| Title:- Engineering Standard for Paint & Primer applications | Prepared By, RV Singh, SR
on Fabricated components Kalia Vb fen
Signature
TECHNICAL REQUIREMENTS FOR FABRICATED COMPONENTS
WITH PRIMER COATING
PRIMER TO BE USE
QD PRIMER GREY No.445892
THINNER TO BE USED:- THINNER No. 821900
MAKE: _M/S BERGER PAINTS
SHOT BLASTING
1 Shot size 0.6-08mm
2 Duration of Shot Blasting 2.~3 minutes to remove scale
Primer application to be done immediatly or within four hours of shot blasting operation
Components to be dust free just before primer application
Viscosity to be maintained as per viscosity — temp chart provided by M/S Berger Paints
Drying time after primer application is 16 Hrs.
Compnents on which shot blasting can n ne following PTC process to be done
Phosphating class °C” coating as per IS : 3618 ~ 1966
Primer to be applied immediately after Phosphating & Drying
OTHER PROPERTIES TO BE CHECKED & ADDED IN PDI REPORT
Page | of 2 Rev. No = 000 Rev Date
Deals of last > revisions
Rev. No Dae | Nature of revisiontishindra & Mahindra |
(FES) ee ‘sion Farm Equipment Sector PU:- SWARAJ
__Controied Copy | Swaraj Division PG/Module: - QE
Work Instructions / SOP / Engineering Standard
No := Swaraj ] ‘Approved by:
Engineering Standard | Date of 1" Issue:- 15 Feb 10 Somtore
(SES) 1003 igi
Title:- Engineering Standard for Paint & Primer applications | Prepared By. RV Singh, sR
on Fabricated components - Kalia \). Hhtot,
REQUIREM! 'S TO BE MET FOR PRIMER
1 Salt Spray test Should pass 168 hrs,
Rust creepage to be 2 mm max.
2 DET 35 +45 micron
3. Cross Hatch Adhesion Primer should not peel off from bare
‘metal with Permacel P-253 tape
4 Hardness Hardness should be such that finger nail
does not dig into the primer