Download as pdf or txt
Download as pdf or txt
You are on page 1of 47

Furnace Improvements

Services

Maximize Profits
By
Revamping Fired Heaters

✓ Increased Capacity ✓ Higher Efficiency


✓ Longer Run Lengths ✓ Lower NOx Emissions

Furnace Improvements Services Inc. A.G. Furnace Improvements Pvt. Ltd.


1600 Highway 6, Suite 480 A-74, Ground Floor, Sector-2,
Sugar Land, TX 77478 Noida (UP)-201301, India
Tel: (281)980-0325 Tel 1: +91-120-4146823
Fax: 1-877-395-0760 Tel 2: +91-120- 4149921

Email: info@heatflux.com
Web: www.heatflux.com
Furnace Improvements Services
Organization Chart
Ashutosh Garg
(Vice-President)

Bala Saligram Arun Garg


(Director)

Structural/ 3D Design Poject/Estimation Quality Mamta


Process CFD Group IT Administration
Mechanical Modeling Group Proposal & Planning Assurance Garg

Balwant Amarvir Chrish Slaten Tung Tran Sandhya


Harsh Ghuge Ajay Malik Julio Vimla Pawar
Singh Bisht Lalit Nainwal Chilka (Contract) (Contract) Goel
Hernandez
Naseem Ananth Sharad N Umakant Jessica
Sadam Ahmad Talib Hussain Bijal Gangar Ron Mahinder
Ahmad Krishna Pachpute Sharma Ponce
(Contract) Hallman Kumar
Mukesh Kumar Meghna Nilesh Aher
Anuj Nigam Fahad P. HSE & Site Sheela Mehto
Mathuria
Services
Digvijay Deepika Amit Mani
Davinder Singh Muhammad Ali Tiwari Sapna Tyagi
Tomar Umlani
Don
Kunal Sopori Jordan
Ajay Saini Naulesh Kumar (Contract)
Disha
Shakeel Ahmad Ravi Gaba Mangal
Sushil
FIS TEAM Pradeep Kushal Singhania Sharma
AGFIS TEAM
Contract Manoj Ashutosh

Harmanpreet
Neeraj Singh www.heatflux.com
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

FIS ENGINEERING SERVICES

FIELD
SERVICES
» Energy Survey
» Safety Audits
REVAMPING » Furnace Audits
SERVICES
» Reliability Audits NEW HEATER
» Re-tubing Fired
Heaters » Combustion » Longer Run
Optimization Lengths
» Upgrading
Convection Section » Capacity Increases
» Heater Tuning & » Efficiency
Optimization Improvement
» NOx Reduction

OUR COMPANY
Maximize Profits by Revamping Fired Heaters
Furnace Improvements Services (FIS) est. 1996 in Sugar Land, TX.

Mission: to improve performance and provide uniform heat transfer in fired


heaters.

For over 20 years now, FIS has provided engineering services to improve the
performance and efficiency of their fired heaters and boilers as well as help
reduce refinery NOx emissions. FIS has performed over 400 projects for clients
like Citgo, Valero, Phillips 66, Alon, Frontier, and Total.

Our vision is to be the ultimate technology provider for fired heaters and
boilers.

www.heatflux.com 1
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

OUR EXPERTISE
FIS revamp for refinery fired heaters includes: Crude, Vacuum, Catalytic Reformer, Hot
Oil, Coker Heaters, and CO boilers.
FIS provides complete turn-key services for the design, engineering, and supply of new
fired heaters to end users. Our designs are the most economical, efficient, and reliable.
Furnace Improvements has several patented technologies for improving the
performance of fired heaters. These patented technologies are aimed at improving
performance of existing fired heaters.

Technology Application
Split Flow Technology Increases capacity with limited process side pressure drop
Flue Gas Injection Reduces coking & tube metal temperatures
Inclined Firing System Reduces flame impingement and high tube metal temperatures
Spider Gas Tip Shorter flame gas burners
Stack Damper Provides Smooth Control of Heater Draft

INCLINED FIRING SYSTEM


One of the most common issues faced by operators and owners is high
tube metal temperature in fired heaters. Most tube failures in fired heaters
occur due to high tube metal temperatures (TMTs).
‘Furnace Improvements developed the patented INCLINED FIRING
SYSTEM (IFS) to eliminate flame impingement on heater tubes.’

We install burners at 5 – 7 angles away from the tubes with this burner
arrangement; a heater will have the following advantages:
▪ Lower Tube Metal Temperature
▪ Longer Tube Life
▪ Increased Heater Run Lengths
▪ Uniform Heat Transfer
▪ Lower Coking Rates

www.heatflux.com 2
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

INCLINED FIRING IN A CATALYTIC REFORMER

INTERHEATER -2 INTERHEATER -1 CHARGE HEATER

INCLINED FIRING IN A DOWN FIRED STEAM


REFORMER
Base case Inclined Firing case

High flue gas temperature High flue gas temperature


going towards the tubes. going away from the tubes.

[°F] In the Inclined firing case, temperature contours clearly show the reduction in the flue
gas temperature around the radiant tubes.

www.heatflux.com 3
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

INCLINED FIRING IN A DOUBLE FIRED


COKER HEATER

Vertical Up Firing Inclined Firing

INCLINED FIRING IN HORIZONTAL TUBE CABIN HEATER


WITH END WALL FIRING
Existing Case

High temperature
region is in the
centre of the
heater, flue gas
temperature near
7° Inclined Firing Case the radiant tubes is
reduced.

www.heatflux.com 4
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

SOME PROJECTS WHERE WE USED


INCLINED FIRING SYSTEM (IFS)

Refinery Unit
Alon USA LP Reboiler Heaters H-102 & H-205
Citgo Twin Cell Crude Heater 11-H-01
CountryMark LLP DHT Charge Heater 210-H-100
Gladieux Processing Hot Oil Heater
Valero Crude Heater (in progress)

*Patent # US 7,484,478 B2

SPLIT FLOW TECHNOLOGY


Split Flow aims to improve the utilization of thermal energy for process heating.
This objective is achieved by splitting the process fluid into two parallel streams:
Main Stream Split Stream

www.heatflux.com 5
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

SPLIT FLOW TECHNOLOGY


Main Stream
-The fluid in the Other Advantages of the
first stream is
heated Split Flow Technology
predominantly by The streams are then include:
the convective combined at the heater
and radiant heat outlet. The Catalytic ▪ High heater efficiency
transfer
mechanism
Reformer technology ▪ Low process pressure
has been very
successful for capacity drop
increase of fired ▪ Low firebox
Split Stream heaters particularly in temperature
heaters. Increases the
-The fluid in the capacity of a heater by ▪ Low radiant heat
second stream is 15% to 30 %. fluxes
heated
predominantly by ▪ Low TMTs
the convective ▪ Low installation costs
heat transfer
mechanism.

