3. Average Response Time Less than or equal Per occurrence. Per occurrence
during peak usage hours as to 10 seconds This will be penalty shall be Rs.
measured by EMS Tools. calculated monthly 1,000. Maximum
after the Go-live penalty of 10 % of
of the application. Agreement value is
4. Application Uptime >= 99.95% Per occurrence. permissible, post
□ Database Server This will be which BEST may
Uptime calculated monthly invoke Annulment
□ Application Server after the Go-live of the Agreement.
Uptime of the application. Penalty will be
□ Web Server Uptime deducted from the
□ All SAN Storage quarterly
Uptime payments.
□ Any other IT
component in the
Infrastructure
Architecture
D)Disaster Recovery
Sr. Parameter Target Penalty
No.
1. RTO <= 4 hours Rs. 10,000 per additional hour of delay subject to a maximum
delay of 10 hours, post which BEST may invoke annulment of
the contract.
2. RPO <= 2 hours Rs. 10,000 per additional block of 30 minutes subject to a
The key maximum delay of 5 hours, post which BEST may invoke
transaction annulment of the contract.
data shall
have RPO of
15 minutes
3. Mock Drill □ To be Rs. 5000 for delay of each week, subject to a maximum of
conducted 10% of contract value.
every 6
months
□ Successful
switch
over and
operation
of
application
4. Recovery of T weeks, Rs. 5,000 for delay of each week, subject to a maximum of
data lost where 10% of contract value.
during T is the time
disaster period
mutually
agreed
between
BEST and IA
for the 100%
recovery of
lost
data
E) Security Audit and ISO Certification
Sr. Parameter Target Basis Penalty
No.
1. Third Party Security Audit Once every year Per Rs. 5,000 for delay of
Certificate from CERT-In (first Security Audit occurrence each week, subject to a
empaneled agencies for to be done Before maximum of
the entire application with GO Live ) 10% of Agreement
cloud infrastructure of the value.
project and the action
taken report by the Service
Provider
F)Training
Sr. Parameter Metric Frequency/basis Penalty
No.
1. Adherence to training
95% of the batches Batches planned Rs. 5,000 per
timetable at individual per institution breach per batch.
institutions to be
conducted as per
planned schedule.
2. Training Feedback from 75% of the Feedback Per Rs. 1,000 per
Participants and training participants in a batch breach per batch.
completion certification batch to offer a
feedback rating of 3
or above on a scale
of 1 to 5.
H)Change Request
Sr. Parameter Metric Basis Penalty
No.
1. Criticality of < T, Weekly per Rs. 5,000 value per
Change Occurrence week subject to a
where T is the timeframe for
maximum10% of
completion of the Change request
contract value post
as agreed upon by BEST and the
which BEST may
Implementation Agency
invoke annulment of
the contract.
I)Reporting during pre-implementation, implementation and post implementation
phases ( including Operations and Maintenance Phase)
Type Measurement Penalty
Weekly Status Delivered on Weekly Basis No Penalty
Report
Monthly Status Report Delivered at monthly intervals by the Rs. 5000 per additional week’s
5th of every month with the details of delay.
the previous month. The format of
the report shall be mutually agreed
between BEST and the IA
J)OS , DB ,Security Patches , enhancement Packages upgradation Post Go Live
Type Measurement Penalty
Installation/Upgradation Per Occurrence Rs. 5,000 for delay of each week,
of Packages , updates , subject to a maximum of
upgrades and patches of 10% of contract value.
OS , DB ,application as
and when available and
provided by OEM within
three months and
critical Patches/updates
to be done within 10
days from the release of
OEM
K)Miscellaneous Factors
Type Measurement Penalty
Scheduled downtime for Per Occurrence Rs. 1, 00,000 per occurrence for
System Maintenance per unscheduled downtime or
week scheduled downtimes exceeding
<= 2 times per month the specified metric.
Application Security Per occurrence Depending on the type of
Cyber Crime / Hacking Incident and its impact , a
/Data Theft /Fraud penalty of INR 1,00,000 per
attributable to the incident or in case of severe
service Provider issues ( as defined by BEST )
such breach may lead to
termination of Agreement.
a. The down time will be calculated on monthly basis. Non-adherence to any of the services as
mentioned below will lead to damage as per the SLA clause and will be used to calculate
downtime. The downtime calculated shall not include the following:
□ Down time due to hardware/software and application which is owned by BEST at their
premises
□ The Agency shall deploy sufficient manpower suitably qualified and experienced in shifts
to meet the SLA. Agency shall appoint as many team members as deemed fit by them, to
meet the time Schedule and SLA requirements.
XXV) Professional Project Management
a. Service Provider shall execute the project with complete professionalism and full commitment to
the scope of work and the prescribed service levels. Service Provider shall attend regular Project
Review Meetings scheduled by BEST and shall adhere to the directions given during the
meeting. Following responsibilities are to be executed by the Service Provider in regular manner
to ensure the proper management of the project:
i. Finalization of the Project plan in consultation with BEST and its consultant. Project Plan
should consist of work plan, communication matrix, timelines, Quality Plan, Configuration
Management Plan, etc.
ii. Appointment of manager who will act as SPOC for BEST.
iii. Plan and deploy the resources in conjunction with the Project Plan and to execute roles
and responsibilities against each activity of the project plan.
iv. Preparation and regular update of the Risk Register and the Mitigation Plan. Timely
communication of the same to all the identified project stakeholders
v. Submission of Weekly Project Progress Reports
vi. Monthly Compliance report, which will cover compliances to Project Timelines, Project
Team, Hardware and Software delivered, SLAs, etc.
vii. Provision of dashboard to check status of progress of maintenance, support,
implementation and customization work.
viii. The Service Provider should ensure that the behavior of its staff and other manpower is
decent. The agency will be held responsible for indecent behavior of manpower, &such
employees should be immediately replaced when such matter is reported. In case, non-
availability of personnel, the agency will be penalized as per the SLA.
ix. Employees of the Service Provider shall always wear identity card.
i. Take all reasonable and proper care of the entire hardware and software, network or any
other information technology infrastructure components used for the project and other
facilities leased/owned by the Service Provider exclusively in terms of the delivery of the
services as per this Agreement (hereinafter the “Assets”) in proportion to their use and
control of such Assets which will include all upgrades/enhancements and improvements to
meet the needs of the project arising from time to time.
ii. Term “Assets” also refers to all the hardware / software / furniture / data /
documentations / manuals / catalogues / brochures / or any other material procured,
created or utilized by the Service Provider.
iii. Keep all the tangible Assets in good and serviceable condition (reasonable wear and tear
excepted) suitably upgraded subject to the relevant standards as stated in the bid to
meet the SLAs mentioned in the Agreement and during the entire term of the Agreement.
iv. Ensure that any instructions or manuals supplied by the manufacturer of the Assets for
use of Assets and which are provided to the Service Provider will be followed by the
Service Provider and any person who will be responsible for the use of the Asset.
v. Take such steps as may be recommended by the manufacturer of the Assets and notified
to the Service Provider or as may be necessary to use the Assets in a safe manner.
vi. To the extent that the Assets are under the control of the Service Provider, keep the
Assets suitably housed and in conformity with any statutory requirements from time to
time applicable to them.
vii. Not, knowingly or negligently use or permit any of the Assets to be used in contravention
of any statutory provisions or regulation or in any way contrary to law.
viii. Use the Assets exclusively for the purpose of providing the Services as defined in the
Agreement.
ix. Ensure the integration of the software with hardware to be setup and the current Assets
in order to ensure the smooth operations of the entire solution architecture to provide
efficient services to BEST of this Project in an efficient and speedy manner
x. Service Provider shall not use BEST data to provide services for the benefit of any third
party, as a service bureau or in any other manner.
i. The Service Provider will comply with the directions issued from time to time by BEST and
the standards related to the security and safety in so far as it applies to the provision of
the Services.
ii. Adherence to basic e-Governance Guidelines and Standards for data structure (if any)
shall be adhered to.
iii. Service Provider shall also comply with BEST / Government of Maharashtra’s /
Government of India’s information technology security and standard policies in force from
time to time as applicable. BEST shall share the relevant guidelines and standards to the
Service Provider upon signing of this Agreement.
iv. Service Provider shall use reasonable endeavors to report forthwith in writing to all the
partners / contractors about the civil and criminal liabilities accruing due to any
unauthorized access (including unauthorized persons who are employees of any Party) or
XXVIII) Indemnity
a. The Service Provider agrees to indemnify and hold harmless BEST, its officers, employees and
agents(each an “Indemnified Party”) promptly upon demand at any time and from time to
time, from and against any and all losses , claims, damages, liabilities, costs (including
reasonable attorney’s fees and disbursements) and expenses (collectively, “Losses”) to which
the Indemnified Party may become subject, in so far as such losses directly arise out of, in
any way relate to, or result from
i. Any mis-statement or any breach of any representation or warranty made by the Service
Provider or;
ii. The failure by the Service Provider to fulfill any covenant or condition contained in this
Agreement, including the breach of any terms and conditions of this Agreement by any
employee or agent of the Service Provider. Against all losses or damages arising from
claims by third Parties that any Deliverable (or the access, use or other rights thereto),
created by Service Provider pursuant to this Agreement, or any equipment, software,
information, methods of operation or other intellectual property created by Service
Provider pursuant to this Agreement, or the SLAs (I) infringes a copyright, trade mark,
trade design enforceable in India, (II) infringes a patent issued in India, or (III) constitutes
misappropriation or unlawful disclosure or use of another Party’s trade secretes under the
laws of India (collectively, “Infringement Claims”); provided, however, that this will not
apply to any Deliverable (or the access, use or other rights thereto) created by (A)<insert
name of the Project>by itself or through other persons other than Service Provider; (B)
Third Parties (i.e., other than Service Provider) at the direction of BEST, or
iii. Any compensation / claim or proceeding by any third party against BEST arising out of any
act, deed or omission by the Service Provider or;
iv. Claim filed by a workman or employee engaged by the Service Provider for carrying out
work related to this Agreement. For the avoidance of doubt, indemnification of Losses
pursuant to this section shall be made in an amount or amounts sufficient to restore each
of the Indemnified Party to the financial position it would have been in had the losses not
occurred.
b. Any payment made under this Agreement to an indemnity or claim for breach of any
provision of this Agreement shall include applicable taxes.
a. Subject to Sub-clause (b) below, the Implementation Agency (the “Indemnifying Party”)
indemnifies BEST (“indemnified party”) from and against all losses, claims litigation and damages
on account of bodily injury, death or damage to tangible personal property arising in favor or any
person, corporation or other entity (including the Indemnified Party) attributable to the
Indemnifying Party’s performance or non-performance under this Agreement or the SLAs.
b. The indemnities set out in Sub-clause (a) above shall be subject to the following conditions:
i. The Indemnified Party(BEST), as promptly as practicable, informs the Indemnifying
Party in writing of the claim or proceedings and provides all relevant evidence,
documentary or otherwise;
ii. The Indemnified Party shall, at the cost and expenses of the Indemnifying Party, give
the Indemnifying Party all reasonable assistance in the defense of such claim including
reasonable access to all relevant information, documentation and personnel. The
indemnifying party shall bear cost and expenses and fees of the Attorney on behalf of
the Indemnified Party in the litigation, claim.
iii. If the Indemnifying Party does not assume full control over the defense of a claim as
provided in this Article, the Indemnifying Party may participate in such defense at its
sole cost and expense, and the Indemnified Party will have the right to defend the
claim in such manner as it may deem appropriate, and the cost and expense of the
Indemnified Party will be borne and paid by the Indemnifying Party.
iv. The Indemnified Party shall not prejudice, pay or accept any proceedings or claim, or
compromise any proceedings or claim, without the written consent of the
Indemnifying Party;
v. Service Provider hereby indemnify and hold indemnified BEST harmless from and
against any and all damages, losses, liabilities, expenses including legal fees and cost
of litigation in connection with any action, claim, suit, proceedings as if result of claim
made by the third party directly or indirectly arising out of or in connection with this
Agreement.
vi. All settlements of claims subject to indemnification under this Article will: (a) be
entered into only with the consent of the Indemnified Party, which consent will not be
unreasonably withheld and include an unconditional release to the Indemnified Party
from the claimant for all liability in respect of such claim; and (b) include any
appropriate confidentiality agreement prohibiting disclosure of the terms of such
settlement;
vii. The Indemnified Party shall take steps that the Indemnifying Party may reasonably
require to mitigate or reduce its loss as a result of such a claim or proceedings; and
viii. In the event that the Indemnifying Party is obligated to indemnify an Indemnified
Party pursuant to this Article, the Indemnifying Party will, upon payment of such
indemnity in full, be subrogated to all rights and defenses of the Indemnified Party
with respect to the claims to which such indemnification relates;
ix. In the event that the Indemnifying Party is obligated to indemnify the Indemnified
Party pursuant to this Article, the Indemnified Party will be entitled to invoke the
Performance Bank Guarantee, if such indemnity is not paid, either in full or in part,
and on the invocation of the Performance Bank Guarantee, the Indemnifying Party
shall be subrogated to all rights and defenses of the Indemnified Party with respect to
the claims to which such indemnification relates.
x. Service Provider will defend or settle third party claims against BEST solely
attributable to the Service Provider’s infringement of any copyrights, trademarks or
industrial design rights alleged to have occurred in respect of Service Provider
branded hardware/software/deliverables etc. (together “deliverables”) supplied by the
Service Provider. The Service Provider shall pay all costs, damages and attorney's fees
that a court finally awards.
c. BEST shall provide the Implementation Agency with prompt notice of such claim and extend full
cooperation and assistance, information and authority reasonably necessary to defend or settle
such claim. The Implementation Agency will have adequate opportunity to control the response
thereto and the defense thereof.
d. Further as an exclusion, the Implementation Agency shall have no obligation for any claim of
infringement to the extent arising from use of the deliverables in a way not indicated in the
statement of work or in any specifications or documentation provided with such deliverable.
a. Neither Party to this Agreement shall be liable for any delay or failure to perform any of its
obligation to the extent that it’s delay in performance or other failure to perform its
obligations under the Agreement is the result of an event of Force Majeure. For purposes of
this Clause, “Force Majeure” means an event beyond the “reasonable” control of the either
Party, not involving the Service Provider’s fault or negligence and not foreseeable. Unforeseen
circumstances or causes beyond the control of the either Party include but are not limited to
acts of God, war, riot, acts of civil or military authorities, fire, floods, accidents, terrorist
activity, strikes or shortages of transportation facilities, fuel, energy, labor or material.
b. For the Service Provider to take benefit of this clause it is a condition precedent that the
Service Provider must promptly notify BEST, in writing of such conditions and the cause
thereof within five calendar days of the arising of the Force Majeure event. BEST, or the
consultant / committee appointed by BEST shall study the submission of the Service Provider
and inform whether the situation can be qualified one of Force Majeure. Unless otherwise
directed by BEST in writing, the Service Provider shall continue to perform its obligations
under the resultant Agreement as far as it is reasonably practical and shall seek all
reasonable alternative means for performance of services not prevented by the existence of a
Force Majeure event.
c. In the event of delay in performance attributable to the presence of a force majeure event,
the time for performance shall be extended by a period(s) equivalent to the duration of such
delay. If the duration of delay continues beyond a period of 30 days, BEST and the Service
Provider shall hold consultations with each other in an endeavor to find a solution to the
problem.
d. Notwithstanding anything to the contrary mentioned above, the decision of BEST in this
regard shall be final and binding on the Service Provider.
a. This Agreement shall be governed by laws of India. Disputes arising out of this Agreement
shall be first referred to the General Manager BEST for amicable solution. If the dispute is not
resolved within a period of thirty (30) days, the same shall be referred to arbitration in
accordance with Arbitration and Conciliation Act, 1996 (including all amendments thereto).
b. Each party shall appoint one arbitrator each and the two appointed arbitrators shall appoint
the third arbitrator. The decision of the arbitrators shall be final and binding on both parties.
