Furnace Improvements Services
Organization Chart
Ashutosh Garg
(Vice-President)
Harmanpreet
Neeraj Singh www.heatflux.com
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
FIELD
SERVICES
» Energy Survey
» Safety Audits
REVAMPING » Furnace Audits
SERVICES
» Reliability Audits NEW HEATER
» Re-tubing Fired
Heaters » Combustion » Longer Run
Optimization Lengths
» Upgrading
Convection Section » Capacity Increases
» Heater Tuning & » Efficiency
Optimization Improvement
» NOx Reduction
OUR COMPANY
Maximize Profits by Revamping Fired Heaters
Furnace Improvements Services (FIS) est. 1996 in Sugar Land, TX.
For over 20 years now, FIS has provided engineering services to improve the
performance and efficiency of their fired heaters and boilers as well as help
reduce refinery NOx emissions. FIS has performed over 400 projects for clients
like Citgo, Valero, Phillips 66, Alon, Frontier, and Total.
Our vision is to be the ultimate technology provider for fired heaters and
boilers.
www.heatflux.com 1
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
OUR EXPERTISE
FIS revamp for refinery fired heaters includes: Crude, Vacuum, Catalytic Reformer, Hot
Oil, Coker Heaters, and CO boilers.
FIS provides complete turn-key services for the design, engineering, and supply of new
fired heaters to end users. Our designs are the most economical, efficient, and reliable.
Furnace Improvements has several patented technologies for improving the
performance of fired heaters. These patented technologies are aimed at improving
performance of existing fired heaters.
Technology Application
Split Flow Technology Increases capacity with limited process side pressure drop
Flue Gas Injection Reduces coking & tube metal temperatures
Inclined Firing System Reduces flame impingement and high tube metal temperatures
Spider Gas Tip Shorter flame gas burners
Stack Damper Provides Smooth Control of Heater Draft
We install burners at 5 – 7 angles away from the tubes with this burner
arrangement; a heater will have the following advantages:
▪ Lower Tube Metal Temperature
▪ Longer Tube Life
▪ Increased Heater Run Lengths
▪ Uniform Heat Transfer
▪ Lower Coking Rates
www.heatflux.com 2
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
[°F] In the Inclined firing case, temperature contours clearly show the reduction in the flue
gas temperature around the radiant tubes.
www.heatflux.com 3
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
High temperature
region is in the
centre of the
heater, flue gas
temperature near
7° Inclined Firing Case the radiant tubes is
reduced.
www.heatflux.com 4
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
Refinery Unit
Alon USA LP Reboiler Heaters H-102 & H-205
Citgo Twin Cell Crude Heater 11-H-01
CountryMark LLP DHT Charge Heater 210-H-100
Gladieux Processing Hot Oil Heater
Valero Crude Heater (in progress)
*Patent # US 7,484,478 B2
www.heatflux.com 5
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
*Patent # US 7,204,966 B2 B2
www.heatflux.com 6
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
CFD MODELING
At Furnace Improvements, we utilize CFD modeling to analyze problems and provide
solutions.
This tool enables us to study the existing design and operating conditions of heaters
and determine recommendations for solving any difficulties.
CFD gives a competitive edge over other analyses due to its visual presentation of the
observed conditions and proposed modification.
The following are a few areas where FIS has used this tool effectively:
Mixing (ammonia
Study Flow injection grid & Combustion Tube Heat transfer
flue gas (burner &
Mal-distribution recirculation mix heater design) Failures studies
box design)
CFD MODELING
Temperature contours (ºF) Base Case
www.heatflux.com 7
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
CFD MODELING
Temperature contours (ºF) Proposal Case
Cell Cell
Heater 1 Heater 2
www.heatflux.com 8
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
A B C D
(A) Model of Inclined Firing Technology applied to an 8 burner system
(B) Model of a vertical cylindrical heater with a common stack
(C) Model of a Naphtha Splitter Reboiler Heater
(D) Model of a Compressed Air Heater
REVAMPED HEATERS
Revamping fired heaters is a practical and effective way to improve heater
performance. This strategy focuses on working with existing components, and as
a result, capital investment and downtime are minimized.
www.heatflux.com 9
FURNACE IMPROVEMENT SERVICES
Maximize Profits by Revamping Fired Heaters
NEW HEATERS
Above Photos: New hot oil heater at Phillips 66 Wood River; FIS was responsible for
the design, engineering, procurement, and fabrication services on this project.