SOME PROJECTS WHERE WE USED


Split Flow Technology
Refinery Unit
Alon USA LP H2 Heater
Alon USA LP DHT Heater
Citgo Catalytic Reformer
ConocoPhillips Reformer Catalytic Heater
Gladieux Processing Hot Oil Heater
Valero Catalytic Reformers

*Patent # US 7,204,966 B2 B2

www.heatflux.com 6
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

CFD MODELING
At Furnace Improvements, we utilize CFD modeling to analyze problems and provide
solutions.
This tool enables us to study the existing design and operating conditions of heaters
and determine recommendations for solving any difficulties.
CFD gives a competitive edge over other analyses due to its visual presentation of the
observed conditions and proposed modification.

The following are a few areas where FIS has used this tool effectively:

Mixing (ammonia
Study Flow injection grid & Combustion Tube Heat transfer
flue gas (burner &
Mal-distribution recirculation mix heater design) Failures studies
box design)

CFD MODELING
Temperature contours (ºF) Base Case

www.heatflux.com 7
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

CFD MODELING
Temperature contours (ºF) Proposal Case

VELOCITY CONTOURS AND VECTORS AT CRUDE


HEATER CELL

Cell Cell
Heater 1 Heater 2

www.heatflux.com 8
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

FIS 3-D MODELING

A B C D
(A) Model of Inclined Firing Technology applied to an 8 burner system
(B) Model of a vertical cylindrical heater with a common stack
(C) Model of a Naphtha Splitter Reboiler Heater
(D) Model of a Compressed Air Heater

REVAMPED HEATERS
Revamping fired heaters is a practical and effective way to improve heater
performance. This strategy focuses on working with existing components, and as
a result, capital investment and downtime are minimized.

Above Photo: NOx Reduction in


Above Photos: #4 Platformer Heater Citgo Corpus Christi
Alky Heater
Before (Left) and After Revamp (Right)
Phillips66 Wood River

Above Photo: NOx Reduction in Crude Heater


Premcor/Husky Lima Refinery

www.heatflux.com 9
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters

NEW HEATERS

Above Photos: New hot oil heater at Phillips 66 Wood River; FIS was responsible for
the design, engineering, procurement, and fabrication services on this project.

OUR CLIENTS

www.heatflux.com 10
Furnace Improvements Services

REFERENCE LIST

Email: info@heatflux.com
Web: www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
1600 Highway 6, Suite 480
Sugar Land, TX 77478-4923
Tel: (281) 980-0325, Fax: 1-877-395-0760
Email: info@heatflux.com ; www.heatflux.com

HEATER REVAMP PROJECTS (SPLIT FLOW)

1. Client Citgo
Location Corpus Christi, TX
Project FIS 183: No.4 Platformer Heater Efficiency Improvement using
Split Flow Convection and NOx Reduction
Scope of Work Design, Engineering, & Project Services for Installation of New
Convection Sections and New Low NOx Burners (2002)
Revamped Duty 194.46 MMBtu/hr

2. Client Valero
Location Texas City, TX
Project FIS-242: NHT and Platforming Heaters Capacity Increase with
Patented Split Flow Technology
Scope of Work Design, Engineering, & Project Services for New Split Flow
Convection Sections and Low NOx Burners (2007)
Revamped Duty 151.51 MMBtu/hr

3. Client Valero
Location Wilmington, CA
Project FIS-248: Platformer Heater Capacity Increase with patented
Split Flow Technology
Scope of Work Design, Engineering, & Project Services of New Split Flow
Convection Section (2008)
Revamped Duty 160.86 MMBtu/hr

4. Client Alon USA


Location Big Spring, TX
Project FIS 260: Capacity Improvement of Reactor Charge Heater (080-
H-001)
Scope of Work Design, Engineering, Supply and Installation of a Split Flow
Convection Section (2006)
Revamped Duty 42.6 MMBtu/hr

Highest Capacity - Longest Run Length - Maximum Profits


www.heatflux.com 1
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

5. Client Alon USA


Location Big Spring, TX
Project FIS-296: Hydrogen Heater Capacity Improvement (77-5-001)
Scope of Work Design, Engineering, Project Services for New Convection
Section (2009)
Revamped Duty 14.77 MMBtu/hr

6. Client Alon USA


Location Big Spring, TX
Project FIS-329B: HDS Depentanizer Reboiler (H-102) and Reformer
Depentanizer Reboiler (H-205) Revamp
Scope of Work Design, Engineering, Supply & Installation of New Split Flow
Convection Section and Ultra Low NOx Burners (2010)
Revamped Duty 37.07 MMBtu/hr (H-205) and 51.15 MMBtu/hr (H-102)

7. Client Phillips 66
Location Roxana, IL
Project FIS-335: NOx Reduction & Capacity Increase of CR-3 Unit
Heaters (H-4 & H-5)
Scope of Work Design, Engineering & Supply of New Split Flow Convection
Section, Stack, Floor, Plenum and Ultra Low NOx Burners
(2010)
Revamped Duty 105.9 MMBtu/hr (H-4) and 97.8 MMBtu/hr (H-5)

8. Client HPCL
Location Mumbai, India
Project FIS-364B: Extract Recovery Heaters (F-201/3201/4201) and
Raffinate Recovery Heaters (F-202/3202/4202) in SEU Units
(SEU-I/II/III) Revamp
Scope of Work Design and Engineering for Capacity Increase in SEU Units -
Partially modified radiant section, completely new convection
and partially new stack (2012)
Revamped Duty 47.77 MMBtu/hr (Heaters in SEU I, II and III Units each)

Highest Capacity - Longest Run Length - Maximum Profits


2
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

HEATER REVAMP PROJECTS (INCLINED FIRING)

1. Client Alon USA


Location Big Spring, TX
Project FIS-329B: HDS Depentanizer Reboiler (H-102) and Reformer
Depentanizer Reboiler (H-205) Revamp
Scope of Work Design, Engineering, Supply & Installation of New Split Flow
Convection Section and Ultra Low NOx Burners (2010)
Revamped Duty 37.07 MMBtu/hr (H-205) and 51.15 MMBtu/hr (H-102)

2. Client Citgo
Location Corpus Christi, TX
Project FIS-356: Revamp of Crude Heater (11-H-01) (2012)
Scope of Work Design, Engineering for Inclined Burners (2010)

3. Client HPCL
Location Mumbai, India
Project FIS-364B: Extract Recovery Heaters (F-201/3201/4201) and
Raffinate Recovery Heaters (F-202/3202/4202) in SEU Units
(SEU-I/II/III) Revamp
Scope of Work Design and Engineering for Capacity Increase in SEU Units -
Partially modified radiant section, completely new convection
and partially new stack (2012)
Revamped Duty 47.77 MMBtu/hr (Heaters in SEU I, II and III Units each)

4. Client CountryMark
Location Mount Vernon, IN
Project FIS-367C: DHT Charge Heater (210-H100) Revamp - Capacity
Increase
Scope of Work Design, Engineering, Supply and Erection of New Radiant Shell
Extension Module, Convection Section and Stack (2014)
Revamped Duty 22.50 MMBtu/hr