The venue of arbitration shall be Mumbai, India. Subject to the above, this Agreement shall
be subject to the jurisdiction of the courts of Mumbai, India.
a. In the event Service Provider fails to execute the project as stipulated in the Agreement, or
as per the directions given by BEST from time to time, BEST reserves the right to procure
similar services from the next eligible Bidder or from alternate sources at the cost of the
Service Provider. Before taking such a decision, BEST shall serve a notice period of one
month to the Service Provider.
b. The 30 day notice period shall be considered as the ‘Cure Period’ to facilitate the Service
Provider to cure the breach. The provision for Risk Purchase shall be evoked in the event the
Service Provider fails to correct the breach within the ‘Cure Period’.
(ii) Services provided during the twelve (12) months immediately preceding the date of
the claim; that in each case is the subject of the claim.
This limit shall not apply to damages for bodily injury (including death) and damage to real
property and tangible personal property for which the Service Provider is legally liable.
b. The ownership of the application including the licenses, source code and the data shall rest with
BEST.
a. Service Provider shall observe the highest standards of ethics during the execution of the
Agreement. In pursuance of this policy, BEST defines, for the purpose of this provision, the
terms set forth as follows:
a. “Corrupt practice” means the offering, giving, receiving or soliciting of anything of value
to influence the action of BEST in Agreement executions.
c. “Undesirable practice” means (i) establishing contact with any person connected with or
employed or engaged by BEST with the objective of canvassing, lobbying or in any
manner influencing or attempting to influence the Selection Process; or (ii) having a
Conflict of Interest; and
ii. in case of expiry of Agreement, the exit management period shall start, at least 6
months prior to the date when the Agreement comes to an end or in case of
termination of Agreement, on the date when the notice of termination is sent to the
Service Provider. The exit management period ends on the date agreed upon by BEST
or three months after the beginning of the exit management period, whichever is
earlier.
a. Service Provider will promptly, on the commencement of the exit management period,
supply to BEST or its nominated agencies the following:
a. Licenses of the software including related source code in the customized form i.e. same
copy of customized licenses, implemented for BEST Undertaking.
b. Arrangement of data migration on same cloud data centre or on the other cloud services
nominated by BEST Undertaking.
c. Information relating to the current services rendered and performance data relating to
the performance of the services; documentation relating to the project, project’s
customized source code; any other data and confidential information created as part of
or is related to this project;
d. Project data as is reasonably required for purposes of the project or for transitioning of
the services to its replacing Service Provider in a readily available format.
e. All other information (including but not limited to documents, records and agreements)
relating to the services reasonably necessary to enable BEST and its nominated agencies,
or its replacing vendor to carry out due diligence in order to transition the provision of
the Services to BEST or its nominated agencies, or its replacing vendor (as the case may
be).
f. The Service Provider shall ensure smooth functioning of the system after handing
over all the deliverables mentioned in the above points.
g.
b. Service Provider will sign a Non-Disclosure Agreement with BEST. The format for the same
has been included in Annexure VIII.
i.
ii. Rights of Access to Information
At any time during the exit management period, the Service Provider will be obliged to
provide an access of information to BEST and / or any Replacing Vendor in order to make an
inventory of the Assets (including hardware / Software / Active / passive), documentations,
manuals, catalogs, archive data, Live data, policy documents or any other material related to
implementation of the application for BEST.
a. A detailed program of the transfer process that could be used in conjunction with a
Replacement Vendor including details of the means to be used to ensure continuing
provision of the services throughout the transfer process or until the cessation of the
services and of the management structure to be used during the transfer;
b. Plans for the communication with such of the Service Provider, staff, suppliers,
customers and any related third party as are necessary to avoid any material detrimental
impact on Project’s operations as a result of undertaking the transfer;
c. Plans for provision of contingent support to the implementation of hosted Project and
Replacement Vendor for a reasonable period (minimum one month) after transfer.
d. Exit Management Plan shall be presented by the Service Provider to and approved by
BEST or its nominated agencies.
e. The terms of payment as stated in the Terms of Payment Schedule include the costs of
the Service Provider complying with its obligations under this Schedule.
f. During the exit management period, the Service Provider shall use its best efforts to
deliver the services.
g. Payments during the Exit Management period shall be made in accordance with the
Terms of Payment Schedule.
a. BEST may, without prejudice to any other remedy under this Agreement and applicable law,
reserves the right to terminate for breach of Agreement by providing a written notice of 30
days stating the reason for default to the Service Provider and terminate the Agreement
either in whole or in part:
□ If the Service Provider fails to deliver any or all of the project requirements /
operationalization / Operational Acceptance of project within the time frame specified in
the Agreement; or
□ If the Service Provider fails to perform any other obligation(s) under the Agreement.
□ if the breach is solely attributable to the Service Provider and the Service Provider fails to
rectify the breach within the ‘Cure Period’.
b. Prior to providing a notice of termination to the Service Provider, BEST shall provide the Service
Provider with a written notice of cure period of 30 days requiring the Service Provider to cure any
breach/ default of the Agreement, if BEST is of the view that the breach may be rectified.
c. On failure of the Service Provider to rectify such breach within 30 days, BEST may terminate the
Agreement by providing a written notice of 30 days to the Service Provider, provided that such
termination will not prejudice or affect any right of action or remedy which has accrued or will
accrue thereafter to BEST. In such an event the Service Provider shall be liable for Damages
imposed by BEST.
d. In the event of termination of this Agreement for any reason whatsoever, BEST is entitled to
impose any such obligations and conditions and issue any clarifications as may be necessary to
ensure an efficient transition and effective continuity of the services which the Service
Provider shall be obliged to comply with and take all available steps to minimize the loss resulting
from that termination/ breach, and further allow and provide all such assistance to BEST and/ or
succeeding vendor, as may be required, to take over the obligations of the Service Provider in
relation to the execution/ continued execution of the requirements of this Agreement.
e. In case, if any certificates produced by the Service Provider during bid submission are not
genuine or after placing the work order to the Service Provider, it is revealed that Service
Provider does not poses the required qualifications or resources as mentioned in pre-qualification
criteria or technical evaluation then suitable action/damages such as forfeiture of EMD/
Performance Bank Guarantee will be taken.
a) BEST, by notice sent to Service Provider, may terminate the Agreement, in whole or in part,
at any time for its convenience. The notice of termination shall specify that termination is for
BEST’s convenience, the extent to which performance of the Service Provider under the
Agreement is terminated, and the date upon which such termination becomes effective.
b) The deliverables/ Services that are complete and ready for delivery within twenty-eight (28)
days after the Service Provider’s receipt of notice of termination shall be accepted by BEST at
the Agreement terms and prices. For the remaining deliverables/ services, BEST may elect:
I. to have any portion completed and delivered at the Agreement terms and prices;
and/or
II. to cancel the remainder and pay to the Service Provider an agreed amount for
partially completed deliverables and Related Services.
XLI) Miscellaneous
a. Confidentiality
b. Except with the prior written permission of BEST, the Service Provider (including all
partners) and its Personnel shall not disclose such confidential information to any
person or entity not expected to know such information by default of being associated
with the project, nor shall the Service Provider and it’s Personnel make public the
c. The Service Provider recognizes that during the term of this Agreement, sensitive data
will be procured and made available to it, its agents and others working for or under the
Service Provider. Disclosure or usage of the data by any such recipient may constitute a
breach of law applicable causing harm not only to the Department whose data is used
but also to its stakeholders. The function of BEST requires the Service Provider, its
agents to demonstrate utmost care, sensitivity and strict confidentiality. Any breach of
this Article will result in BEST and its nominees receiving a right to seek injunctive relief
and damages, from the Service Provider.
The restrictions of this Article shall not apply to confidential information that:
i. Is or becomes generally available to the public through no breach of this Article by the
Recipient; and
ii. Was in the recipient’s possession free of any obligation of confidence prior to the time of
receipt of it by the Recipient hereunder; and
iii. Is developed by the Recipient independently of any of discloser’s Confidential Information;
and
iv. Is rightfully obtained by the Recipient from third Parties authorized at that time to make such
disclosure without restriction; and
v. Is identified in writing by the Discloser as no longer proprietary or confidential; or
vi. Is required to be disclosed by law, regulation or Court Order, provided that the recipient gives
prompt written notice to the Discloser of such legal and regulatory requirement to disclose so
as to allow the Discloser reasonable opportunity to contest such disclosure.
To the extent that such disclosure is required for the purposes of this Agreement, either Party may
disclose Confidential Information to:
i. Its employees, agents and independent contractors and to any of its affiliates and their
respective independent contractors or employees; and
ii. Its professional advisors and auditors, who require access for the purposes of this
Agreement, whom the relevant Party has informed of its obligations under this Article and in
respect of whom the relevant Party has informed of its obligations under this Article has used
commercially reasonable efforts to ensure that they are contractually obliged to keep such
Confidential Information confidential on terms substantially the same as set forth in this
Article. Either Party may also disclose confidential Information or any entity with the other
Party’s prior written consent.
The provisions of this Article shall survive the expiration or any earlier termination of this Agreement.
b. Standards of Performance
The Service Provider shall provide the services and carry out their obligations under the
Agreement with due diligence, efficiency and professionalism/ethics in accordance with
generally accepted professional standards and practices. The Service Provider shall always act
in respect of any matter relating to this Agreement. The Service Provider shall abide by all the
applicable provisions/Acts/Rules/ Regulations, Standing orders, etc. of Information Technology
as prevalent in the country. The Service Provider shall also conform to the standards laid down
by Government of Maharashtra or Government of India from time to time. Such standards and
guidelines shall be shared with the Service Provider by BEST up on signing of the Agreement.
c. Sub Contracts
Sub-contracting is not permitted.
ii. Service Provider shall ensure that its employees/representatives don’t breach privacy of any
citizen or establishment during the course of execution or maintenance of the project.
e. Independent Contractor
f. Waiver
A waiver of any provision or breach of this Agreement must be in writing and signed by an
authorized official of the Party executing the same. No such waiver shall be construed to
affect or imply a subsequent waiver of the same provision or subsequent breach of this
Agreement
g. Personnel/Employees
ii. Service Provider shall use its best efforts to ensure that sufficient Service Provider personnel
are employed to perform the Services, and that, such personnel have appropriate
qualifications to perform the Services. BEST or its nominated agencies shall have the right to
require the removal or replacement of any Service Provider personnel performing work under
this Agreement. In the event that BEST requests that any Service Provider personnel be
replaced, the substitution of such personnel shall be accomplished pursuant to a mutually
agreed upon schedule and upon clearance of the personnel based on profile review and
personal interview by BEST or its nominated agencies as per defined SLAs. The Service
Provider shall depute quality team for the project and as per requirements BEST shall have
the right to ask Service Provider to change the team.
iii. Management (Regional Head / VP level officer) of Service Provider needs to be involved in
the project monitoring and should attend the review meeting at least once in a month.
iv. The profiles of resources proposed by Service Provider in the technical bid, which are
considered for Technical bid evaluation, shall be construed as ‘Key Personnel’ and the Service
Provider shall not remove such personnel without the prior written consent of BEST. For any
changes to the proposed resources, Service Provider shall provide equivalent or more
experienced resources in consultation with BEST. The penalty applicable for replacement of
‘Key Personnel’ within the first six months of the Agreement shall be Rs. 25,000 per change in
resource. Maximum one replacement is permissible in the first six months.
v. Except as stated in this clause, nothing in this Agreement will limit the ability of Service
Provider freely to assign or reassign its employees; provided that Service Provider shall be
responsible, at its expense, for transferring all appropriate knowledge from personnel being
replaced to their replacements. BEST shall have the right to review and approve Service
Provider’s plan for any such knowledge transfer. Service Provider shall maintain the same
standards for skills and professionalism among replacement personnel as in personnel being
replaced.
vi. Each Party shall be responsible for the performance of all its obligations under this Agreement
and shall be liable for the acts and omissions of its employees and agents in connection
therewith.
a. No amendment, variation or other change to this Agreement or the SLAs shall be valid unless
made in writing and signed by the duly authorized representatives of the Parties to this
Agreement.
b. Each Party to this Agreement or the SLAs agree to enter into or execute, without limitation,
whatever other agreement, document, consent and waiver and to do all other things which
shall or may be reasonably required to complete and deliver the obligations set out in the
Agreement or the SLAs.
i. If any provision of this Agreement or the SLAs, or any part thereof, shall be found by any
court or administrative body of competent jurisdiction to be illegal, invalid or unenforceable
the illegality, invalidity or unenforceability of such provision or part provision shall not affect
the other provisions of this Agreement or the SLAs or the remainder of the provisions in
question which shall remain in full force and effect. The relevant Parties shall negotiate in
good faith in order to agree to substitute for any illegal, invalid or unenforceable provision a
valid and enforceable provision which achieves to the greatest extent possible the economic,
legal and commercial objectives of the illegal, invalid or unenforceable provision or part
provision within seven working days.
ii. No failure to exercise or enforce and no delay in exercising or enforcing on the part of either
Party to this Agreement or the SLAs of any right, remedy or provision of this Agreement or
the SLAs shall operate as a waiver of such right, remedy or provision in any future application
nor shall any single or partial exercise or enforcement of any right, remedy or provision
preclude any other or further exercise or enforcement of any other right, remedy or provision.
j. Survivability
The termination or expiry of this Agreement or the SLAs for any reason shall not affect or
prejudice any terms of this Agreement, or the rights of the Parties under them which are
either expressly or by implication intended to come into effect or continue in effect after such
expiry or termination.
made from time to time concerning such commercial dealings/processing. All legal disputes
are subject to the jurisdiction of Mumbai courts only.
