Professional Documents
Culture Documents
Operating and Maintenance Manual For Launching-And Retrieval System of Freefall Lifeboat Type: FFA
Operating and Maintenance Manual For Launching-And Retrieval System of Freefall Lifeboat Type: FFA
TS
N
EK RE
CE
TA
H
ERNST
HATECKE
Boatyard Ernst Hatecke GmbH
Am Ruthenstrom 1
21706 Drochtersen
Phone: 0049-(0)4143-9152-0
Fax: 0049-(0)4143-9152-40
E-mail: email@Hatecke.de
www.hatecke.de Edition 09/06
Index
1 Operation Manual
2 Maintenance Manual
Additional:
General layout
Wires / small parts
Lashing (boat)
Wiring diagram (optional)
Hydraulic plan
Documentation of winch
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
1.1 Yard and yardnumber
The information given in this manual is based on our long experience and "know-how" in the
building of rescue boats, all kind of life boats their equipment and their launching and recovery
systems.
In case of an emergency,also in normal practise it is very important that every body knows how
to handle the boat, the launching system and it`s equipment.
All personal should study this manual at lifeboat drills, to make them selves thorougly
conversant with the system and to ensure a speedy and safe launching in an emergency.
The technical specifications are not binding and can be altered without prior notice.
In case of enquiries regarding existing boats please quote the details given below:
Type:
FFA 6,5M
ERNST
HATECKE
Boatyard Ernst Hatecke GmbH
Am Ruthenstrom 1
21706 Drochtersen
Phone: 0049-(0)4143-9152-0
Fax: 0049-(0)4143-9152-40
E-mail: email@Hatecke.de
www.hatecke.de
1.2 In the interest of safety
WARNING
1. During operation of the davit be cautions with long links, snap hooks and counter weights.
2. DO NOT put your hands on snap hooks, long links, counter weights and falls with tension
on this parts.
3. Always keep hands and feet clear near moving and rotating mashinery.
5. Secure all items and fasten seat belts (adjust to your size).
6. Don´t wear lifejackets during freefall launching. Failure to observe this procedure may
lead to serious injury or dead!
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
1.3 Description of the launching-and retrieval system
This launching and retrieval system is installed in the stern area of the ship to use freefall-lifeboat
as follows:
1. freefall-launch of freefall-lifeboat up to 20° list and 10° trim of the ship from certificated height.
2. controlled launch of the freefall lifeboat up to max. number of persons it is certified by means
of davit arm and winch up to 5°list and 2° trim of the ship.
3. recovery of freefall-lifeboat with crew of max. 4persons at a speed of 5m/min (winch) up to
5°list and 2° trim of the ship.
Boat wil be turned out or swing in by A-fram. Hoisting and lowering by winch with two falls each for
one hoisting sling of freefall lifeboat.
Sheaves for falls leading out of polyamide and all bolts from stainless steel.
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
1.4 Launching instruction
Freefall
The boat runs down the launching ramp and on hitting the water submerges briefly before
emerging and moving away from the stern of the ship.
The boat will clear the vessel irrespective of weather conditions or angle of heel. Instructions for
launching procedure on the following page.
Instruction of freefall procedure look at page 5, look also at the manual of the freefall-lifeboat.
Launching by davit
In some cases (shallow water, drift-ice, drifting parts of the cargo) it is necessary to launch the
boat with max. number of persons by davit.
Recovery by davit
Freefall-lifeboat with crew of max. 4 persons must be sailed astern under the davit.
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
1.5 Free fall launching
CAUTION:
Before replacing the boat in the launching ramp, the
hydraulic piston should brought back into its housed
position by opening the valve screw (pos.1)
2
1
4
EMERGENCY RELEASE PUMP
EMERGENCY RELEASE:
HYDRAULIC PISTON
Operate only when mainrelease system is damaged.
LOCKING DEVICE
Close the valve screw (pos. 3).
Operate the emergency release pump (pos. 4). (After abt. 30 strokes the locking device will
disengage - the boat is now free.)
CAUTION:
Before replacing the boat in the launching ramp, the hydraulic piston should be brought back
into its housed position by opening the valve screw (pos. 3). After replacing the boat in the
launching ramp the valve (pos. 3) should remain in the open position.
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
1.6 Launching and recovery by davit (Under deck version)
Abb./fig.3
II3. II5. III2. A WINDE / WINCH
III4. III5.
B DAVIT
II4. III3.
Abb./fig.1
Abb./fig.2
II
III7.
II
II Launching by davit:
The main switch on the switch board box (fig. 1 ) is switched on. Push in the green button
on the push button box (Fig. 2 ) - now the system is ready for work.
1. Disconnect the falls from the lashing eyes and hook them to the hoisting sling.
2. Disengage the boat lashing on the platform and to the keel.
3. Tighten up the boat falls by winch (lever A fig. 3).
4. Swing out the davit to it`s max. outreach (lever B fig. 3).
5. Lower the boat (lever A fig.3 ).
6. Disconnect the falls after the boat is waterborne.
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
1.7 Launching and recovery by davit (On deck version)
II3. III3.
III2. III4. III5.
II
III7.