5. Client Gladieux Processing


Location Huntington IN
Project FIS-392: Design, Engineering, & Supply of 30 MMBtu/hr Hot
Oil Heater (2015)
Highest Capacity - Longest Run Length - Maximum Profits
3
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

6. Client Valero
Location Texas City, TX
Project FIS-428 H-16 Crude Heater Revamp with FIS Patented Inclined
Burners
Scope of Work Design, Engineering, and Supply of New burners, floor, and
plenum with FIS patented inclined burner arrangement, new FD
fan, Hot Air and Flue gas ducts (2016)
Revamped Duty 165.10 MMBtu/hr

7. Client Fluor/ Sasol Chemicals


Location Lake Charles, LA
Project FIS-439: Design, Engineering, Supply of a 126 MMBtu/hr Hot
Oil Heater with APH, SCR and Ammonia System (2018)

Highest Capacity - Longest Run Length - Maximum Profits


4
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

SUPPLY OF NEW HEATERS

1. Client Citgo
Location Corpus Christi, TX
Project FIS-247: Design, Engineering & Supply of a 40 MMBtu/hr
Combined Feed Heater (2005)

2. Client Phillips 66
Location Roxana, IL
Project FIS-269D: Design, Engineering & Supply of a 42.82 MMBtu/hr
Vacuum Heater (H-28) (2008)

3. Client Devon Energy


Location Riverton, WY
Project FIS-279: Design, Engineering, Supply & Erection of 25
MMBtu/hr Hot Oil Heater (2007)

4. Client Phillips 66
Location Roxana, IL
Project FIS-286B: Design, Engineering, Fabrication and Supply of a
165 MMBtu/hr Hot Oil Heater (2008)

5. Client NTS Systems


Location Albuquerque, NM
Project FIS-379: Design and Engineering of 2 new 2.67 MMBtu/hr High
Temperature Air Heaters (2012)

6. Client Staatsolie
Location Paramaribo, Suriname
Project FIS-384: Design, Engineering, Supply of 8.82 MMBtu/hr
Visbreaker Charge Heater (2012)

7. Client Gladieux Processing


Location Huntington IN
Project FIS-392: Design, Engineering, & Supply of 30 MMBtu/hr Hot
Oil Heater (2015)

Highest Capacity - Longest Run Length - Maximum Profits


5
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

8. Client Sealion Technologies


Location Texas City, TX
Project FIS-394: Design, Engineering, Supply of a 0.44 MMBtu/hr
Reactor Heater (2013)

9. Client Fluor/ Sasol Chemicals (Ongoing)


Location Lake Charles, LA
Project FIS-439: Design, Engineering, Supply of a 126 MMBtu/hr Hot
Oil Heater with APH, SCR and Ammonia System (2018)

10. Client Country Mark


Location Mount Vernon, IN
Project FIS-475: Design, Engineering, Supply and Erection of a 25
MMBtu/hr Reactor Charge Heater (2019)

Highest Capacity - Longest Run Length - Maximum Profits


6
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

HEATER REVAMP PROJECTS

1. Client Alon USA


Location Big Spring, TX
Project FIS 126: Revamp of Atmospheric Heaters 1H-1A/B/C and
Vacuum Heater (2H-1)
Scope of Work Design, Engineering & Project Services for Installation of Low
NOx Burners in Atmospheric Heaters (1H-1A/B/C) and
Vacuum Heater (2H-1) (1998)
Revamped Duty 31.47 MMBtu/hr

2. Client Citgo
Location Corpus Christi, TX
Project FIS 183: No.4 Platformer Heater Efficiency Improvement using
Split Flow Convection and NOx Reduction
Scope of Work Design, Engineering, & Project Services for Installation of New
Convection Sections and New Low NOx Burners (2002)
Revamped Duty 194.46 MMBtu/hr

3. Client Phillips66
Location Roxana, IL
Project FIS 185: CFHT Efficiency Improvement and NOx Reduction
Scope of Work Design, Engineering, & Project Services for Installation of New
Convection Section and New Low NOx Burners (2002)
Revamped Duty 22.43 MMBtu/hr

4. Client Citgo
Location Corpus Christi, TX
Project FIS-187: Reboiler Trim Heaters Efficiency Improvement
Scope of Work Design, Engineering, & Project Services for Installation of New
Convection Section (2001)
Revamped Duty 15.14 MMBtu/hr

5. Client Phillips66
Location Roxana, IL
Project FIS 188: CCU1 CO Heater Convection Section Replacement

Highest Capacity - Longest Run Length - Maximum Profits


7
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Scope of Work Design, Engineering, Project Services for Installation of New


Convection Section (2002)

6. Client Premcor
Location Lima, OH
Project FIS 204: Crude Furnace NOx Reduction and Capacity Increase
Scope of Work Design, Engineering, Project Services for Revamping of Radiant
Section, Retubing of Convection Section and Installation of
Ultra Low NOx Burners (2004)
Revamped Duty 423.4 MMBtu/hr

7. Client Husky Oil


Location Lima, OH
Project FIS 208: Crude Furnace Revamp for NOx Reduction and
Efficiency Improvement
Scope of Work Design, Engineering, & Project Services for Radiant and
Convection Section Revamp and New Low NOx Burners (2004)

8. Client Phillips 66
Location Ponca City, OK
Project FIS 210: NOx Reduction Project for Reformer Furnace (H-48)
Scope of Work Design, Engineering and Project Services for Installation of Low
NOx Burners (2003)
Revamped Duty 143.86 MMBtu/hr

9. Client Alon USA


Location Big Spring, TX
Project FIS-224: FCCU Feed Preheater
Scope of Work Design, Engineering, & Project Services for Installation of Low
NOx Burners (2004)
Revamped Duty 33.6 MMBtu/hr

10. Client Valero


Location Texas City, TX
Project FIS-242: NHT and Platforming Heaters Capacity Increase with
Patented Split Flow Technology
Scope of Work Design, Engineering, & Project Services for New Split Flow
Convection Sections and Low NOx Burners (2007)
Highest Capacity - Longest Run Length - Maximum Profits
8
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Revamped Duty 151.51 MMBtu/hr

11. Client Valero


Location Wilmington, CA
Project FIS-248: Platformer Heater Capacity Increase with patented
Split Flow Technology
Scope of Work Design, Engineering, & Project Services of New Split Flow
Convection Section (2008)
Revamped Duty 160.86 MMBtu/hr

12. Client Phillips 66


Location Belle Chasse, LA
Project FIS-254C: NOx Reduction in Crude Heater
Scope of Work Design, Engineering & Project Services for Adding SCR NOx
Reduction & Waste Heat Recovery unit (2008)
Revamped Duty 672.2 MMBtu/hr

13. Client Valero


Location Port Arthur, TX
Project FIS-255: Capacity Increase Revamp Project of Charge Heater
Scope of Work Design, Engineering, Supply and Erection of New Convection,
Stack & Floor Modification (2006)
Revamped Duty 57.1 MMBtu/hr