The stamp duty payable for the Agreement shall be borne by the Service Provider.
IN WITNESS whereof the parties hereto have signed this on the day, month and year first herein
above written.
IN WITNESS WHEREOF THE PARTIES HERETO HAVE PUT THEIR HANDS AND SEAL THE DAY AND
YEAR FIRST HEREINABOVE WRITTEN.
In the presence of
1.
2.
In the presence of
1.
2.
The Earnest Money Deposit (EMD) / Performance Bank Guarantee (PBG) issued by branches of
approved Banks beyond Kalyan and Virar can be accepted only if the said EMD / PBG is
countersigned by the Manager of a Branch of the same Bank within the Mumbai City limit
categorically endorsing thereon that the said EMD / PBG is binding on the endorsing Branch of the
Bank within Mumbai limits and is liable to be enforced against the said Branch of the Bank in case of
default by the Implementation Agency furnishing the Banker’s guarantee.
To,
WHEREAS:
them pending before any court, tribunal, arbitrators or any other Authority or body, or by
the discharge of the Bidder for any reason whatsoever.
3. In order to give effect to this Security the Authority shall be entitled to act as if the Bank
were the principal debtor and any change in the constitution of the Bidder and/or the Bank,
whether by their absorption with any other body or corporation or otherwise, shall not in
any way or manner affect the liability or obligation of the Bank under this Security.
4. It shall not be necessary, and the Bank hereby waives any necessity, for Authority to
proceed against the Bidder before presenting to the Bank its demand under this Security.
5. The Authority shall have the liberty, without affecting in any manner the liability of the Bank
under this Security, to vary at any time, the terms and conditions of the Tender Document
or to extend the time or period for the compliance with, fulfilment and/or performance of all
or any of the obligations of the Bidder contained in the Tender Document to postpone for
any time, and from time to time, any of the rights and powers exercisable by the Authority
against the Bidder, and either to enforce or forbear from enforcing any of the terms and
conditions contained in the Tender Document and the Bank shall not be released from its
liability and obligation under these presents by any exercise by the Authority of the liberty
with reference to the matters aforesaid or by reason of time being given to the Bidder or
any other forbearance, indulgence, act or omission on the part of the Authority or of any
other matter or thing whatsoever which under any law relating to sureties and guarantors
would but for this provision have the effect of releasing the Bank from its liability and
obligation under this Security and the Bank hereby waives all of its rights under any such
law.
6. This Security is in addition to and not in substitution of any other Security or security now or
which may hereafter be held by the Authority in respect of or relating to the Tender
Document; or for the fulfilment, compliance and/or performance of all or any of the
obligations of the Bidder under the Tender Document.
7. Notwithstanding anything contained hereinbefore, the liability of the Bank under this
Security is restricted to the Security Amount and this Security will remain in force till {date}
8. Upon request made by the Bidder for release of Bid Security along with the particulars
required hereunder, in accordance with the terms of the Tender Document, the Authority
shall release the Bid Security forthwith provided the Bidder is not in breach of the Tender
Document.
9. The Bank undertakes not to revoke this Bid Security during its currency, except with the
previous express consent of Authority in writing, and declares and warrants that it has the
power to issue this Security and the undersigned has full powers to do so on behalf of the
Bank.
10. Any notice by way of request, demand or otherwise hereunder may be sent by post
addressed to the Bank at its above referred Branch, which shall be deemed to have been
duly authorized to receive such notice and to effect payment thereof forthwith, and if sent
by post it shall be deemed to have been given at the time when it ought to have been
delivered in due course of post and in proving such notice, when given by post, it shall be
sufficient to prove that the envelope containing the notice was posted and a certificate
signed by an officer of the Authority that the envelope was so posted shall be conclusive.
11. This Security shall come into force with immediate effect and shall remain in force and
effect till 180 days from the date of opening of Technical bid and shall be extended from
time to time for such period as may be desired by the BEST Undertaking in accordance with
the terms and conditions of the Contract.
(Signature)
(Name)
(Designation)
(Code Number)
(Address)
Please Note -
□ The Bank Security should contain the name, designation and code number of the officer(s)
signing the guarantee.
□ The address, telephone number and other details of the Head Office of the Bank as well as of
Issuing Branch should be mentioned on the covering letter of issuing Branch.
No………………………………….… Date………………….
To
The……………………………………………
BrihanMumbai Electric Supply & Transport Undertaking (BEST),
Mumbai.
Sir,
Yours faithfully,
Signature:
Name of signatory:
Designation:
Rubber Stamp:
b) Maintain the Confidential Information in strict confidence and take all reasonable steps to
enforce the confidentiality obligations imposed hereunder, but in no event take less care with
the Confidential Information that the parties take to protect the confidentiality of its own
proprietary and confidential information and that of its clients;
d) Not disclose or in any way assist or permit the disclosure of any Confidential Information to
any other person or entity without the express written consent of the other party; and
e) Return to the other party, or destroy, at Department’s discretion, any and all Confidential
Information disclosed in a printed form or other permanent record, or in any other tangible
form (including without limitation, all copies, notes, extracts, analyses, studies, summaries,
records and reproductions thereof) immediately upon the earlier to occur of (i) expiration or
termination of either party’s engagement in the Project, or (ii) the request of the other party
therefore.
f) Not to discuss with any member of public, media, press, any or any other person about the
nature of arrangement entered between Department and Company or the nature of services
to be provided by the Company to the Department.
3. Onus - Company shall have the burden of proving that any disclosure or use inconsistent
with the terms and conditions hereof falls within any of the foregoing exceptions.
4. Exceptions - These restrictions as enumerated in section 1 of this Agreement shall not apply
to any Confidential Information:
a) Which is independently developed by Company or lawfully received from another source free
of restriction and without breach of this Agreement; or
b) After it has become generally available to the public without breach of this Agreement by
Company; or
c) Which at the time of disclosure to Company was known to such party free of restriction and
evidenced by documentation in such party’s possession; or
d) Which Department agrees in writing is free of such restrictions.
e) Which is received from a third party not subject to the obligation of confidentiality with
respect to such Information;
5. Remedies - Company acknowledges that (a) any actual or threatened disclosure or use of
the Confidential Information by Company would be a breach of this agreement and may
cause immediate and irreparable harm to Department; (b) Company affirms that damages
from such disclosure or use by it may be impossible to measure accurately; and (c) injury
sustained by Department may be impossible to calculate and remedy fully. Therefore,
Company acknowledges that in the event of such a breach, Department shall be entitled to
specific performance by Company of Company’s obligations contained in this Agreement. In
addition Company shall indemnify Department of the actual and liquidated damages which
may be demanded by Department. Moreover, Department shall be entitled to recover all
costs (including reasonable attorneys’ fees) which it or they may incur in connection with
defending its interests and enforcement of legal rights arising due to a breach of this
agreement by Company.
6. Need to Know - Company shall restrict disclosure of such Confidential Information to its
employees and/or consultants with a need to know (and advise such employees of the
obligations assumed herein), shall use the Confidential Information only for the purposes set
forth in the Agreement, and shall not disclose such Confidential Information to any affiliates,
subsidiaries, associates and/or third party without prior written approval of the disclosing
party.
7. Intellectual Property Rights Protection - No license to a party, under any trademark,
patent, copyright, design right, mask work protection right, or any other intellectual property
right is either granted or implied by the conveying of Confidential Information to such party.
8. No Conflict - The parties represent and warrant that the performance of its obligations
hereunder do not and shall not conflict with any other agreement or obligation of the
respective parties to which they are a party or by which the respective parties are bound.
9. Authority - The parties represent and warrant that they have all necessary authority and
power to enter into this Agreement and perform their obligations hereunder.
10. Fraud and Corrupt Practices
The Bidder and their respective officers, employees, agents and advisers shall observe the
highest standard of ethics during the Bidding Process. Notwithstanding anything to the
contrary contained herein, the Authority may reject an Application without being liable in any
manner whatsoever to the Bidder if it determines that the Bidder has, directly or indirectly or
through an agent, engaged in corrupt practice, fraudulent practice, coercive practice,
undesirable practice or restrictive practice in the Bidding Process.
Without prejudice to the rights of the Authority under relevant Clause hereinabove, if an
Bidder is found by the Authority to have directly or indirectly or through an agent, engaged or
indulged in any corrupt practice, fraudulent practice, coercive practice, undesirable practice or
restrictive practice during the Bidding Process, such Bidder shall not be eligible to participate
in any tender or RFQ issued by the Authority during a period of 2 (two) years from the date
such Bidder is found by the Authority to have directly or indirectly or through an agent,
engaged or indulged in any corrupt practice, fraudulent practice, coercive practice,
undesirable practice or restrictive practice, as the case may be.
For the purposes of this Clause, the following terms shall have the meaning hereinafter
respectively assigned to them:
matter relating to the Project or the LOA or the Concession Agreement, who at any time has
been or is a legal, financial or technical adviser of the Authority in relation to any matter
concerning the Project;
B. “fraudulent practice” means a misrepresentation or omission of facts or suppression of
facts or disclosure of incomplete facts, in order to influence the Bidding Process;
C. “coercive practice” means impairing or harming or threatening to impair or harm,
directly or indirectly, any person or property to influence any persons participation or action
in the Bidding Process;
D. “undesirable practice” means (i) establishing contact with any person connected with
or employed or engaged by the Authority with the objective of canvassing, lobbying or in any
manner influencing or attempting to influence the Bidding Process; or (ii) having a Conflict of
Interest; and
E. “Restrictive practice” means forming a cartel or arriving at any understanding or
arrangement among Bidder with the objective of restricting or manipulating a full and fair
competition in the Bidding Process.
F. If the BEST determines that the Bidder has engaged in corrupt, fraudulent, collusive,
coercive or obstructive practices, in competing for or in executing the Contract, then the
BEST may, after giving 14 days’ notice to the Bidder, terminate the Bidder employment under
the Contract and expel him from the Site, and the provisions of relevant Clause shall apply as
if such expulsion had been made.
G. Should any employee of the Bidder be determined to have engaged in corrupt, fraudulent,
collusive, coercive, or obstructive practice during the execution of the Works, then that
employee shall be removed in accordance with relevant Clause.
For the purposes of this Sub-Clause:
i. “corrupt practice” is the offering, giving, receiving to soliciting, directly or indirectly, of
anything of value to influence improperly the actions of another party;
ii. “another party” refers to a public official acting in relation to the procurement process
or contract execution. In this context, “public official” includes Financer staff and
employees of other organizations taking or reviewing procurement decisions.
iii. “fraudulent practice” is any act or omission, including a misrepresentation, that
knowingly or recklessly misleads, or attempts to mislead, a party to obtain a financial or
other benefit or to avoid an obligation;
iv. “collusive practice” is an arrangement between two or more parties designed to achieve
an improper purpose, including to influence improperly the actions of another party;
v. “coercive practice” is impairing or harming, or threatening to impair or harm
10. Dispute Resolution - If any difference or dispute arises between the Department and the
Company in connection with the validity, intSAPretation, implementation or alleged breach of
any provision of this Agreement, any such dispute shall be referred to the Hon. General
Manager, BEST.
e) The arbitration proceedings shall be completed within a period of 180 days from the
date of reference of the dispute to arbitration.
11. Governing Law - This Agreement shall be intSAPreted in accordance with and governed by
the substantive and procedural laws of India and the parties hereby consent to the exclusive
jurisdiction of Courts and/or Forums situated at Mumbai, India only.
12. Entire Agreement - This Agreement constitutes the entire understanding and agreement of
the parties, and supersedes all previous or contemporaneous agreement or communications,
both oral and written, representations and under standings among the parties with respect to
the subject matter hereof.
13. Amendments - No amendment, modification and/or discharge of this Agreement shall be
valid or binding on the parties unless made in writing and signed on behalf of each of the
parties by their respective duly authorized officers or representatives.
14. Binding Agreement - This Agreement shall be binding upon and inure to the benefit of the
parties hereto and their respective successors and permitted assigns.
15. Severability - It is the intent of the parties that in case any one or more of the provisions
contained in this Agreement shall be held to be invalid or unenforceable in any respect, such
provision shall be modified to the extent necessary to render it, as modified, valid and
enforceable under applicable laws, and such invalidity or unenforceability shall not affect the
other provisions of this Agreement.
16. Waiver - If either party should waive any breach of any provision of this Agreement, it shall
not thereby be deemed to have waived any preceding or succeeding breach of the same or
any other provision hereof.
17. Survival - Both parties agree that all of their obligations undertaken herein with respect to
Confidential Information received pursuant to this Agreement shall survive till pSAPetuity
even after any expiration or termination of this Agreement.
