Standard Terms and Conditions - Precast Quotation
Standard Terms and Conditions - Precast Quotation
QMS-SM-002-REV:00,DATED:01/03/2013
All concrete-related testing activities are done in accessories) and handling purposes shall be
SMEET Central Laboratory. If testing is required and made of ordinary mild steel when these items
is to be made by an outside Independent
are embedded in concrete and shall be
Laboratory, the cost of said independent testing is
borne by the Client. galvanized when they are exposed to the
elements. Unless otherwise stated, stainless
3. Delivery and Erection steel provisions have not been considered
Construction schedule will be in accordance with and/or allotted in the price.
Construction Schedule agreed and signed by both
parties. 5. Liability
SMEET reserves its entitlement for time extension SMEET shall not be liable in damages or be
due to any delay incurred for faults or reasons not furnishing to the other Party grounds to a right to
attributable to SMEET i.e., readiness of in-situ terminate the contract by reason of delay or default
foundation, bad weather condition (strong wind, caused by conditions beyond the control of SMEET
rain, sandstorm) etc. including, but not limited to Acts of God,
Likewise, SMEET reserves its entitlement for time government restrictions, wars, insurrections and the
extension for any delay due to raw materials likes.
shortage (cement, steel, sand and aggregates, etc.). SMEET shall not be liable for any third party claims
Delivery/Erection is commenced upon receipt of a
arising in connection with the works, except as
written confirmation from client with respect to the
readiness of the foundation/site to proceed with the solely and directly arising from the wilful default of
delivery/erection of precast units. In case the SMEET. SMEETs cumulative liability for damages, if
production of the precast elements is completed in any, for all claims of any kind arising in connection
accordance with the Construction Programme and with the work in limited to 10% of the contract
the site is not ready to receive the cast units, the value. Notwithstanding the foregoing SMEET shall
Client has to provide stocking area at site to allow
not be liable for any special, punitive, indirect,
delivery and stocking at site. Delivered and stocked
incidental or consequential damages, lost revenues
slabs at site shall be considered as “Materials Off-
site” and shall be invoiced accordingly at 85% of or lost profits, however caused, arising from or in
their contract value. connection with the work done by SMEET.”
QMS-SM-002-REV:00,DATED:01/03/2013