14. Client Alon USA


Location Big Spring, TX
Project FIS 260: Capacity Improvement of Reactor Charge Heater (080-
H-001)
Scope of Work Design, Engineering, Supply and Installation of a Split Flow
Convection Section (2006)
Revamped Duty 42.6 MMBtu/hr

15. Client Phillips 66


Location Borger, TX
Project FIS-263B: U40 Boiler NOx Reduction Project

Highest Capacity - Longest Run Length - Maximum Profits


9
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Scope of Work Design, Engineering, Supply & Installation of CO Boiler (U-40)


involving new Superheater, Economizer, Ultra Low NOx
Burners, and FGR system (2008)

16. Client Phillips 66


Location Roxana, IL
Project FIS-266C: Alky Heater (HM2) NOx Reduction Project
Scope of Work Design, Engineering, Fabrication & Erection for revamp of Alky
Heater (HM2) involving New Convection Section, New Stack
and Ultra Low NOx Burners. (Turnkey) (2007)
Revamped Duty 60 MMBtu/hr

17. Client Alon USA


Location Big Spring, TX
Project FIS-275: Replacement of FCC Feed Preheater
Scope of Work Design, Engineering & Project Services for Installation of New
Convection Section (2006)
Revamped Duty 42.50 MMBtu/hr

18. Client Valero


Location Texas City, TX
Project FIS-280: CDHDS Reboiler Heater (H-60) Efficiency
Improvement
Scope of Work Design, Engineering & Project Services for Revamp of
Convection Section and Stack Extension (2007)
Revamped Duty 82 MMBtu/hr

19. Client CountryMark CO-OP


Location Mt. Vernon, IN
Project FIS-283: Vacuum Heater 200-H4 Capacity Increase
Scope of Work Design, Engineering & Project Services for Radiant Section
Revamp, New Convection Section and Ultra Low NOx Burners
(2008)
Revamped Duty 8.35 MMBtu/hr

20. Client Phillips66


Location Roxana, IL
Highest Capacity - Longest Run Length - Maximum Profits
10
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Project FIS-287: CO Boiler Convection Replacement


Scope of Work Design, Engineering & Project Services for New Convection
Section (2008)

21. Client Lion Oil Eldorado Refinery


Location Eldorado, AR
Project FIS-290: NOx Reduction Project
Scope of Work Design, Engineering, Project Services for Installation of Ultra
Low NOx Burners in Six heaters (2009)

22. Client Alon USA


Location Big Spring, TX
Project FIS-296: Hydrogen Heater Capacity Improvement (77-5-001)
Scope of Work Design, Engineering, Project Services for New Convection
Section (2009)
Revamped Duty 14.77 MMBtu/hr

23. Client Phillips66


Location Roxana, IL
Project FIS-299: Convection Section Modification in CO (CCU-1/2)
Heater for SCR Installation
Scope of Work Design, Engineering, Project Services for Revamping of
Convection Section (2009)

24. Client Phillips 66


Location Roxana, IL
Project FIS-301B: Radiant Retubing of Crude Heater (H-24)
Scope of Work Design, Engineering, Fabrication & Supply of Radiant Coils and
Cross Overs (2008)
Revamped Duty 259.23 MMBtu/hr

25. Client Phillips 66


Location Roxana, IL
Project FIS-301C: Ultra Low NOx Burners for Crude Heater (H-24)
Scope of Work Design, Engineering, Fabrication & Supply of Burners and
Heater Floor (2014)
Revamped Duty 259.23 MMBtu/hr
Highest Capacity - Longest Run Length - Maximum Profits
11
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

26. Client Alon USA


Location Big Spring, TX
Project FIS-303A: ULSG Hydrogen Heater Efficiency and Capacity
Increase (77H-001)
Scope of Work Design, Engineering, Procurement and Fabrication of New Split
Flow Convection Section and Stack

27. Client Alon USA


Location Big Spring, TX
Project FIS-303B: Naphtha Stabilizer Reboiler Heater Capacity
Increase (77H-002)
Scope of Work Design, Engineering, & Project Services for Radiant Shell
Modification, New Convection Section & Stack (2009)
Revamped Duty 10.80 MMBtu/hr

28. Client Alon USA


Location Big Spring, TX
Project FIS-311: Installation of New RFG Package Boiler
Scope of Work Detail Engineering, Foundation Design, Structural Calculation
and Design, Piping, Piping Stress Analysis, Shop Drawings and
Fabrication of Stack (2009)

29. Client CountryMark CO-OP


Location Mt. Vernon, IN
Project FIS-314: Naphtha Splitter Reboiler Revamp -Capacity Increase
Scope of Work Design, Engineering, & Project Services for Converting Old
Platformer Charge Heater to Naphtha Splitter Reboiler.
Modification of New Radiant Coils, Tube Supports, New End
Wall Fired Burners, Replacement of Existing Convection
Section and Stack (2009)
Revamped Duty 20 MMBtu/hr

30. Client Phillips 66


Location Roxana, IL
Project FIS-315B: HDU-H1 Heater Revamp
Scope of Work Design, Engineering, & Supply of Crossover Pipes & SS
Radiant Coils for the metallurgy upgrade in the HDU-2 H1
Charge Heater (2013)
Highest Capacity - Longest Run Length - Maximum Profits
12
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Revamped Duty 52.5 MMBtu/hr

31. Client Phillips 66


Location Roxana, IL
Project FIS-320: Duct Work (CR-1 and HCU)
Scope of Work Design, Engineering, Fabrication and Supply of Large diameter
Flue Gas Outlet Ducts with Dampers and Guillotine Blinds
(2009)

32. Client Alon USA


Location Big Spring, TX
Project FIS-329B: HDS Depentanizer Reboiler (H-102) and Reformer
Depentanizer Reboiler (H-205) Revamp
Scope of Work Design, Engineering, Supply & Installation of New Split Flow
Convection Section and Ultra Low NOx Burners (2010)
Revamped Duty 37.07 MMBtu/hr (H-205) and 51.15 MMBtu/hr (H-102)

33. Client HPCL


Location Vizag, Andhra Pradesh, India
Project FIS-333: Capacity Improvement of Crude and Vacuum Heaters
Scope of Work Design, Engineering & Project Services for New Convection
Section and New Burners (2010)
Revamped Duty 46.43 MMBtu/hr (CDU) and 15.24 MMBtu/hr (VDU)

34. Client Phillips 66


Location Roxana, IL
Project FIS-335: NOx Reduction & Capacity Increase of CR-3 Unit
Heaters (H-4 & H-5)
Scope of Work Design, Engineering & Supply of New Split Flow Convection
Section, Stack, Floor, Plenum and Ultra Low NOx Burners
(2010)
Revamped Duty 105.9 MMBtu/hr (H-4) and 97.8 MMBtu/hr (H-5)