18. Non-solicitation - During the term of this Agreement and thereafter for a further period of
two (2) years Company shall not solicit or attempt to solicit Department’s employees and/or
consultants, for the purpose of hiring/contract or to proceed to conduct operations/business
similar to Department with any employee and/or consultant of the Department who has
knowledge of the Confidential Information, without the prior written consent of Department.
This section will survive irrespective of the fact whether there exists a commercial relationship
between Company and Department.
19. Term - Subject to aforesaid section 17, this Agreement shall remain valid up to ….. Years
from the “effective date”.
IN WITNESS HEREOF, and intending to be legally bound, the parties have executed this Agreement
to make it effective from the date and year first written above.
For Department
Name:
Title:
WITNESSES:
1. 2.
For Company
Name:
Title:
WITNESSES:
1. 2.
Sr. No. List of SAP licenses to be used in implementation of ERP Solutions at BEST
Note – This is not an exhaustive list. It is expected that all the functionalities and
activities mentioned in the Scope of Work / Functional Requirements / BEST
Department-wise activities should be covered.
Annexure XI: Indicative List of Electricity Bill Collection Centers for BEST
Sr.
ZONE CENTRETYPE CENTRENAME SERVICEAREA
No.
1. SOUTH POSTOFFICE POST OFFICE GPO GPO; KALBADEVI; CHINCH BUNDER
2. SOUTH POSTOFFICE POST OFFICE GPO; KALBADEVI; CHINCH BUNDER
KALBADEVI
3. SOUTH POSTOFFICE POST OFFICE CHINCH GPO; KALBADEVI; CHINCH BUNDER
BUNDER
4. NORTH POSTOFFICE POST OFFICE DADAR DADAR
5. NORTH POSTOFFICE POST OFFICE MUMBAI MUMBAI CENTRAL
CENTRAL
6. NORTH POSTOFFICE POST OFFICE MAHIM MAHIM
7. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
8. SOUTH BEST FLORA FOUNTAIN NR.CTO;M.G. ROAD; HUTATMA
CHOWK; MUMBAI-400 001
9. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
10. SOUTH BEST FORT MARKET MINT ROAD; NEAR CHOWKY;SWAMI
DAYANAND SARASWATI
CHOWK;MUMBAI-400 001
11. SOUTH BEST COLABA BUS.STATION COLABA BUS STATION MUMBAI-400
005.
12. SOUTH BEST BORIBUNDER OPP. BMC HEAD OFFICE; NAGAR
CHOWK MUMBAI-400 001
13. SOUTH BEST CRAWFORD MARKET NR.POLICE COMMISSIONER’S
OFFICE; L.T. MARG; MUMBAI - 400
001
14. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
15. SOUTH BEST PYDHONI VIJAY VALLABH CHOWK; BAPU
KHOTE MARG; MUMBAI-400 003
16. SOUTH BEST PYDHONI VIJAY VALLABH CHOWK; BAPU
KHOTE MARG; MUMBAI-400 003
17. SOUTH BEST DONGRI MARKET MAHAPALIKA MARKET
COMPLEX; MUMBAI-400 009.
18. SOUTH BEST KHETWADI NR.ALANKAR
CINEMA; S.V.P.ROAD; MUMBAI-400
004.
19. SOUTH BEST KAMATHIPURA NR.PANCHSHEEL BLDG.; MANAJI
RAJU MARG; MUMBAI-400 008.
20. SOUTH BEST FLORA FOUNTAIN NR.CTO;M.G. ROAD; HUTATMA
CHOWK; MUMBAI-400 003
21. SOUTH BEST TARDEO TARDEO MARG; TARDEO BUS
Sr.
ZONE CENTRETYPE CENTRENAME SERVICEAREA
No.
STAND (PANDEY COMPOUND)
MUMBAI.- 34
22. SOUTH BEST NANA CHOWK D WARD; NANA CHOWK; MUMBAI -
400007.
23. SOUTH BEST GRANT ROAD NEAR SUPER CINEMA; MOULANA
SHOWKAT ALI RD ; MUMBAI
24. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
25. SOUTH BEST J.J.HOSPITAL J.J.HOSPITAL ;B
WARD; RAMACHANDRA BHATT
MARG; MUMBAI - 8
26. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
27. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
28. SOUTH BEST GOL DEOL SANT SENA MAHARAJ MARG
KHETWADI; MUMBAI–400004.
29. SOUTH BEST TARDEO BUS NEAR NAVJIVAN SOCIETY;TARDEO
STN.COMPLEX DEPOT;R.S.NIMKAR MARG;MUMBAI
30. SOUTH BEST CHINCH BUNDAR 111; KESHAVJI NAIK ROAD; CHINCH
BUNDER
31. SOUTH BEST FANASWADI SITARAM PODAR MARG; GIRGAON
32. SOUTH BEST MAJESTIC MAJESTIC SHOPPING CENTRE.
J.S.S. ROAD GIRGAUM
33. SOUTH BEST PRARTHANA SAMAJ VALLABHBAI PATEL
MARG; GIRGAUM; MUMBAI-400 004.
34. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
35. SOUTH BEST ZAOBAWADI JAGANATH SHANKAR SHETH
ROAD; GIRGAUM; MUMBAI-400 004.
36. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
37. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
38. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
39. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
Sr.
ZONE CENTRETYPE CENTRENAME SERVICEAREA
No.
40. NORTH BEST MATUNGA LABOUR DR.AMBEDKAR
CAMP MARG; MAHANAGARPALIKA
BLDG.; NO.1; DHARAVI; MUMBAI-
400 017.
41. NORTH BEST JACOB CIRCLE SANE GURUJI MARG; MAHALAXMI
RECEIVING SUBSATION; MUMBAI-
400 011.
42. NORTH BEST ZULLA MAIDAN MAULANA AZAD MARG; MUMBAI-
400 011.
43. NORTH BEST WORLI NAKA G.K. MARG; WORLI; MUMBAI-400
018.
44. NORTH BEST MAHIM MAHIM BUS STATION;
SION MUMBAI-400016.
45. NORTH BEST MAHIM MAHIM BUS STATION;
SION MUMBAI-400016.
46. NORTH BEST SION SION BUS STATION;
SION; MUMBAI-400 022.
47. NORTH BEST KING CIRCLE KINGS CIRCLE (MATUNGA) BUS
STATION; OPP.ARORA
CINEMA; MUMBAI-400 019
48. NORTH BEST REAY ROAD NEAR LEVEL CROSSING;
MAZGAON; MUMBAI-400 010.
49. NORTH BEST PRABHADEVI NEW PRABHADEVI ROAD; NEAR
SIDDHI VINAYAK
TEMPLE; PRABHADEVI; MUMBAI 400
025.
50. NORTH BEST PATANWALA 3. E.S. PATANWALA
MARG; BYCULLA
RECEIVING STATION MUMBAI-400
008.
51. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
52. NORTH BEST BYCULLA E WARD MAHAPALIKA OFFICE (E –
WARD) SANKHALISTREET
; MUMBAI-400 008.
53. NORTH BEST KING CIRCLE KINGS CIRCLE (MATUNGA) BUS
STATION; OPP.ARORA
CINEMA; MUMBAI-400 022
54. NORTH BEST LALBAUG NEAR LALBAUG MARKET; DR.
AMBEDKAR ROAD
55. NORTH BEST SEWRI PRABODHANKAR THAKRE UDYAN
BUS STATION; SEWRI; MUMBAI-15
Sr.
ZONE CENTRETYPE CENTRENAME SERVICEAREA
No.
56. NORTH BEST LOWER PAREL. S.B.MARG; NEAR
SHIVALAYA; LOWER
PAREL; MUMBAI-400 013.
57. NORTH BEST WORLI NAKA G.K. MARG; WORLI; MUMBAI-400
018.
58. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
59. NORTH BEST SION SION BUS STATION;
SION; MUMBAI-400 022.
60. NORTH BEST PRABHADEVI RECEIVING NEAR PASSPORT OFFICE; MUMBAI-
STATION 400 025
61. NORTH BEST GOKHALE ROAD GOKHALE ROAD; MAHIM RECEIVING
(NORTH) STATION; NEAR PORTUGESE
CHURCH; MUMBAI-400 028.
62. NORTH BEST LOWER PAREL. S.B.MARG; NEAR
SHIVALAYA; LOWER
PAREL; MUMBAI-400 013.
63. NORTH BEST JAMBORI MAIDAN JAMBORI MAIDAN
OPP.B.D.D.CHAWL NO.7; WORLI-18;
64. NORTH BEST GOKHALE ROAD GOKHALE ROAD; MAHIM RECEIVING
(NORTH) STATION; NEAR PORTUGESE
CHURCH; MUMBAI-400 028.
65. NORTH BEST SARDAR NAGAR SARDAR NAGAR - 1; PRATIKSHA
NAGAR.
66. NORTH BEST H O (N) TRANS .ENG BLDG.; GRD. FLOOR;
DADAR(DISCONNECTION TILAK ROAD; DADAR; MUMBAI - 14
COUNTER)
67. NORTH BEST SUPARI BAUG SUPARI BAUG BEST OFFICER QRTS.
GOKHALE LANE,PAREL, MUMBAI 12
68. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
69. NORTH BEST WADALA WADALA ANCILLERY BUILDING
70. NORTH BEST HEAD OFFICE Kingsway, Dadar
(NORTH)DADAR
71. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
72. SOUTH BEST FLORA FOUNTAIN NR.CTO;M.G. ROAD; HUTATMA
CHOWK; MUMBAI-400 004
73. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
Sr.
ZONE CENTRETYPE CENTRENAME SERVICEAREA
No.
74. SOUTH BEST CRAWFORD MARKET NR.POLICE COMMISSIONER’S
OFFICE; L.T. MARG; MUMBAI - 400
002
75. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
76. SOUTH BEST PYDHONI VIJAY VALLABH CHOWK; BAPU
KHOTE MARG; MUMBAI-400 006
77. SOUTH BEST PYDHONI VIJAY VALLABH CHOWK; BAPU
KHOTE MARG; MUMBAI-400 006
78. SOUTH BEST KHETWADI NR.ALANKAR
CINEMA; S.V.P.ROAD; MUMBAI-400
004.
79. SOUTH BEST FLORA FOUNTAIN NR.CTO;M.G. ROAD; HUTATMA
CHOWK; MUMBAI-400 005
80. SOUTH BEST TARDEO TARDEO MARG; TARDEO BUS
STAND (PANDEY COMPOUND)
MUMBAI.- 36
81. SOUTH BEST NANA CHOWK D WARD; NANA CHOWK; MUMBAI -
400007.
82. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
83. SOUTH BEST J.J.HOSPITAL J.J.HOSPITAL ;B
WARD; RAMACHANDRA BHATT
MARG; MUMBAI - 9
84. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
85. SOUTH BEST GOL DEOL SANT SENA MAHARAJ MARG
KHETWADI; MUMBAI–400004.
86. SOUTH BEST TARDEO BUS NEAR NAVJIVAN SOCIETY;TARDEO
STN.COMPLEX DEPOT;R.S.NIMKAR MARG;MUMBAI
87. SOUTH BEST MAJESTIC MAJESTIC SHOPPING CENTRE.
J.S.S. ROAD GIRGAUM
88. SOUTH BEST HEAD OFFICE NEW ADMINISTRATIVE BLDG.; BEST
MARG; MUMBAI.-400 001.
89. SOUTH BEST ZAOBAWADI Jaganath Shankar sheth
Road; Girgaum; Mumbai-400 004.
90. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
91. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
Sr.
ZONE CENTRETYPE CENTRENAME SERVICEAREA
No.
92. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
93. NORTH BEST JACOB CIRCLE SANE GURUJI MARG; MAHALAXMI
RECEIVING SUBSATION; MUMBAI-
400 011.
94. NORTH BEST ZULLA MAIDAN MAULANA AZAD MARG; MUMBAI-
400 011.
95. NORTH BEST WORLI NAKA G.K. MARG; WORLI; MUMBAI-400
018.
96. NORTH BEST MAHIM MAHIM BUS STATION;
SION MUMBAI-400016.
97. NORTH BEST MAHIM MAHIM BUS STATION;
SION MUMBAI-400016.
98. NORTH BEST SION SION BUS STATION;
SION; MUMBAI-400 022.
99. NORTH BEST KING CIRCLE KINGS CIRCLE (MATUNGA) BUS
STATION; OPP.ARORA
CINEMA; MUMBAI-400 020
100. NORTH BEST PRABHADEVI NEW PRABHADEVI ROAD; NEAR
SIDDHI VINAYAK
TEMPLE; PRABHADEVI; MUMBAI 400
025.
101. NORTH BEST PATANWALA 3. E.S. PATANWALA
MARG; BYCULLA
RECEIVING STATION MUMBAI-400
008.
102. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
103. NORTH BEST BYCULLA E WARD MAHAPALIKA OFFICE (E –
WARD) SANKHALISTREET; MUMBAI-
400 008.
104. NORTH BEST KING CIRCLE KINGS CIRCLE (MATUNGA) BUS
STATION; OPP.ARORA
CINEMA; MUMBAI-400 021
105. NORTH BEST LALBAUG NEAR LALBAUG MARKET; DR.
AMBEDKAR ROAD
106. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
Sr.
ZONE CENTRETYPE CENTRENAME SERVICEAREA
No.
107. NORTH BEST SION SION BUS STATION;
SION; MUMBAI-400 022.
108. NORTH BEST PRABHADEVI RECEIVING NEAR PASSPORT OFFICE; MUMBAI-
STATION 400 026
109. NORTH BEST GOKHALE ROAD GOKHALE ROAD; MAHIM RECEIVING
(NORTH) STATION; NEAR PORTUGESE
CHURCH; MUMBAI-400 028.
110. NORTH BEST GOKHALE ROAD GOKHALE ROAD; MAHIM RECEIVING
(NORTH) STATION; NEAR PORTUGESE
CHURCH; MUMBAI-400 028.
111. SOUTH BEST PATHAKWADI 2nd SHIFT Mumbai
112. NORTH BEST HEAD OFFICE GROUND FLOOR;
(NORTH)DADAR TRANSPORTATION ENGG.