II Launching by davit:
The main switch on the switch board box is switched on (must be switched on all the time of
course the heater inside). Push in the green button on the switchboard box - now the system
is ready for work.
1. Disconnect the falls from the lashing eyes and hook them to the hoisting sling.
2. Disengage the boat lashing on the platform and to the keel.
3. Tighten up the boat falls by winch.
4. Swing out the davit to it`s max. outreach.
5. Lower the boat.
6. Disconnect the falls after the boat is waterborne.
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.1 In the interest of safety
WARNING
1. During operation of the davit be cautions with long links, snap hooks and counter weights.
2. DO NOT put your hands on snap hooks, long links, counter weights and falls with tension
on this parts.
3. Always keep hands and feet clear near moving and rotating mashinery.
5. Secure all items and fasten seat belts (adjust to your size).
6. Don´t wear lifejackets during freefall launching. Failure to observe this procedure may
lead to serious injury or dead!
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.2 Hydraulic equipment
HYDRAULIC CYLINDERS:
The working pressure of the cylinders are 200 bar. They
are designed with a very high security with a test pressure
of 400 bar. The rod material is stainless steel, chromium
plated and super finished. Both cylinders are protected with
overcenter valves, which are directly installed in the
welded cylinder bottom.
HYDRAULIC WINCH-MOTOR:
The motor is also protected by an overcenter valve for
opening and closing the brake.
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.3 Hydraulic oil and lub plan
1 Hydraulic oil Look at next page look at Make oil control at the hydraulic power pack monthly.
page 10a, b, c Oil change after 200 - 1000 - 2000 operation hours,
but at least every 5 years.
2 Gearbox oil Look at next page look at Check outside visually to leakage before each operation.
winch manual Oil change after 200 - 1000 - 2000 operation hours, but at
least every 5 years.
Greasing of grease points and chainging of gearbox oil of winch should be carried out during docktime with basket.
3
4
A
2
A 2
1 1
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.4.1 Recommended oil chart ( winch 07.02.08, and 10.01)
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.4.2 Recommended oil chart (ZOLLERN winch 4.20)
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.4.3 Recommended oil chart ( low temperature duty winch 07.02.08, and 10.01)
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.5.1 Weekly inspection
Qualification level.
By supervision of a senior ships officer in accordance with the information provided by the manufacturer.
done remark
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.5.2 Monthly inspection
Qualification level.
By supervision of a senior ships officer in accordance with the information provided by the manufacturer.
7
7
6
6
1 2 3 4 5
done remark
1. Check oil level of hydraulic power pack.
2. Make sure there is no condensed water inside the hydraulic power pack.
3. Make sure there is no water inside the electrical box of the power pack.
4. Check adjusted overpressure (220 bar) of hydraulic.
(switch on power pack and hoist the davit arm against end position)
5. Operate the winch in order to sprincler all inner parts by oil.
6. Check the Lashing aft & fore.
7. Grease wire rope falls and chain fore runner.
8. Visual inspection to ensure that the system is ready to use.
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.5.3 Annual thorough examination (acc. to MSC.1/Circ.1206)
Qualification level.
By manufacturers representative or a person appropriately trained and certified by the manufacturer.
Look at page 1.2.7.6 Authorized service stations.
Items listed in checklists for the weekly/monthly inspections also form the first part of the
annual thorough examination, when carrying out this examination the inspection of these
items should be performed by the ship´s crew in the presence of the manufacturer´s
representative or a person appropriately trained and certified by the manufacturer for the
work to be done.
Inspection and maintenance records of inspections and routine maintenance carried out
by the ship´s crew and the applicable certificates for the launching appliances and
equipment should be available.
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.5.4 5-Years Overhaul & Testing (acc. to MSC.1/Circ.1206)
Qualification level.
By manufacturers representative or a person appropriately trained and certified by the manufacturer.
Look at page 1.2.7.6 Authorized service stations.
Items listed in checklists for the weekly/monthly inspections also form the first part of the
annual through examination, when carrying out this examination the inspection of these
items should be performed by the ship´s crew in the presence of the manufacturer´s
representative or a person appropriately trained and certified by the manufacturer for the
work to be done.
Inspection and maintenance records of inspections and routine maintenance carried out
by the ship´s crew and the applicable certificates for the launching appliances and
equipment should be available.
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.5.5 Overhauling and testing acc. to SOLAS Chapt.III, Reg. 20. 11. 1
Acc. to SOLAS, Chapt.III, Reg.20.11.1 following has to carried out with the davit system:
"Operationally test under a load of 1.1 times the total mass of the life boat when loaded with its full
complement of persons and equipment whenever the davit system is overhauled. Such
overhauling and test shall be carried out at least once every 5 years"
Overhauling of system has to be carried out acc. to requirements of class or national authority.
WARNING:
During operation of davit be cautious with long links, snap hooks and counter weights.
2.5.6 Principal log scheme
No: Kind of service: Note: Date: Name:
Boatyard Ernst Hatecke GmbH, Am Ruthenstrom 1, 21706 Drochtersen, Phone: 0049-(0)4143-9152-0, Fax: 0049-(0)4143-9152-40, E-mail: email@Hatecke.de, www.hatecke.de
2.5.7 Authorized service stations