35. Client Sinclair


Location Casper, WY
Project FIS-338: Performance Improvement on 3 Platformer Heaters
Highest Capacity - Longest Run Length - Maximum Profits
13
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Scope of Work Design, Engineering & Supply of New Transition Cone, Stack
and Platforms (2010)

36. Client HPCL


Location Mumbai, India
Project FIS-339: Capacity Improvement of FRE APS and VPS Heaters
Scope of Work Design, Engineering & Project Services for New Convection
section and Replacement of Existing Burners (2010)
Revamped Duty 169 MMBtu/hr (APS) and 9.6 MMBtu/hr (VPS)

37. Client Phillips 66


Location Roxana, IL
Project FIS-360B: Coker Preheater Revamp
Scope of Work Design & Engineering for Revamp of Coker Pre-heater (H-36)
for upgrading metallurgy of radiant coil and provision of a new
Convection section and Crossovers (2012)
Revamped Duty 20.05 MMBtu/hr

38. Client HPCL


Location Mumbai, India
Project FIS-364B: Extract Recovery Heaters (F-201/3201/4201) and
Raffinate Recovery Heaters (F-202/3202/4202) in SEU Units
(SEU-I/II/III) Revamp
Scope of Work Design and Engineering for Capacity Increase in SEU Units -
Partially modified radiant section, completely new convection
and partially new stack (2012)
Revamped Duty 47.77 MMBtu/hr (Heaters in SEU I, II and III Units each)

39. Client Phillips 66


Location Roxana, IL
Project FIS-366B: H-2 Heater Rerating
Scope of Work Design, Engineering, Fabrication & Supply for Revamp of First
Inter-Reactor Heater (H-2) involving Convection Section Coil
and Header box modifications (2012)
Revamped Duty 114.30 MMBtu/hr

Highest Capacity - Longest Run Length - Maximum Profits


14
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

40. Client CountryMark


Location Mount Vernon, IN
Project FIS-367C: DHT Charge Heater (210-H100) Revamp - Capacity
Increase
Scope of Work Design, Engineering, Supply and Erection of New Radiant Shell
Extension Module, Convection Section and Stack (2014)
Revamped Duty 22.50 MMBtu/hr

41. Client Phillips 66


Location Roxana, IL
Project FIS-373: Oil Coil Metallurgy upgrade in CCU1 CO Boiler
Scope of Work Design, Engineering, Fabrication & Supply of Inco Alloy
hairpins (2012)

42. Client Phillips 66


Location Roxana, IL
Project FIS-373B: New Burners for CO Boiler
Scope of Work Design, Engineering & Supply of New burners in CO Boiler
(2012)

43. Client Phillips 66


Location Roxana, IL
Project FIS-374: CAU H 503 Heater Revamp
Scope of Work Design, Engineering & Supply of Cross over Pipes & New
Radiant Coil Hairpins (2012)
Revamped Duty 68.26 MMBtu/hr

44. Client Phillips 66


Location Roxana, IL
Project FIS-375: Waste Heat Boiler for SCR Installation
Scope of Work Design, Engineering, Fabrication & Supply of Waste Heat
Boiler for an SCR Unit (2012)
Revamped Duty 69.9 MMBtu/hr

45. Client Phillips 66


Location Roxana, IL
Project FIS-399: New Gas Burners for CO Boiler
Highest Capacity - Longest Run Length - Maximum Profits
15
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Scope of Work Design, Engineering, CFD Modeling & Supply of New Gas
Burners in CCU-2 CO Boiler (2013)

46. Client Phillips 66


Location Roxana, IL
Project FIS-401C: Convection Section and Stack for DHT Heater
Scope of Work Design, Engineering, Fabrication & Supply of New Convection
Section and Stack (2014)
Revamped Duty 38.13 MMBtu/hr

47. Client Phillips 66


Location Sweeny, TX
Project FIS-402B: Crude Heater (9-F-4) Revamp
Scope of Work Design, Engineering, & Supply of New Ultra Low NOx Burners,
Floor Panels, Burner Plenum / Combustion Air Duct (2014)
Revamped Duty 158.3 MMBtu/hr

48. Client Holly Frontier


Location Eldorado, KS
Project FIS-410B: Coker Heater (B-2609) Burners Modification
Scope of Work Replacement of Burner tips and Pressure Drop Plates for Coker
heater Burners (2014)

49. Client Total


Location Port Arthur, TX
Project FIS-414B: Pilot Burners for Reactor Charge Heater (50-H1)
Scope of Work Engineering and Project Services for Pilot Burners (2016)
Revamped Duty 16.34 MMBtu/hr

50. Client Phillips 66


Location Wood River, IL
Project FIS-425 HCU Main Fractionator Reboiler Heater (H-3) Revamp
Scope of Work Design, Engineering, Procurement, Fabrication & Supply of
New Radiant coils and New Convection Section (2015)
Revamped Duty 96.71 MMBtu/hr

Highest Capacity - Longest Run Length - Maximum Profits


16
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

51. Client Phillips 66


Location Roxana, IL
Project FIS-427 DU-2 Crude Heaters F-202 & F-203 Revamp
Scope of Work Design, Engineering, Procurement, Fabrication & Supply of
New Radiant coils and New Convection Section (2015)
Revamped Duty 192.3 MMBtu/hr

52. Client Valero


Location Texas City, TX
Project FIS-428 H-16 Crude Heater Revamp with FIS Patented Inclined
Burners
Scope of Work Design, Engineering, and Supply of New burners, floor, and
plenum with FIS patented inclined burner arrangement, new FD
fan, Hot Air and Flue gas ducts (2016)
Revamped Duty 165.10 MMBtu/hr

53. Client NARL


Location Newfoundland, Canada
Project FIS-430B New Tube Supports for Crude Heater (H1101)
Scope of Work Design, Engineering, Supply & Installation of New Tube
Supports (2015)

54. Client Alon Big Spring Refinery


Location Big Spring, TX
Project FIS-435 Boiler #23 Up-gradation Project
Scope of Work Design, Engineering and Supply of New Burner, Economizer
and SCR System complete with Reactor, Ammonia Package
Control System and Ammonia Injection Grid (2016)

55. Client Lyondell Basell


Location Houston, TX
Project FIS-437B 736 Delayed Coke Heaters (H-101A/B) Revamp
Scope of Work Design, Engineering and Project Services for Delayed Coker
Heaters Radiant Retubing (2019)
Revamped Duty 126.8 MMBtu/hr

Highest Capacity - Longest Run Length - Maximum Profits


17
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

56. Client Phillips66


Location Wood River, IL
Project FIS-440 ULD H-1 Heater Revamp
Scope of Work Design, Engineering and Supply of New Radiant Coils,
Convection Hairpins and Radiant Tube Supports (2016)
Revamped Duty 58.8 MMBtu/hr (86.6 MBPD Charge Rate)