BUILDING; TILAK MARG; DADAR;
MUMBAI-14.
113. SOUTH BEST WALKESHWAR BEST HOUSE, TEEN BATTI,
WALKESHWAR.
114. SOUTH BEST PATHAKWADI C WARD 3RD FLOOR VIDHYUT
BUILDING;PATHAKWADI
115. SOUTH BEST NANA CHOWK MCGM D Ward office; Nana
Chowk, Mumbai - 400007.
116. SOUTH BEST TARDEO BUS NEAR NAVJIVAN SOCIETY;TARDEO
STN.COMPLEX DEPOT;R.S.NIMKAR MARG;MUMBAI
117. SOUTH BEST TARDEO TARDEO, PANDEY COMPOUND,
MUMBAI.- 34
118. SOUTH BEST TWO TANK MAULANA AZAD MARG, TWO TANK
STAFF QUARTER.
119. SOUTH BEST SUPARIBAG Mumbai
120. SOUTH BEST TARDEO BUS NEAR NAVJIVAN SOCIETY;TARDEO
STN.COMPLEX DEPOT;R.S.NIMKAR MARG.
31. BANK NET BANKING HDFC HDFC BANK, DEBIT/ CREDIT CARD
S Alotte
r VM Name VM Host d Database
Core Ram space OS
N (BOM) Name Name
O HDD1
BEST-Supply- OLCCS
MS Win
1 Web-APP 8 32 500
2012 R2 Std
server
BEST-Supply Cobol
2 Billing/Payroll application 8 32 2 TB CentOS7
server
BEST- Mobile- BEST Mobile MS Win
3 APP App Server 4 8 300
2012 R2 Std
BEST- Payment
MS Win
4 Payment-APP Application 8 16 500
2012 R2 Std
Server
Billing App OLCCS
MS Win
5 Service & Dash Dashboard 4 8 500
2012 R2 Std
Board
BEST-Supply- OLCCS MS Win MSSQL
6 DB server Database 16 128 14 TB
2012 R2 Std 2016
OLCCS OLCCS
MS Win MSSQL
7 Database For Report 8 16 6.5 TB
2012 R2 Std 2016
Report Database
Adj. Adj
8 processing Processing 4 8 300 CentOS7
BEST
2. Technical support services
□ Monthly Reports
To include the following: 1. A description of the change; 2. A list of deliverables required for
implementing the change; 3. A timetable for implementation; 4. An estimate of any proposed
change; 5. Any relevant acceptance criteria; 6. An assessment of the value of the proposed
change; 7. Material evidence to prove that the proposed change is not already covered within
the scope of the project, SLAs.
Request for Authority to Proceed
Approved
Rejected
Requires Further Information
(as follows or as attachments)
For BEST For IA
Signature Signature
Name Name
Title Title
Date Date
*** Note –
1. Users are not mutually exclusive
2. User count may vary as per the functionalities provided in the module.
3. A temporary chowky are always near to work site. They can be provided
with laptop and dongle for internet connectivity.
AUDIT DEPARTMENT
Activities of Audit Department will combine with activities of other department. There will not be
separate module for these activities.
Scrutiny of Trenches/Cable Fault Payments Release, through OLCC System and JE thereof i.e.
Trenches System.
□ Scrutiny of Fuel Adjustment Charges proposal levied to the consumers every month.
□ Scrutiny of Short-term/Mid-term/Renewable Energy/Renewable Energy Certificate for Power
Purchase proposals/tenders.
□ Scrutiny of Detail Project Report (DPR) submitted to MERC by Supply Division.
□ Scrutiny of all proposals and files related to MERC.
□ Scrutiny of CGRF and Ombudsman cases
□ Scrutiny of Dishonour Cheques and corresponding Jes of ICICI & other banks.
□ Scrutiny of Estimated Final Reading proposals.
Presently all activities of Customer Care Department are carried out through OLCCS
application.
The main activities of Customer Care Department are as follows:
3. Other related activities i.e. Meter Reading, Billing, Net meter Reading and Billing,
Revenue Management, Meter Management, Asset Management, Network management
and consumer indexing, Consumers mobile app, meter reading mobile app, dashboard
mobile app etc. Have been included in OLCCS, same are to be incorporated by the
implementer.
□ Reading & billing, of electronics meters(19934) account of High Value Consumers in CY-19,
21, 24 and 35
□ Testing & replacement of Defective electronics meters for CY-19, 21, 24 and 35
□ Amendment of Defective meters and preparation Credit /Debit Cases.
□ Maintaining of System AMR Meters
□ TATA Meter reading
□ Procurement of HT & LT CTS and RSM
□ Attending consumers complaint related to CY-19, 21, 24 and 35
n. Clearing of Inspection Memos of HT meters, various sizes of metering CTs, summation CTs
etc.
o. Witnessing HT meters testing in our Meter testing lab for official testing
p. Maintenance of AMR/RMR system
q. Correspondence with M/s Secure Meters Ltd regarding issues of HT meters & AMR/RMR
System.
r. Preparation & Signing of Agreement with Electricity HV Consumers with Sanctioned Load
more than 50 kW.
s. Corresponding with all 9 wards of customer care Dept, MM Dept, Project Dept, IT Dept,2
Erection Dept, Construction Dept., 5 O& M Depts.,2 Planning Depts., Regulatory Cell Dept.
& Audit Dept. regarding queries etc . related with HV consumers.
t. Follow up with all CC wards for additional security deposit & updation of sanctioned load.
u. Preparation of Monthly MIS
v. Attending court cases in case dispute of Electricity bills of consumers
a) Breakdown
1 Attending breakdown of metering installation such as CT flashover, PT flashover and
replacement of defective meter.
2 In this activity, after receiving message from concern O & M division regarding any
breakdown, Dy.E.(HV) will inspect the metering installation for any abnormality and will
report to SHVC-3.
3. The Undertaking of the consumer will be taken from consumer’s authorized representative for
unmetered supply at the time of inspection.
4. The job of attending breakdown will be carried out after written intimation and clearance
from the consumer and from concern O & M division.
5. Notice will be given to the consumer for shutdown if required in advance.
6. After completion of job, the report will be written in concerned consumer’s file and this file
will be forwarded to SHVC-3 for their information.
7. If there is any change in metering CT ratio, approval of this will be obtained from SHVC-3 in
advance.
8. After completion of job, necessary transaction will be carried out and confirmed in OLCCS
system.
9. After completion of above mentioned work, Master Data should be updated, if required.
2 A new green file will be initiated for the new HV consumer and respective papers will be
placed in the file.
3 After receiving message for installation of new HV metering inspection of proposed location
for metering box will be carried out and position of the metering box will be fixed.
4 In co-ordination with Dy.E.(Erection), the work of wiring of meter box will be carried out.
5 If the bus bar is already charged the work of wiring of consumer breaker should be carried
out with taking permit from fault engineer for the safety.
6 The message will be given to concerned CC dept. and Erection Dept. regarding completion of
metering wiring work.
7 New HV meter will be kept ready by checking its configuration and test report.
8 After verification of connection order from concerned CC dept., the meter will be installed in
the metering box.
9 After completion of installation and commissioning work, the meter and metering installation
will be inspected with the help of phase angle meter for its proper functioning.
10 After completion of job, initial reading of new meter maintained in respective consumer file
and forward to respective Customer Care for transaction in OLCCS system.
11 In the next month, proper billing of the new consumer to be checked.
d) Maintenance of AMR/RMR System:
1 To look after and arrange the maintenance of AMR/RMR System such as maintenance of
Server, up gradation of anti-virus software, storage of downloaded data, backup of the data
etc.
2 Inventory of RMR HV meters, Server SIM card and modems should be maintained.
3 Server should be kept on reading mode to collect data one day before 1st date of every
month.
4 At the time of reading of HV meters, if there is no connectivity through RMR system for any
reason, such meters should be identified, listed out and to be informed to reading Ch.Engr.
for arranging manual reading of RMR meters and to rectify the problem for non connectivity.
5 RMR Meters, modems which are declared faulty should be sent to M/s. Secure and SIM card
sent to Telecommunication dept. for replacement and its record should be maintained.
6 Follow up with M/s. Secure for attending defective meters, modems and its accessories for
replacement and with Telecommunication dept. for SIM card.
7 After studying instapara, tamper events and load survey submitting report to SHVC-3 for RMR
meters.
8 Follow up with Vodafone for attending Network connectivity problem, SIM problem etc.
1. Taking meter readings of meters installed in the premises of BEST as per requirement of TPC
metering engineers on 1st day of every month.
2. Dumping the data of MRI and sending the downloaded meters to M/s.TPC for consumption
calculation.
3. Witnessing jointly meter reading with M/s.TPC metering engineers.
4. Processing metering data received from M/s.TPC in software.
5. Verification of metering data given by M/s.TPC with metering data processed in software.
6. Declaration of maximum demand and registered units of concerned month.
7. Declaration of coincident maximum demand as per information received from DEPRO.
8. Preparation of Bulk supply statistics.
The above activities are also time bound which is carried out with the help of Foreman in
P1/T7 grade and nawghany in P1/T1 for quick supply restoration for HV Consumers. The
section has 3 nos of Dye, T-8-3 nos, T-7-2 nos. Shop recorder 1 no. and Nawghanies 2
nos.
I) Reading Section
Reading section of HVC dept is responsible for reading of approximately 19500 meter of CY-19, 24
and CY-35. The section is headed by Assistant Engineer. The section has Dy. Engrs.-2 Nos, Charge
Engr- 6+1 nos., MRBC’s- 40 +20 nos., Shop Recorder-1no. The MRBC (T)s are doing job of reading
these electronic meters from various locations of Mumbai City with help of Nawghanies on daily
basis. These meters are read through Mo b i l e a p p a n d CMRI (Common Meter Reading
Instruments) Completing the
reading and exception of CY-19, 24 & 35 is time bound activity. The readings and exception of CY-24
and CY-(19 & 35) has to be completed by 09th day for South zone and 19th day for North zone of
respective month.
Activities
1) The no of meters to be read of CY-19 and CY-24 is downloaded from OLCC.
2) MRBC (T)s are taking reading of diff types of meter (Elster, Secure, L&T, Emco,
Genus, Visiontek, Secure DLMS, L&T DLMS, Genus DLMS) daily through mobile app
and CMRI. Different meter reading software is uploaded to CMRI for taking meter
reading.
3) These meters are downloaded in PC through different reading software. The data is
then processed and ASCII (American Standard Code for Information Interchange) is
prepared of different make meters. CMRI are prepared for next day reading.
4) The ASCII of different type meters is then processed to prepare a combined file (.
AO3)for uploading in system
5) RTC (real time clock) defective, abnormal reading cases separated from ASCII.
6) These cases send to testing section for testing and obtaining the bill point reading.
7) ASCII is uploaded in the OLCC system and exception is generated on daily basis.
8) In the exception MD shoot up cases to be cleared before clearing diff type of
exception.
9) Different type Exception codes are generated in system.
a) High/Low (70%avg consumption high/low).
b) ToD mismatch (differ by 3 units).
c) Reverse rdg (current rdg is less than previous rdg)
10) These exceptions are cleared by checking the consumption history and transaction of
meters.
11) After clearing the exception the cases are save in the OLCC system for billing.
12) MRBC(T) are also giving report of cases such are 'NOT NO BOARD, KEY NOT
AVAILABLE, NO BRANCH CUT OUT, NO DISPLAY NO MRI, NO MRI' where readings are
not possible through CMRI.
13) NDNM cases are forwarded to testing section for testing and obtaining the bill point
reading.
14) Bill point reading of NDNM, RTC and NOB cases are obtained from testing section.
ASCII of these cases are prepared with their codes and uploaded in the OLCC.
15) Exception are generated of these cases which are cleared and saved for billing.
16) Manual entry are done for' NO BRANCH CUT OUT, NO MRI and KEY NOT AVAILABLE'
cases. Cleared the exception of these cases and saved for billing.
17) After clearing all the pending cases list, e-mail send to IT dept for further bill printing
process.
18) To take reading of NET METERS( cy 35) along with cy 19 & cy 24
18.1 ) To process the data to prepare ASCII and forward the same to Testing section for
manual billing
19) At the time of exception, cases where ToD register not open, wrong tariff, wrong
initial reading punched, mail sent to respective CC wards and follow up.
20) To visit sites for investigation in special cases
21) Give concurrence to Meters dept. regarding display parameter, Bill data on BCS
software and ASCII of new meters at the time of sample testing.
22) Preparation of ASCII, bill format, exception criteria etc for new concept introduce in
MERC Regulation (example Net Meter).
23) Checking of CMRI reading software of new meters at the time of sample testing.
24) To forward comments and suggestion to Meters dept. at the time of preparing meter
specification.
25) Checking of abnormal cases generated by IT dept.
26) Follow up with the meter manufacturer regarding meter ASCII, display parameter, BCS
software, instantaneous and tamper data programme, CMRI uploading software etc.
for new meters.
27) Other activities
27.1) Forwarding cases to various sections for amendment as well as high/low consumption
observed during exception.
27.2) Arranging for site visit for key not available & other cases reported by meter reader.
To inform such case to wards for follow up also
27.3) Inform the direct supply cases of south/ north zone to vigilance dept. as reported by
MRT.
27.4) MRU transaction to update or change MRU no. As and when required
27.5) Arrangement for vehicles for monthly maintenance etc. co-ordination with MV
Anik. 27.6) Generation of various reports as and when required.
27.7) Preparation of Annex-I (meter not on site) & Annex-II (unbilled meters).Annex III(
Electronic meter on conventional cycle) and forward the same to every CC ward
27.8) Preparation of MD Above 20 kw list for tariff code 3,5,44 etc. And after analysing the
data to forward the cases to all CC wards for proper action
27.9) Preparation of SOP data.
27.10) To allocate the MRU nos. of new meters (installed by CC wards) to all 9 CC depts.
through email.
27.11) To allocate the new meters (installed by CC wards) to MRT for reading purpose.
27.12) To generate Instapara and Tamper data and forward the to testing section for further
action.
27.13) To prepare and update the Eunit on daily basis for checking and clearing the
exceptions.