57. Client CITGO


Location Corpus Christi, TX
Project FIS-444 41-H-1 and 41-H-2 APH System Revamp
Scope of Work Design, CFD Modeling, Engineering, Demolition and
Construction Services to replace the existing Air Preheater
System (2016)
Revamped Duty 37.1 MMBtu/hr (H-1) and 20.1 MMBtu/hr (H-2)

58. Client Phillips66


Location Wood River, IL
Project FIS-451 Radiant Retubing of Delayed Coker Heater (H-20)
Scope of Work Design, Engineering, Fabrication and Supply of New SS347H
Radiant Hairpins (2017/2019)
Revamped Duty 83.32 MMBtu/hr

59. Client Valero


Location Texas City, TX
Project FIS-452 H-29 Charge Heater #2 Visbreaker Revamp
Scope of Work Design, Engineering and Supply of New Air Preheater Ducts
and ID & FD Fan Components (2017)

60. Client Phillips66


Location Wood River, IL
Project FIS-453 New Economizer for CCU-1 Heater
Scope of Work Design, Engineering, Procurement, Fabrication and Supply of
New Economizer (2017)
Revamped Duty 26.7 MMBtu/hr

61. Client Phillips66


Location Wood River, IL
Highest Capacity - Longest Run Length - Maximum Profits
18
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Project FIS-454 Convection Retubing of DU-1 F-301 & F-302 Crude


Heaters
Scope of Work Design, Engineering, Fabrication and Supply of New SS317L
Convection Hairpins and HK40 Tube Sheets (2017)
Revamped Duty 87.72 MMBtu/hr (F-301) and 141.35 MMBtu/hr (F-302)

62. Client Lyondell Basell


Location Houston, TX
Project FIS-463B 737 Delayed Coker Heaters (F-001/002)
Scope of Work Design, Engineering and Project Services for APH system
Upgrade of Delayed Coker Heaters (F-001/002) (2019)
Revamped Duty 127.26 MMBtu/hr

63. Client Phillips66


Location Wood River, IL
Project FIS-466 Coker Heaters (H351H1 & H351H2) Radiant Coil
Upgrade
Scope of Work Design, Engineering and Supply of New SS347H Radiant
Hairpins (2018)
Revamped Duty 212.72 MMBtu/hr

64. Client Phillips66


Location Wood River, IL
Project FIS-467 CO Heater (H1) SSH Coil Supply
Scope of Work Design, Engineering and Supply of New Convection SSH
Hairpins (2017)

65. Client Phillips66


Location Wood River, IL
Project FIS-476 New Stack for CR-1 H3 Heater
Scope of Work Design, Engineering, Fabrication and Supply of New Stack
(2018)

66. Client Phillips66


Location Wood River, IL
Project FIS-481 New Radiant Hook Hangers for CR-1 H-1 & 2 Heaters

Highest Capacity - Longest Run Length - Maximum Profits


19
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Scope of Work Design, Engineering and Supply of New Radiant Hangers for
CR-1 H-1 & H-2 Heaters (2019)

67. Client Phillips66


Location Wood River, IL
Project FIS-484 New Stack Cap for Stabilizer Reboiler Heater (H-1)
Scope of Work Design, Engineering and Supply of New Stack Cap (2019)

68. Client Phillips66


Location Wood River, IL
Project FIS-485 ULD Stabilizer Reboiler (H-4) Heater Revamp
Scope of Work Design, Engineering, Procurement, Fabrication & Supply of
New SS347H Radiant Coils and New Convection Section with
SS347H Coils (2019)
Revamped Duty 47 MMBtu/hr

69. Client Phillips66


Location Wood River, IL
Project FIS-486 DU-2 Crude Heater (F-200) Revamp
Scope of Work Design, Engineering, Procurement, Fabrication & Supply of
New SS317L Radiant Coils and New Convection Section with
SS317L Coils (2019)
Revamped Duty 107.24 MMBtu/hr

70. Client Phillips66


Location Wood River, IL
Project FIS-487 Convection Hairpins for Delayed Coker Heater (H-20)
Scope of Work Design, Engineering, Procurement, Fabrication & Supply of
New Convection Hairpins (2019)
Revamped Duty 83.32 MMBtu/hr

71. Client CITGO


Location Corpus Christi, TX
Project FIS-488 Supply of Peep Doors
Scope of Work Supply of Peep Door Assembly (2019)

Highest Capacity - Longest Run Length - Maximum Profits


20
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

72. Client Phillips66


Location Wood River, IL
Project FIS-489 New Pressure Parts for CR-1 H-1/2/4 & 7 Heaters
Scope of Work Supply of Miscellaneous Items (Pipes and Fittings) (2019)

73. Client Phillips66


Location Wood River, IL
Project FIS-490 Convection Section and Stack for Crude Heater (H-24)
Scope of Work Design, Engineering, Procurement, Fabrication & Supply of
New Radiant Off Take Ducts, Convection Section, Off Take
Ducts and Stack (2019)
Revamped Duty 224.57 MMBtu/hr

74. Client Valero


Location Texas City, TX
Project FIS-491 APH Replacement for H-28 Heater
Scope of Work Project Services and Supply of New Deka APH (2019)

75. Client Delek US


Location Big Spring Refinery, TX
Project FIS-492 New Stack for Alkyl Hot Oil Heater (11-H-002)
Scope of Work Design, Engineering, Procurement, Fabrication & Supply of
New Stack & Platform (2019)

76. Client Phillips66


Location Wood River, IL
Project FIS-493 New Radiant Hangers for ULD Stabilizer Reboiler
Heater (H-4)
Scope of Work Design, Engineering and Supply of New Radiant Tube Hangers
(2019)

77. Client Phillips66


Location Wood River, IL
Project FIS-495B H-1 and H-2 Heaters SG Coil Retubing
Scope of Work Design, Engineering and Supply of SG coils in H-1 and H-2
heater convection section (Ongoing)
Revamped Duty 136.4 MMBtu/hr (H-1) and 129 MMBtu/hr (H-2)
Highest Capacity - Longest Run Length - Maximum Profits
21
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

78. Client Delek US


Location Big Spring Refinery, TX
Project FIS-496 Crude Heaters (1H-1A/B) Revamp
Scope of Work Design, Engineering, Procurement, Fabrication and Supply of
New Convection Section for 1H-1A Heater and Supply of New
Radiant Hairpins, Radiant Arch and Convection Section for 1H-
1B Heater (Ongoing)
Revamped Duty 54.28 MMBtu/hr (1-H-1A) and 54.29 MMBtu/hr (1-H-1B)

Highest Capacity - Longest Run Length - Maximum Profits


22
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

ENGINEERING STUDIES

1. Client Alon USA


Location Big Spring, TX
Project FIS-125: Engineering Study of Crude and Vacuum Heaters

2. Client LyondellBasell
Location Houston, TX
Project FIS-128: Engineering Study of Crude Heaters (6-F-1 A/B)

3. Client LyondellBasell
Location Houston, TX
Project FIS-141: Tuning of Heaters

4. Client Alon USA


Location Big Spring, TX
Project FIS-157A/B: Engineering Study of Crude Heater (1H-1A) and
Vacuum Heater (2H-1)