The Sections looking after billing complaints, testing of electronic meters etc. The section is
responsible for about 4100 nos. testing of LVCTO meters. The testing of LVCTO meter as per
reader’s complaint, High Bill complaints, LVCTO meters whose consumption is found Nil/Low/High,
Instapara list forwarded by reading section etc and thereafter with the help of results declaring
LVCTO whether meter defective or not.
A. Attending to consumer’s complaints in respect of High Bill, NDNM, RTC, Nil/Low cases,
Vigilance Cases and Insta-para etc.
B. Routine site investigations/testing of meters.
C. Submitting of amendment proposals in case of meters found defective.
D. Replying to consumers for all complaints.
Complaints received for Testing of LVCTO Meter:-
1) Letter or E-mail or telephonic message received.
2) For testing of LVCTO meter Accucheck (RSM) is required along with CMRI which is associated
with complete tool bag including Tong Tester.
3) Closing of cases: To put up defective meter cases for verification of Audit and closing after
approval.
2. Priorities are set for defective meter replacement so that maximum revenue can be collected
by amending the consumers.
3. Serving necessary request letters and notices to consumers if they are not allowing
replacement of defective meters.
4. Preparation of notes for correspondence with various departments and outside parties.
5. To carry out site visit in case of difficulties of replacement of defective meters, Ring to
Compact CT replacement etc.
6. Preparation of Budgetary requirement of various materials of Installation Section and giving
actual expenditure whenever required.
7. Procurement of LVCT Banks required for LVCTO meters.
8. To give annual requirement of LV metering CT banks to Materials Management Department
along with Tender specifications and drawings.
9. To approve drawings submitted by the manufacturer of LV metering CT banks before
manufacture of proto type.
10. To ensure availability of sufficient stock of metering LVCT banks at Kussara Stores and to
plan activities as per availability of stock.
11. Responding to Audit queries and queries related to other dept.
12. Clearance of Inspection Memos of LV metering CT banks by observing the results of MTS
dept.
Transaction- After getting final reading from testing section all details such as 10 readings of old as
well as new meter along with requisite details of the meters are inserted in OLCCS for the proper
billing to consumer.
3) The Meter Inspector carries following activities on site for the replacement of defective meter
a) Shut down the supply of consumer,
b) To Pull out the cutouts.
c) To remove the old meter.
d) If necessary, fabrication of bur bar/cables is carried out.
e) To fit of new meter.
g) To fit cutout.
h) To check the supply on meter as well as cutout.
j) To take all his readings (10 reading of old as well as new meter along with the meter’s
details).
k) To fill in installation papers, undertaking of consumer and load list. All these copies shall
give to consumers.
l) The safety measures are to be taken while carrying job of meter replacement.
4) To fill in installation papers, undertaking of consumer and load list. All these papers submit to
the office for the concern transaction.
VI) Amendment Section
The section is headed by Assistant Engineer who looked after the job of amendment of all
cumulative billing cases. The section has about 650 nos of pending amendment cases. The section
has 1 no. Dy.Engr.,1 no. T-8, 1 no. Office Asst.,1no., and 3 nos. Supervisors.
Source : Amendment cases arises due to following -
1) Transaction generated in OLCCS system for all the Wards.
a) Extension / reduction of load
b) Meter replacement
2) Wrong power factor
3) Wrong maximum demand
4) Tariff difference
5) Reading Section of HVC (exception of cycle 19 & 24)
6) Consumer complaints
Activities-
1) Extracting / downloading the data from the OLCC system & Other Wards in each month.
2) Maintaining record of cumulative billing cases.
3) Maintain record of removed / replaced installed meters from different Wards, IF section.
4) Dumping for billing parameters and ASCII from Reading section in each month for the collected
amendment cases.
5) Scrutinizing of transaction cases which are downloaded in that particular month.
6) Preparation of set of document (connection order, MRA, ASCII, bills & others) of Cr/Dr of
cumulative cases.
7) The case is studied and debit parts is worked out & the bills which gets generated in system
during the debit period are taken in credit part i.e. (Already issued to consumer and paid by
him).
8) The amendment file is prepared with all the above relevant documents like connection order,
MRA, ASCII, bills &Dr/Cr work out.
9) The amendment sheet is signed by concern clerk and then it is checked by AAOHVC & AOHVC.
It is forwarded to Dy.Engr. & AEHVC for scrutiny / checking & signature.
10) After signature of AEHVC-6, the ID for the case is prepared in OLCC system & forwarded to
Audit. The hard copy i.e. amendment file after signature of DEHVC is forwarded to audit for
scrutiny.
11) After scrutinizing of Audit and approval of DE(HVC) the transaction is generated in OLCCS
system for net debit / credit in consumer account and intimation letter is generated for the
same.
2. Testing of accuracy of metering system i.e. Meter, CT and PT periodically. Daily checking
meter status from the application. Testing of meter in case it is suspected to be defective.
3. Installation , Replacement and Removal of Meters, CT and PT jobs are to be scheduled and
carried out by coordinating with concerned O&M. Erection or Construction department.
4. After preventive or breakdown maintenance job at DSS as well as at RSS where there is
possibility of metering system getting disturbed , it is to be checked for getting correct
data.
5. Scrapping of defective metering system by taking the approval of concerned authority.
□ General Activities
□ Authorizing Debit/Credit adjustments in OLCCS.
□ To co-ordinate with Accounts and Audit Department regarding queries about reconciliation of
various accounts related to Customer Care Dept.
□ Maintaining records of Electricity bill payment and Journal Entries.
□ To monitor and control reconciliation work on yearly basis.
□ Filing Income Tax return on electricity bill security deposits.
□ Issuing TDS Certificate.
□ Submitting various statements and to assist higher authorities regarding Statistical data to be
provided to different authorities.
□ Preparing Administrative reports.
□ NET BANKING
□ Checking of payment received through Net Banking via debit/credit cards and through
internet banking with the reports from HDFC Bank and Tech Process Services Ltd.
(payment gateway for Net payment).
□ Downloading Reports from Dashboard of HDFC Bank & Tech Process for reconciliation.
Insertion of dropdown payment entries in OLCCS.
□ Refund to consumer in case of Double payment through Dashboard of HDFC
& Tech Process & Debit Adjustments in case of Chargeback.
□ Passing necessary Journal Entries. Preparing Commission voucher.
□ Monthly Collection report.
□ Insertion of payment transactions not accounted in OLCCS.
□ ECS
□ Punching of ECS Mandate form in OLCCS.
□ Forwarding Uploadable ECS debit file to Canara Bank Clearing Section through Email and
sending Mandate of ECS uploadable file to Canara Bank Colaba Branch manually.
□ Sending Processed ECS file received from Canara Bank Clearing Section to OLCCS through
email.
□ Reconciliation with Canara Bank and Cash Department.
□ Preparing necessary Journal Entries &advise to Cash Department.
□ COLLECTING BANKS
□ Based on Daily MIS provided by collecting bank, to maintain our Bank Register on day to
day basis. To update the weekly collection by taking cumulative total of the amount
collected.
□ Posting of RTGS/NEFT weekly collection and Dishonour Cheque in register.
□ Reconciliation with Funds received in Canara Bank.
□ Debit/Credit Adjustments in OLCCS.
□ Preparation of Monthly Journal Entry & Commission bill.
□ NEFT/RTGS (Citi Bank)
Checking mail from consumers for providing procedure of NEFT/RTGS payment to pay
electricity bills.
Checking mails from Citi Bank regarding Daily payment received and valid/Invalid
payment report.
Reconciliation with funds received in Canara Bank.
Sending consumer data file for Group billing validation process at Citi Bank.
Follow up for details file regarding Group bill payment received from consumer.
Preparing uploadable flat file in system required format.
Passing necessary Journal Entries.
□ MiBEST Mobile app, Online payment and Customer Care web portal and Paytm
□ Checking of daily MIS in OLCCS.
□ Attending Queries of consumers on PAYTM dashboard.
□ Reconciliation with funds received in Canara Bank.
□ Passing necessary Journal Entries and preparing commission voucher.
□ Money on Mobile
□ Checking of daily MIS in OLCCS.
□ Reconciliation with funds received in Canara Bank.
□ Passing necessary Journal Entries and preparing commission voucher.
□ Suspense
□ Suspense Payments cheking.
· Checking of Suspense Report in OLCCS and taking entries in Suspense Register.
· Posting of suspense payments to correct consumer number in OLCCS.
· Insertion of Debit/Credit note through workflow and Closing of Proclaim payments
in suspense register.
□ Income Tax on Consumer’s Security Deposit.
· Checking of Reports provided by OLCCS system officer.
· Verification of report with Adjustments under code 39 & 79 and current consumers
and ex-consumers.
· Checking of exempted consumers.
· Return file. Issuing TDS Certificates & passing necessary Journal Entries.
□ Post Office
□ Checking of daily summary in OLCCS.
□ Punching &dispatch of cheques received from three Head Post offices.
□ Reconciliation with collection of post office with IndusInd Bank.
□ Checking emails and reports from Post Offices.
□ Debit/Credit adjustments in OLCCS.
□ Passing necessary Journal Entries.
□ Checking of Stubs received with summary received from Post office.
□ Dispatch of Stub lots to EDP Backbay for punching and processing
□ M.TAX/E.D.
□ Monthly compilation and computation of Billing Summary, Cycle wise Billing Summary,
Electric Duty Summary, Tax on Sale Summary etc. of Ordinary A/c (Cy. 01 to 34) and
adjustments if any.
□ Compilation of Category wise/Slab wise Tariff, FA Statement, FC/MD Ch. etc.
Maharashtra Tax Charges Statement, Sundry (Others) Receipts etc.
□ Compilation of Dr./Cr. Note and other Adjustment code Summary of (S + N) Zone.
□ Compilation of monthly Revenue Statement and FA Statement.
□ Preparation of monthly Journal Entry of Electric Supply Receipts, monthly Discount
Journal Entry and Sale Report.
Meter Department
Meter Management:
The meter management module shall be integrated with CM, CRM and RM modules.
Features:
□ Meter Management (MM) Module to track the physical movement of energy meter right from
purchasing of the meter to scraping of meter.
□ Test results of each meter shall also be recorded.
□ “Meter Purchase” sub module:
1) Meter Tender.
2) Meter Purchase Order.
3) Meter Inspection Memo.
4) Meter Store Requisition
1) Meter Tender
□ Information regarding the tender of meter is to be captured.
□ The field “Tender No” and “Tender Quantity” are Key fields.
□ If any purchase order is amended the amended quantity i.e. addition or deletion of meters is
to be added or subtracted from the original quantity of tender. This is essential because when
the Purchase order is amended Tender is not amended.
□ Purchase Order no is to be selected from field “Purchase Order No” for updating the
Information regarding the Inspection Memo of meter.
□ The field “Inspection Memo No” is a Key field.
□ Meter removed from the installation by CC wards is credited to the sub store.
□ Sub store then send these meters to Meters department and meters department will have to
receive these meters. The movement of meters shall be recorded in the system
B) Meter Serialization
□ Inspection memo no is to be selected from the field “IM NO” for updating Particulars of
meters.
□ Drop down list to be provided for most of the fields to avoid updation errors.
□ All fields to be mandatory in this page.
□ Quantity of meters serialized shall be summed and checked against the IM quantity
automatically.
□ All the meters in one IM are having same particulars hence mass uploading facility to be
provided. Select “IM No” and just fill up the particulars of meter at first sr. no., enter no of
meters in the IM in the field provided and click button “Generate serial no in mass”.
□ The system shall automatically generate the serial numbers for rest of the meters. Records
with same particulars to be generated for as many meters nos. as entered.
□ In “BEST Meter No” drop down to be provided in which the non serialized old conventional
meters received in the Meters department through the system will be available for
serialization.
□ Meter test data in MS-Excel format can be uploaded in the system. Three types of uploads to
be provided:-
I) Meter Test Result.
II) Meter Dial Test Result.
III) Meter Test Details.
D) Meter Testing
□ Meter Testing page is an important page which shall be provided where all testing details,
test results, etc. can be entered and saved.
E) Standby Meter
□ When the meter is inserted in the testing page it also appears in the standby meter page to
take the further action on the meter.
□ Actions like sent to manufacturer, received from manufacturer, sent for sealing, sent for
scrapping or kept stand by in department shall be captured in the system.
□ Multiple choice of the meter shall be provided to initiate similar action on the multiple meters.
F) Meter Dispatch
□ Meter no is to be selected and details such as dispatch date, sub store where to dispatch shall
be entered in this page.
□ Mass uploading facility is also to be provided for this functionality.
□ Meter reading details to be populated automatically for the selected meter.
G) Meter Seal
□ Meter no is to be selected and details such as seal nos., seal date, etc to be entered in this
page.
□ Mass uploading facility also to be provided for this page. Meter reading details are populated
automatically for the selected meter.
H) Meter Booking
□ When the meters are dispatched to a particular sub store, these meters will be made
available for booking in workflow of CM and CRM module.
□ They will get the list of the meter nos. according to the selection of size and sub store.
□ This page shall be used by the IF section of CC wards and the other departments where
meter booking activity is carried out.
I) Meter Scrap
□ Meter can be scraped from this page provided the meter is to be routed through the stand by
page by taking the standby action “sent for scrapping”.
□ Provision of scrapping of 400 nos. of single phase meters and 200 nos. of three phase
meters in each batch shall be provided.
□ The meters will be counted automatically.
J) Store Details
K) Meter Vendor
□ Information regarding the vendors is to be entered for quick reference.
Mentioned below are the detailed activities performed by the Meter Department of BEST.
□ Testing Section:
□ Procurement of Static Single phase, Poly phase, CT operated, CTPT Operated Energy Meters
for New Connection and Replacement as per the requirements of Customer Care
Departments, and to ensure that sufficient meter stock is always maintained.
□ To study the different new technologies available in Meters and to prepare the specifications
for all types of meters.
□ To attend the seminars, trainings, conferences related with the Meters technology.
□ Procurement of Single phase and Poly phase Prepayment meters.
□ Procurement of Dual Source Energy meters for Solar Energy Metering.