5. Client Air Products


Location La Porte, TX
Project FIS-168: Field Survey/Recommendation for Oxygen Analyzers
in Feed Preheaters

6. Client Phillips 66
Location Borger, TX
Project FIS-172: Engineering Study for Reducing Coking in a Crude
Heater

7. Client Air Products


Location La Porte, TX
Project FIS-179: Engineering Study for POX Unit Heaters

Highest Capacity - Longest Run Length - Maximum Profits


23
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

8. Client Phillips 66
Location Roxana, IL
Project FIS-185: Engineering Study for Design of a New Convection
section and Recommendations for Improved Performance of
CFHT Heater – Installation of Burners

9. Client Air Products


Location La Porte, TX
Project FIS-191: Survey of LOX Vaporizer

10. Client LyondellBasell


Location Houston, TX
Project FIS-212 Vacuum Heater (6F-2) Study

11. Client Phillips 66


Location Roxana, IL
Project FIS-217: Rerating Report for Heat Medium Heater (H-35)

12. Client Phillips 66


Location Santa Maria, CA
Project FIS-220: Field Survey Report (B-2B) Crude Heater

13. Client Phillips 66


Location Borger, TX
Project FIS-231: Design and Engineering for Unit 9 Low NOx Burners

14. Client Phillips 66


Location Roxana, IL
Project FIS-236: Rerating of Platformer Charge Heater (F-1) /Reactor
Fired Heater (F-101)

15. Client Phillips 66


Location Trainer, PA
Project FIS-246: Engineering Study to Increase Capacity of Isocracker
Charge Heater
Highest Capacity - Longest Run Length - Maximum Profits
24
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

16. Client Phillips 66


Location Roxana, IL
Project FIS-250: Evaluation and Re-rating of the H-1 fired heater for
KHT Revamp Project. Detailed Engineering & Project Services
for Burner Replacement in CFHT Heater

17. Client Phillips 66


Location Roxana, IL
Project FIS-251: Re-rating Study for CCU2 CO Heater

18. Client Phillips 66


Location Roxana, IL
Project FIS-253: Energy Audit of 4 Fired Heaters

19. Client Phillips 66


Location Belle Chasse, LA
Project FIS-258: Engineering Study for NOx Reduction and Efficiency
Improvement for Alkylation Unit Reboiler Heaters (491-H-1 &
491-H-2)

20. Client Phillips 66


Location Roxana, IL
Project FIS-259: CR-3 Process Heaters (H-4/5/6) - NOx Reduction
Study (2005)

21. Client Phillips 66


Location Roxana, IL
Project FIS-269: Engineering Study for Vacuum Heater (H-28) and
Transfer Line Rerating (2006)

22. Client Phillips 66


Location Los Angeles, CA
Project FIS-270: Performance Improvement Study for Vacuum Heaters
H-33/34 (2007)

Highest Capacity - Longest Run Length - Maximum Profits


25
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

23. Client Phillips 66


Location Roxana, IL
Project FIS-271: CCU-1/CCU-2 Steam Drums Re-Rate Study

24. Client Phillips 66


Location Rodeo, CA
Project FIS-272: Capacity & Efficiency Improvement Study of Crude
and Vacuum Heaters (B-601 & B-602) (2006)

25. Client Phillips 66


Location Roxana, IL
Project FIS-276: Re-rating for SCR Installation in CCU2 CO Heater
(2006)

26. Client Phillips 66


Location Belle Chasse, LA
Project FIS- 285: NOx Reduction in Heaters 1391-H-4, 1791-H-1 and
291-H-2 Engineering (2007)

27. Client Phillips 66


Location Roxana, IL
Project FIS-286: BEU Heat Medium Heater (H3) NOx Reduction
(2007)

28. Client Phillips 66


Location Borger, TX
Project FIS-291: SCR Installation Feasibility Study on Steam Methane
Reformer (2007)

29. Client Phillips 66


Location Roxana, IL
Project FIS-292: Engineering Study for Reducing NOx in Boiler No. 15
(2007)

Highest Capacity - Longest Run Length - Maximum Profits


26
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

30. Client Phillips 66


Location Trainer, PA
Project FIS-297: Engineering Study of Fractionator Heater (H-02)
(2007)

31. Client Phillips 66


Location Ferndale, WA
Project FIS-318: Efficiency Improvement Study for Depropanizer
Reboiler Heater (17F-1) (2009)

32. Client Phillips 66


Location Wilhelmshaven, Germany
Project FIS-323: Field Optimization of Three Fired Heaters (B1402,
B1901 and B1201) (2009)

33. Client Phillips 66


Location Wilhelmshaven, Germany
Project FIS-328: Engineering Study of Crude Heaters B-1101 and B-
1102 (2009)

34. Client Phillips 66


Location Mont Belvieu
Project FIS-347: Engineering Study of Boiler BO-202 for Reliability
Assessment (2010)

35. Client LyondellBasell


Location Morris, IL
Project FIS-352: NOx Reduction Study of Steam Superheater Furnace
(11-HCC-113) (2010)

36. Client IOCL, Bongaigaon


Location Bongaigaon - India
Project FIS-353: Efficiency Improvement Study CDU-I Crude Heater
(11-17-001)

Highest Capacity - Longest Run Length - Maximum Profits


27
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

37. Client Phillips 66


Location Trainer, PA
Project FIS-361: Burner Replacement Study for Diesel HDS Heater (F-
501) (2011)

38. Client Phillips 66


Location Roxana, IL
Project FIS-366: Modeling Study of CR-1 Heaters H-1 & H-2 (2011)

39. Client Belgian Refining Corp


Location Antwerp, Belgium
Project FIS-368: Engineering Study for B0702 Vacuum Feed Heater
(2011)

40. Client LyondellBasell


Location Houston, TX
Project FIS-370: Engineering Study for Capacity Improvement of
Vacuum Heater (537-F-002) (2011)

41. Client Total


Location Antwerp. Belgium
Project FIS-371: Efficiency Improvement Study of HDS-3 Hydrofiner
Charge Heater (B-6101) (2011)

42. Client Phillips 66


Location Roxana, IL
Project FIS-372: Engineering Study for CCU-1 CO Heater (2011)

43. Client Total


Location Leuna, Germany
Project FIS-378: Engineering Study for Vacuum Heater 611-H-1002
(2012)

44. Client Total


Location Zeeland Refinery, Vlissingen, Netherlands
Highest Capacity - Longest Run Length - Maximum Profits
28
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Project FIS-380A: Performance Improvement Study for Crude Heater


201-H-01 (2012)

45. Client Total


Location Zeeland Refinery, Vlissingen, Netherlands
Project FIS-380B: Performance Improvement Study for Vacuum Heater
301-H-01 (2012)

46. Client Lima Refining


Location Lima, OH
Project FIS-382: Engineering Study for NOx Reduction and Capacity
Improvement of Crude & Vacuum Heater (2012)

47. Client Citgo


Location Corpus Christi, TX
Project FIS-383: APH Study for Coker Heater (2012)

48. Client Phillips66


Location Sweeny, TX
Project FIS-387B: Performance Improvement Study of Coker Heaters
(SWY-2902-CKR-36-001&002) (2016)

49. Client Phillips 66


Location Billings, MT
Project FIS-395 A, B, C, & D: Engineering Studies of Crude Heater H-
1, Vacuum Heater H-17, Steam reformer H-9401, and FCC
Heater H-18 in Crude Service (2013)

50. Client Total


Location Port Arthur, TX
Project FIS-396: Engineering Study of Air Preheating System of Crude
Heaters H-202 A & B (2013)

51. Client Husky


Location Lima, OH
Highest Capacity - Longest Run Length - Maximum Profits
29
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Project FIS-400: Engineering Study of Hydrocracker Stabilizer


Reboiler H-2003 (2013)

52. Client Phillips 66


Location Roxana, IL
Project FIS-401: Engineering Study of DHT Charge Heater F-1 (2013)

53. Client Citgo


Location Lake Charles, LA
Project FIS-404: Engineering Study of Unicracker Heaters: Recycle
Hydrogen Gas Heater B-2 and Recycle Oil Heater B-5 (2014)

54. Client Flint Hills


Location Corpus Christi, TX
Project FIS-406: Engineering Study of DHT-1 Charge Heater (2013)

55. Client Qatar Gas


Location Doha, Qatar
Project FIS-407: Engineering Study for Condensate Heater 82-F1201,
Charge Heater 82-F1501, Reactor Feed Heater 82-F1601,
Stripper Reboiler 82-F1602 (2013)

56. Client Alon USA


Location Big Spring, TX
Project FIS-411: Engineering study of C-8 Reboiler Heaters 026-H-001
& 026-H-002 (2014)

57. Client Alon USA


Location Big Spring, TX
Project FIS-413: Catalytic Feed Preheater Evaluation (2014)

58. Client Total


Location Port Arthur, TX
Project FIS-414C: Engineering Study of 50H-01 Reactor Charge Heater
to Reduce Number of Burners (2017)
Highest Capacity - Longest Run Length - Maximum Profits
30
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

59. Client Plain Gas


Location Cotulla, TX
Project FIS-416: Performance Study of H821 Train 2 Hot Oil Heater
(2014)

60. Client LyondellBasell


Location Clinton, Iowa
Project FIS-417: Engineering Study for Tube Boilers LB-102 A&B
(2014)

61. Client CountryMark


Location Mount Vernon, IN
Project FIS-419: Capacity Improvement Study of Crude and Vacuum
Heaters (2014)

62. Client Mustang/ Ergon WVI


Location Newell. WV
Project FIS-421: Engineering Study of ------ (2014)

63. Client CH2E


Location Hudson. CO
Project FIS-422: Engineering Study for Pyrolisis Heaters (2014)

64. Client Qatar Gas


Location Doha, Qatar
Project FIS-423: NOx Reduction Study of Condensate Heater (81-
F1201) (2015)

65. Client Marathon Petroleum


Location Galveston, TX
Project FIS-424 Engineering Study for NOx Reduction of Hot Oil
Heater (B- 405) at Marathon Galveston Bay Refinery (2014)

66. Client Phillips 66


Location Lake Charles, LA
Highest Capacity - Longest Run Length - Maximum Profits
31
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

Project FIS-426 FCC Charge Heater H-6 Study (2015)

67. Client Safety Kleen


Location Newark, CA
Project FIS-431 Hot Oil Heater H-402

68. Client Phillips 66


Location Wood River, IL
Project FIS-432 DU1 Heater O2 Nozzles (2015)

69. Client Phillips 66


Location Sweeny, TX
Project FIS-436 Performance Improvement Study of Crude Heater
(25.1- F-1) (2016)

70. Client Frontier


Location El Dorado, KS
Project FIS-438 Capacity Improvement Study of Unifiner Charge
Heater (B1401) (2016)

71. Client Phillips 66


Location Wood River, IL
Project FIS-446 Performance Improvement Study of DU-1 F-301 & F-
302 Crude Heaters (2016)

72. Client CountryMark


Location Mount Vernon, IN
Project FIS-447 Capacity Improvement Study of FCC Feed Heater
(500-H101) (2016)

73. Client Phillips66


Location Wood River, IL
Project FIS-448 Engineering Study of Coker Heaters (H351-H1/H2)
(2016)

Highest Capacity - Longest Run Length - Maximum Profits


32
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

74. Client Marathon Petroleum


Location Galveston, TX
Project FIS-457 Engineering Study of Heaters (DDU-100 & 200) (2017)

75. Client Phillips66


Location Sweeny, TX
Project FIS-458 NOx Reduction & Capacity Improvement Study of
CCR Reformer (36-001/001A/001B/001C) (2017)

76. Client Marathon Petroleum


Location Galveston, TX
Project FIS-460 Platforming Heaters Sealing Study (12-1401 & 12-
1403) (2017)

77. Client Marathon Petroleum


Location Galveston, TX
Project FIS-461 Engineering Study of Platformer Heater (212-1401-
01/02/03) (2017)

78. Client Phillips66


Location Los Angeles, CA
Project FIS-470B SCR Design Review of HP-38 Hydrogen Reformer
Heater (2018)

79. Client Phillips66


Location Los Angeles, CA
Project FIS-478B FEL-3 Engineering Study for NOx Reduction in
Boiler #6 (2018)

80. Client Phillips66


Location Los Angeles, CA
Project FIS-479 FEL-3 Engineering Study for NOx Reduction in FCC
Unit (2018)

Highest Capacity - Longest Run Length - Maximum Profits


33
www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
List of Projects

81. Client Phillips66


Location Los Angeles, CA
Project FIS-480 FEL-3 Engineering Study for NOx Reduction in
Reboiler Heater (B-101) (2018)

82. Client PTT Global Chemical 6 Refinery


Location Rayong, Thailand
Project FIS-482 Capacity Improvement Study of High Vacuum Unit
Furnace (F-1101) (2019)

83. Client Marathon Petroleum


Location Catlettsburg Refinery, KY
Project FIS-483 Capacity Improvement Study of LPCCR Platformer
Heater (1-44-B-1/2/3/4) (2019)

84. Client Phillips66


Location Los Angeles, CA
Project FIS-494A/B/C FEL-2 Support Services for NOx Reduction in
Boiler #4, Boiler #8 and Rerun Feed Heater (90 B-202) (2019)

85. Client Phillips66


Location Wood River, IL
Project FIS-495 Steam System Study for CR-1 H-1 & H-2 Heaters
(2019)

86. Client Phillips66


Location Wood River, IL
Project FIS-497 Stack Evaluation Study for HCNHT F-1 Charge Heater
(2019)

Highest Capacity - Longest Run Length - Maximum Profits


34
www.heatflux.com

You might also like