□ Procurement of Reference Standard Meter and Meter Test Bench.
□ Maintenance of Meter test bench.
For carrying out above activities we have team of one Asst. Engineer, Two Dy. Engineers, one
Charge Engineer. For procurement we have laid down procedure in which as per the requirement of
User Department or by considering earlier consumption pattern of utilization of meters the budget
provision is made and accordingly the administrative sanction of Competent Authority i.e. G.M. is
obtained. After this proposal is sent along with specifications to M.M. Dept. for advertising the
tender. The tender sample meter testing, demonstration, features verification and confirmation of
tender sample submitted with specification etc. is carried out. Generally minimum 3 to 4 working
days are required to each tenderer thereafter the technical suitability report is prepared. For
preparation, uploading of all documents in E-office it will take minimum 5 working days.
After Auditing all the E-files and opening of commercial bid, minimum 5 working days are required
for recommendation in E-office. After Auditing all the E-files committee note is prepared by MM Dept.
and forwarded to Meters Dept. for verification. It takes minimum of 4 working days to scrutinize
the same.
The proposal for Lot Inspections and related activities are initiated and carried out.
□ Testing of New Meters, Meters from site, Lab Meters, Vigilance and Official Testing of Meters
in presence of consumer as per the relevant standards of IS.
To carry out the above activities we have 5 nos. of single phase Fully Automatic Test Benches
(FATBs), 3 nos. of Poly-phase FATBs and 6 nos. of Semi-automatic Test Benches. Many of the
position / slot / testing jack of the semi- automatic test benches are not in working condition hence
proposal for procurement of FATBs is initiated. With this following is the standard testing output.
a. Daily standard output of new meters 600 nos. single phase.
b. Daily standard output of new meters 90 nos. poly-phase.
c. Daily standard output of lab test 100 nos. single phase.
d. Daily standard output of lab test 30 nos. poly-phase.
e. Daily standard output of O.T. 40 nos. single / poly phase.
f. The average monthly incoming meters from all wards for carrying out lab test / O.T. /
Vigilance O.T. etc. is around 6000 nos. of meters.
By comparing the daily output and the incoming flow there is pendency of near about 2 to 3
thousand meters every month and will accumulate the pendency. To carry out this activity we have
one Dy. Engineer and eight Charge Engineers and ten nos. of Asst. Foreman. The Charge Engineers
are working of FATBs and Asst. Foreman are working of SATBs. The output of Asst. Foreman are as
per work study and is 4 meters per day.
□ Repairs Section:
□ The tested OK meters are sealed and stenciled and made ready for issue to the User
department. The daily output of sealing and stenciling is 100 nos. of single phase and 60
nos. of poly-phase meters per person respectively.
□ The defective meters within the guarantee period are sent to the firm for repair/replacement,
while the meters whose guarantee period is finished are scrapped. All these defective meters
are required to be segregated, listing has to be prepared, correspondence with the
Manufacturer and other department like M.M. is required to be done.
□ Routine Calibration of RSM of test benches from NABL Accredited Laboratories. The proposal
for administrative sanction and all related activities is to be completed within specified
duration.
□ Routine updation of all records related to procurement, testing, issuing, sealing etc. are done
in Meter management.
□ Routine maintenance and repairs of Wall clocks, antique clocks at GM’s residence, Electric
House, BEST Bhavan, BEST Museum etc. every alternate day a visit of Departments staff is
required for priming the spring of clocks manually.
□ Routine maintenance and repairs of Instruments such as Tong- tester, Multi-meter etc.
The Repairs section is headed by Asst. Engineer and assisted by one Dy. Engineer, Sub-Engineer &
Charge Engineer respectively. These activities are carried with the help of following staff viz. 2 nos.
of Foreman General (T-8), 3 nos. Shop Recorders, and other 28 nos. of various categories of staff.
Activities under this section are mainly of laborious nature, the main critical, tedious and time
consuming activity is of scrapping of old meters. For scrapping of these meters there is a program
developed by our EDP Department. The main hurdle while using program is of updation of old
meters because in earlier years this data was not fed, wrong entries’ were made etc. and for the
scrap value department like Audit and Accounts insist that data should be in order resulting in huge
labour work and consumes lots of time. Earlier every week only 400 nos. of meters were scrapped
now we have increased this and tried to achieve the target of 1000 meters per day.
Regulatory Department
The Regulatory Department deals with the Regulatory matters involving co-ordination / liaison
work with Maharashtra Electricity Regulatory Commission (MERC) and studying the various
regulations issued by the Commission vis-à-vis their implications on the Undertaking, filing of
various types of petitions, e.g. Tariff Petitions, Business Plan, MYT Petition, ARR, True up,
submission of various data required by Commission and other statutory authorities, reporting the
status of the compliances of directives of Commission, and other work as per the directives of
Hon’ble Commission, dealing with the various issues related with ATE / Supreme court, CERC / CEA,
etc., Attending the Public hearing, meetings. As per the directives of Commission, ensure uploading
of public notices, Orders on BEST’s website. Also coordinate with public relation department of
Undertaking for timely publishing of public notices in newspapers as per directives of
Commission, arranging for appointing of Consultants to the BEST, Reporting the monthly MIS,
preparing & submitting of the Budget.
□ Activities -
□ Preparation of various petitions to be filed with MERC e.g. Tariff Petitions, Business Plan, MYT
Petition, ARR, True up, submission of various data required by Commission and other
statutory authorities,
□ Coordinating with various departments of BEST Undertaking for timely submission of
information to the Commission as per MERC's guidelines / directives.
□ Dealing with queries /information sought by MERC & preparing replies of the same.
□ Awarding MYT, MTR and other assignments to the Retainer Consultant after obtaining BEST
Committee's approval and to arrange to make payment to Retainer Consultants on
completion of stipulated jobs.
□ Payment - Annual Licence Fees& other Statutory Fees while filing of various petitions payable
to MERC.
□ Budget - To prepare the Budget estimates – Sale & Purchase of Energy
□ To prepare the proposal of Revenue Budget & Capital Budget of the department.
To prepare Budget regarding publishing Advertisement
□ Payment of Bills - Processing of bill received from Retainer Consultant regarding assignment
awarded to them for its payment.
□ To inform Management about various petitions, Orders of the Commission and other
important regulatory matters through Monthly Information System (MIS).
□ Forwarding data of Reliability Indices (SOP) to MERC & CEA as received from O & M Division
after the approval of DGMES / GM
□ To deal with regulatory issues of the Undertaking related to MERC.
□ Attending meetings with MERC on various issues such as Tariff proposal, Schedule of Charges
& other issues related with Electricity Business.
□ Offering views / comments on the various Draft Regulations formulated by MERC /CERC, &
Central Electricity Authority.
□ To offer para-wise comments on the submissions made in various proceedings wherever
BEST is impleaded as respondent. Assisting Legal Department on technical issues for appeals
in Appellate Tribunal & various Courts.
□ Scrutiny of the Orders given by the Commission related with various issues and take
appropriate actions.
□ Reporting various Orders of the Hon’ble Commission to Management & BEST Committee.
□ Preparing CD’s of petition as per the directives of MERC for selling it to the General Public
□ To download various Orders/judgment of MERC, CERC, ATE, Supreme Court.
□ To keep the records of various Orders, Regulations, Notifications, Acts, Rules, National Tariff
Policies, National Electricity Policies, Press release, Record of Proceedings, important
documents issued by MERC, CERC, CEA, ATE, Supreme Court, Govt. of Maharashtra.
□ Submission of various information sought by Government of Maharashtra (Starred, Unstarred
Questions, etc).
□ RTI - The Deputy Chief Engineer (Regulatory) is Public Information Officer related to
regulatory matters of the Undertaking. As such, he replies to the RTI applications received
regarding regulatory matters.
□ Quarterly Statement - To inform Commission regarding publishing of 'Consumer Right
Statement' regarding publishing the same in two English & Marathi news paper on quarterly
basis.
□ Following reports are required by Regulatory Cell for submission to MERC along
with MYT/MTR Petitions. -
□ Balance Sheet
□ Profit and Loss Account
□ Cash Flow statement
□ Share capital
□ Reserves and Surplus
□ Long term borrowings - Secured loans
□ Long term borrowings - Unsecured loans
□ Other Long Term Liabilities
□ Short Term Borrowings
□ Other Current Liabilities
□ Short Term Provisions
□ Tangible Assets
□ Capital Work in Progress
□ Long Term Loans & Advances
□ Other Non Current Assets
□ Inventories
□ Trade receivables
□ Cash & Cash equivalents
□ Short Term Loans & Advances
□ Details of short term loans and advances
□ Other Current Assets
□ Revenue from Operations, Other Income, Non-Tariff Income, Others
□ Cost of Power Purchase
□ Employee benefits expenses
□ Finance Costs, Depreciation & Amortization Expenses
□ Repair &Maintenance Expenses
□ Administration & General Expenses, Administration & General Expenses - Details of
remuneration to Statutory Auditors (excluding Service Tax)
□ Other Debits, Tax Expense - Income Tax/Deferred Tax
□ Prior Period Items
□ MYT/Mid Term Review Petition Formats - Distribution Wires and Retail Supply –
□ Customer Sales Forecast
□ Wheeling Forecast
□ Voltage wise Sales
□ Distribution Losses
□ Energy Balance
□ Demand & Supply Position
□ Power Purchase Expenses
□ Power Procurement Quantum
□ Intra-State Transmission Charges and MSLDC Charges
□ Summary of Operations and Maintenance Expenses
□ O&M Expenses for FY x –x+1 and FY x+1 – x+2
□ O&M Expenses for nth Control Period
□ Employee Expenses
□ Administration & General Expenses
□ Repair & Maintenance Expenses
□ Summary of Capital Expenditure and Capitalization
□ Capital Expenditure Plan
□ Capitalization Plan
□ Capital Work-in-progress - Project-wise details
□ Assets & Depreciation (Distribution Wires + Retail Supply Business)
□ Assets & Depreciation (Distribution Wires Business)
□ Assets & Depreciation (Retail Supply Business)
□ Interest on Loan Capital
□ Interest on Working Capital and Interest on Consumer Security Deposit
□ Return on Regulatory Equity Capital
□ Non-Tariff Income
□ Provision for bad and doubtful debts
□ Contribution to Contingency Reserves
□ Income Tax
□ Revenue from Sale of Electricity for FY x+1 – x+2 and FY x+2 – x+3
□ Expected Revenue at existing Tariff for FY x+3 – x+4
□ Expected Revenue at existing Tariff for FY x+4 – x+5
□ Expected Revenue at existing Tariff for FY x+5 – x+6
□ Expected Revenue at proposed Tariff for FY x+4 – x+5
□ Expected Revenue at proposed Tariff for FY x+5 – x+6
□ Cross-subsidy Trajectory
□ Billing Efficiency and Collection Efficiency
□ Trajectory for Billing Efficiency and Collection Efficiency
□ Payment Efficiency
□ Rebate given to Consumer Category
□ Truing-Up Summary - FY x+1 – x+2 and FY x+2 – x+3
□ ARR Summary for FY to FY
□ Other Expenses
□ Returns on interest on internal fund
□ Revenue Gap /Surplus
□ Vigilance Raid details received from Vigilance Dept by email / manually on the day of Raid.
□ Details of the vigilance raid received in Rev. Comm-I Dept handed over to respective
Assessing Officer
□ Shop-recorder maintains the record of Vigilance Raid cases.
□ Claims of Vigilance raid cases are prepared by Assessing Officer with the help Deputy
Engineer and forwarded to Vigilance Dept. by email/dispatch
□ Green Files are prepared with all relevant raid documents, photographs by Vigilance (South &
North) Dept and are forwarded to Review Committee-I
□ Claims are reviewed by Assessing Officer on the basis of evidences/ contentions given by
consumers and kept in front of Review Committee for approval after checking of Legal
Representative. Files are audited and given to Assessing Officer to prepare final assessment
letter. With the help of DyE final assessment letters are prepared and issued to consumers by
Registered A.D. post by Hand delivery to Vigilance Dept.
Vigilance Department:
Vigilance (E.S.) Dept. is responsible for detecting theft of electricity and taking action against the
person indulged in it. There are two different departments viz. Vigilance (E.S.) South Dept. and
Vigilance (ES) North Dept. having different area of operation.
Broadly the electrical theft can be classified into 3 categories viz. Direct Supply, Tampering of
Meter and Unauthorized use of electricity.
□ Taking Direct Supply: Consumers indulged in taking direct supply bypassing the meter
come in this category. Here the culprit can have his own meter but he is using direct supply
with the help of change over switch or the culprit is not our registered consumer or consumer
who’s meter is removed for non-payment but taking the direct supply from external source
without metering.
In this case, we issue a provisional bill to the consumer (which is calculated by Assessing
Officer of the Review Committee) and lodge a police complaint (F.I.R.) u/s 135 in the
concerned police station. In these cases, the meter is removed and not connected back
unless consumer pays 50% of the amount of provisional bill and give the undertaking to pay
the remaining amount after deciding final assessment bill. The final assessment bill is
prepared by Review Committee considering the site condition reported by the department,
consumption pattern of the consumer and the contention letter given by the culprit. The final
assessed bill is also subjected to be revised by the Review Committee in certain conditions. It
also be revised by LokAdalat or by the Court Order. In this case when the meter is physically
removed by Vigilance (E.S.) Dept., the meter is removed from the billing system and ID
remains pending with Vigilance (ES) Dept. till the time the consumer makes certain minimum
payment. His meter cannot be reconnected as the ID is kept pending with Vigilance (E.S.)
Dept. After the necessary payment Vigilance (E.S.) Dept. initiate SM for IF Dept. to install a
new meter in place of the removed meter. In case, consumer delays making the payment by
substantial period, a provision should be made for allowing “remove the meter from the
system.”
□ Tampered Meter: In this case, meter is tampered by the consumer to manipulate the
consumption. In this case, provisional claim prepared by the Assessing Officer of Review
Committee is given to the consumer and F.I.R. is lodged u/s 135 with the nearby police
station. In these cases, meter is also removed and new meter is installed only if consumer
pays half of the provisional claim amount. The provisional claim amount is then revised by
the Review Committee and issued final assessed claim to the consumer. The remaining
amount is not paid by the consumer, the meter is disconnected again till the consumer pays
the total claim amount. The said final claim is subject to re-revision by the Review
Committee in specific cases or can also be revised by LokAdalat or by a Court Order.
In few of the cases, the meters removed from the site for other reasons are found tampered
in the laboratory. Such cases are also to be included in this category.
□ Unauthorized use of electric supply: Many a times, during raid it is observed that the
consumer is utilizing the supply for the purpose other than sanctioned tariff viz. the
residential supply is used for commercial purpose thereby causing revenue loss to the
undertaking. Such consumers are given provisional claim amount under section 126
(prepared by Assessing Officer of Review Committee). In this case, the provisional claims are
issued to the consumers after a certain time and therefore the consumer is not disconnected.
On the contention of the consumer, the provisional claims are subject to revision by the
Assessing Officer. It is also subject to change by the order of Electrical Inspector or Court. If
consumer fails to make the payment of the final claim his meter is disconnected till he makes
the payment. In addition to this, the cases detected where the consumer is unintentionally
using direct supply like Ganpati/ Navratri festivals, marriage function are also treated in this
category.
In all the above cases, provision should be made in the billing system to accommodate the
procedure adopted by Vigilance (E.S.) Dept.
In addition to the above requirement, Vigilance (E.S.) Dept. desires to have provision for the
following -
a) To put the entire data of pending vigilance claims in the main billing system with a
provision to regularly update the data.
The data has to be uploaded one time in the billing system so that it is visible to all the
Customer Care Dept. It is essential while sanctioning requisitions/ change of name of the
consumers as the Customer Care Dept. are supposed to not to sanction the requisitions in
case of pending vigilance claims. The Customer Care Depts. therefore, need to be shown the
pending vigilance claims against service numbers and account nos. whereas the Vigilance (ES)
Dept. requires to see the data also as per vigilance case number.
b) To update payment made by the culprits time to time against each claim (multiple
entries).
The payment against vigilance claims are many times done in installments. All such payments
should be reflected against each vigilance claim so that Vigilance (E.S.) Dept. and Customer
Care Dept. can at any point of time know the remaining amount to be paid by the consumer.
A provision should also be made such that if the consumer makes payment of the entire claim
amount, the case should not be reflected in the pending vigilance claims which are displayed
on the screen of Customer Care Dept. All such paid up cases should however remain in the
data and should be visible to Vigilance (E.S.) Dept.
c) Passing of Journal Entries (JEs) for the payment made by the consumer
After payment of entire claim amount & compounding charges, the case is said to be closed
subject to passing of JE (Journal Entry) to account the payments made against the vigilance
cases. This is routed through Audit & Accounts Department. After passing of JE, the case is
closed. Similarly recovered compounding charges are also required to be accounted
separately against each claim the amount is deposited to Govt.
Process flow:
1. Requisition for electric supply either for load extension or new connection is registered in the
respective Wards of the Customer Care Departments.
2. Customer Care Department can release requisitioned load up to 150kW, they increase the
cable size, or increases the load. However, the cases where network condition is stringent are
referred to Planning Network Department for further clearance.
3. If the requisitioned load is more than 150kW then, Customer Care Department forwards the
load requirement to Planning Network department for clearance. The Planning department
provides the Technical Clearance as per the network condition.
4. If the load requirement can be met/released from the existing network setup, then the
Planning Network department gives the technical clearance to release the load.
5. If requisitioned load can be released by LV/HV network strengthening scheme, the same
remark is put on the Technical Clearance and then LV/HV network strengthening scheme is
prepared with the help of Drawing Section team which includes:
□ List of work
□ Revision of plans (S/PL, L/PL, M/PL).
□ Cost estimate.
□ Bill of material.
6. The proposal is sent for comments/suggestion to Operation and Maintenance department.
7. Operation and Maintenance department gives comments/suggestion to be added/deleted in
the proposal and the same is forwarded to Planning Department after necessary CEM
approval.
1. AAOW- Initiates R.I.Bill voucher against demand note received from Dy.Engineer.
2. AOW - Approves bill voucher and forwards it to DCEW for certification.
3. DCEW - After certification, forwards bill voucher through Dy.CAO(RC) to Audit , Cash
department &chowkey Dy. E for further necessary action.
4. AOW - Allots funds and forwards transaction details to concern Dy.Engineer towards
trench application recommended by Dy.Engineer and verified by Audit Dept.
5. AOW - Certifies Journal Entry bills approved by concern Divisional Engineer and forwards
to Audit Dept. for verification.
6. Posting of refund amount if any from MCGM against paid transaction.
1. Deputy Engineer :
Chowkey Dy. E collects demand notes from MCGM & for to DCEW's Office for preparation
of bill voucher
2. AAO / Supervisor DCEW's Office :
initiates bill voucher & forward to AOW for approval
3. AO DCEW’s Office :
approves bill voucher & forwards to DCEW for certification
4. DCEW :
certifies bill voucher & forwards to Accounts Dept.
5. Accounts Dy. CAO(RC ):
recommends bill voucher & forwards to Audit Clerk
6. Audit Clerk :
recommends bill voucher for audit
7. Audit Officer :
checks / audit bill voucher
8. Audit Oficer :
approves & forwards audited bill voucher to concerned Dy.E
9. Deputy Engineer :
recommends payment to E-Wallet & forwards bill voucher to Cash dept.
10. Cash Dept :
Transfers funds to e-Wallet & informs to Dy.E
11. Deputy Engineer :
forwards payment advice intimation to AOW
12. AOW DCEW’s Office :
allots fund to application as recommended by Dy.E&sents transaction details of payment
to Dy.E for prepartion of Jes.
13. Deputy Engineer :
advice for JE preparation to concern Administrative Officer
14. AAO ( Erections , Const. & O & M Depts) :
prepares JE bills & forwards to Divisional Engineer for approval
15. Divisional Engineer :
approves JE & forwards to AOW for certification
16. AOW DCEW’s Office :
Certifies JE & forward to Audit Clerk for verification
17. Audit Clerk / Officer :
verifies JE bill voucher & forwards to Accounts Dept .
18. Accounts Dept :
Update JE in books of Accounts & close workflow
Erection Department
3. The Erection Department shall be able to print work order and work order sketch through
system.
4. After execution of work order Erection Department shall fill up the Work Completion
Report and forward the same to concerned Customer Care Department through system.
5. Erection Department shall able to generate the work completion and pendency reports
through system.
Under the Franchisee, Group of consumers in particular building complex where electric supply is
connected through H.T supply where as metered supply is distributed to downstream consumers by
the Franchisee who is maintaining the distribution network, Meter reading, Bill distribution and
collection. Whereas the Distribution licensee processes the individual meter connection, Extension /
Reduction of load, Reconnection of meter etc through the CM-Meter Related and Service Related
workflows for Franchisee Consumer.
O & M Department
Preventive and Breakdown maintenance Activities of O & M are captured in OLCCS in Maintenance
Activity Module of Asset Management. Off Supply complaints are registered in OLCCS under
Technical Complaints. Under Mobile Workforce Management, O&M users are using Mains Engineer
app for restoration of electric supply. O&M department is maintaining Load Sheets which is done in
AutoCAD.
□ LV LOAD SECTION
□ Asset Management :-
a) To prepare new asset of distr., services, teed services in asset management.
b) To give network to distr. Services, teed services in network Tree (OLCCS).
† Consumer can register complaints related to electricity supply interruptions and billing
complaints through IVRS based Call Center where calls are forwarded to fuse control centers
through the system with minimum latency.
† Second PRI line for the Call Center shall be provided as a fall back arrangement.
† Features
This Consortium Agreement executed on this ................ day of........................... Two Thousand
………………. By:
M/s. .....................................a Company incorporated under the laws of........................and having
its registered office at............................. (Hereinafter called the “Lead Member/First
Member” which expression shall include its successors);
And
The Lead Member/First Member, the Second Member and the Third Member shall collectively
hereinafter be called as the “Consortium Members” for the purpose of submitting a proposal
(hereinafter called as “Bid”) for the work of ………………………(Name of project) of BrihanMumbai
Electric Supply and Transport (BEST) (hereinafter called the “Owner”) in response to Request for
Proposal Document (hereinafter called as ”tender” Document) Dated………….. for the purposes of
submitting the bid no. ………….. …………………………..and entering into a contract in case of award for
the work of …… (Name of work)………………………
WHEREAS, the Owner invited bids vide its tender document no. …………………for the work
of…………AND WHEREAS as per document, Consortium bids will also be considered by the Owner
provided they meet the specific requirements in that regard.
AND WHEREAS the bid is being submitted to the Owner vide proposal dated ………… based on the
Consortium Agreement and the bid with its forms and submission documents, in accordance with the
requirement of tender conditions and requirements have been signed by all the partners and
submitted to the Owner.
AND WHEREAS Clause <> of tender document stipulates that a Consortium of maximum <3>
companies, meeting the requirements stipulated in the tender document may submit a Proposal
signed by Lead Member of the Consortium Members so as to legally bind all the Members of the
Consortium to the Owner and duly signed Consortium Agreement shall be attached to the
Proposal.
NOW THEREFORE, in consideration of the mutual covenants of the members of the Consortium, the
sufficiency whereof is hereby acknowledged and other good valuable consideration, we agree as
follows:
1. We the members in the Consortium hereby confirm that the name and style of the Consortium
shall be…………….. Consortium.
2. M/s. ......................................shall act as Lead Member for self, and for and on behalf of M/s
…………………….. (Second Member) and further declare and confirm that we shall jointly and
severally be bound unto the Owner for the successful performance of the obligations under the
Request for Proposal (tender) and resulting Contact Agreement(s) submitted / executed by the
Lead Member in the event of the selection of Consortium. Further, the Lead member is
authorized to incur liabilities and receive instructions for and on behalf of any or all partners of
the consortium.
3. In no case subsequent change in implementation agency shall be made. The composition or
the constitution of the consortium shall not be altered without the prior consent of the Owner.
4. The roles and responsibilities of the lead member and the second member of the consortium for
execution of various components/activities as defined in the tender document shall be as under:
hereby jointly and severally undertake to promptly make good such loss or damages caused to
BEST on its demand without any demur or contest. The Owner shall have the right to proceed
against anyone of the partners and it shall neither be necessary nor obligatory on the part of the
Owner to proceed against the Lead bidder before proceeding against or dealing with the other
Member.
9. The financial liability of the Consortium Members to the BEST, with respect to any of the claims
arising out of the performance or non-performance of obligations under the tender and the
resulting Agreement(s) shall not be limited so as to restrict or limit the liabilities of any of the
Members.
10. It is expressly agreed by the Members that all the due payments shall be made by the Owner to
lead member only.
11. This Consortium agreement shall be construed and interpreted in accordance with the laws of
India and the Courts of Mumbai shall have the exclusive jurisdiction in all matters arising there
under.
12. It is also hereby agreed that Lead Member shall, on behalf of the Consortium shall submit the
Bid and performance Security as specified by owner in the tender document.
13. It is further agreed that this Consortium Agreement shall be irrevocable and shall continue to be
enforceable till the same is discharged by BEST
14. This Agreement shall come into force as of the date of signing and shall continue in full force
and effect until the complete discharge of all obligations, concerning the carrying out of the
Project, which have been taken on by the Parties under the Contract, tender Document and
under this Agreement.
15. Any other terms and conditions not in contradiction to the tender and above mentioned terms
and conditions.
IN WITNESS WHEREOF, the Members to the Consortium agreement have through their
authorised representatives executed these presents and affixed common seal of their companies, on
the day, month and year first mentioned above.
Disclaimer
The information contained in this e-tender document or provided to Bidder(s), whether verbally or in
documentary or any other form, by or on behalf of the BrihanMumbai Electric Supply & Transport
Undertaking (BEST), hereafter also referred as “The BEST Authority “, or any of its employees or
advisors, is provided to Bidder(s) on the terms and conditions set out in this e-tender and such other
terms and conditions subject to which such information is provided.
This e-tender includes statements, which reflect various assumptions and assessments arrived at by
the BrihanMumbai Electric Supply & Transport Undertaking (BEST) in relation to the Project. Such
assumptions, assessments and statements do not purport to contain all the information that each
Bidder may require. This e-tender may not be appropriate for all persons, and it is not possible for
the BrihanMumbai Electric Supply & Transport Undertaking (BEST), its employees or advisors to
consider the investment objectives, financial situation and particular needs of each party who reads
or uses this e-tender. The assumptions, assessments, statements and information contained in this
e-tender may not be complete, accurate, adequate or correct. Each Bidder should therefore, conduct
its own investigations and analysis and should check the accuracy, adequacy, correctness, reliability
and completeness of the assumptions, assessments, statements and information contained in this e-
tender and obtain independent advice from appropriate sources.
Information provided in this e-tender to the Bidder(s) is on a wide range of matters, some of which
may depend upon intSAPretation of law. The information given is not intended to be an exhaustive
account of statutory requirements and should not be regarded as a complete or authoritative
statement of law. The BrihanMumbai Electric Supply & Transport Undertaking (BEST) accepts no
responsibility for the accuracy or otherwise for any intSAPretation or opinion on law expressed here.
The BrihanMumbai Electric Supply & Transport Undertaking (BEST), its employees and advisors make
no representation or warranty and shall have no liability to any person, including any Bidder or
Bidder, under any law, statute, rules or regulations or tort, principles of restitution or unjust
enrichment or otherwise for any loss, damages, cost or expense which may arise from or be incurred
or suffered on account of anything contained in this e-tender or otherwise, including the accuracy,
adequacy, correctness, completeness or reliability of the e-tender and any assessment, assumption,
statement or information contained therein or deemed to form part of this e-tender or arising in any
way with pre-qualification of Bidders for participation in the Bidding Process. The BrihanMumbai
Electric Supply & Transport Undertaking (BEST) also accepts no liability of any nature whether
resulting from negligence or otherwise howsoever caused arising from reliance of any Bidder.