OUR CLIENTS
www.heatflux.com 10
Furnace Improvements Services
REFERENCE LIST
Email: info@heatflux.com
Web: www.heatflux.com
Furnace Improvements
Maximize Profits by Revamping Fired Heaters
1600 Highway 6, Suite 480
Sugar Land, TX 77478-4923
Tel: (281) 980-0325, Fax: 1-877-395-0760
Email: info@heatflux.com ; www.heatflux.com
1. Client Citgo
Location Corpus Christi, TX
Project FIS 183: No.4 Platformer Heater Efficiency Improvement using
Split Flow Convection and NOx Reduction
Scope of Work Design, Engineering, & Project Services for Installation of New
Convection Sections and New Low NOx Burners (2002)
Revamped Duty 194.46 MMBtu/hr
2. Client Valero
Location Texas City, TX
Project FIS-242: NHT and Platforming Heaters Capacity Increase with
Patented Split Flow Technology
Scope of Work Design, Engineering, & Project Services for New Split Flow
Convection Sections and Low NOx Burners (2007)
Revamped Duty 151.51 MMBtu/hr
3. Client Valero
Location Wilmington, CA
Project FIS-248: Platformer Heater Capacity Increase with patented
Split Flow Technology
Scope of Work Design, Engineering, & Project Services of New Split Flow
Convection Section (2008)
Revamped Duty 160.86 MMBtu/hr
7. Client Phillips 66
Location Roxana, IL
Project FIS-335: NOx Reduction & Capacity Increase of CR-3 Unit
Heaters (H-4 & H-5)
Scope of Work Design, Engineering & Supply of New Split Flow Convection
Section, Stack, Floor, Plenum and Ultra Low NOx Burners
(2010)
Revamped Duty 105.9 MMBtu/hr (H-4) and 97.8 MMBtu/hr (H-5)
8. Client HPCL
Location Mumbai, India
Project FIS-364B: Extract Recovery Heaters (F-201/3201/4201) and
Raffinate Recovery Heaters (F-202/3202/4202) in SEU Units
(SEU-I/II/III) Revamp
Scope of Work Design and Engineering for Capacity Increase in SEU Units -
Partially modified radiant section, completely new convection
and partially new stack (2012)
Revamped Duty 47.77 MMBtu/hr (Heaters in SEU I, II and III Units each)
2. Client Citgo
Location Corpus Christi, TX
Project FIS-356: Revamp of Crude Heater (11-H-01) (2012)
Scope of Work Design, Engineering for Inclined Burners (2010)
3. Client HPCL
Location Mumbai, India
Project FIS-364B: Extract Recovery Heaters (F-201/3201/4201) and
Raffinate Recovery Heaters (F-202/3202/4202) in SEU Units
(SEU-I/II/III) Revamp
Scope of Work Design and Engineering for Capacity Increase in SEU Units -
Partially modified radiant section, completely new convection
and partially new stack (2012)
Revamped Duty 47.77 MMBtu/hr (Heaters in SEU I, II and III Units each)
4. Client CountryMark
Location Mount Vernon, IN
Project FIS-367C: DHT Charge Heater (210-H100) Revamp - Capacity
Increase
Scope of Work Design, Engineering, Supply and Erection of New Radiant Shell
Extension Module, Convection Section and Stack (2014)
Revamped Duty 22.50 MMBtu/hr
6. Client Valero
Location Texas City, TX
Project FIS-428 H-16 Crude Heater Revamp with FIS Patented Inclined
Burners
Scope of Work Design, Engineering, and Supply of New burners, floor, and
plenum with FIS patented inclined burner arrangement, new FD
fan, Hot Air and Flue gas ducts (2016)
Revamped Duty 165.10 MMBtu/hr
1. Client Citgo
Location Corpus Christi, TX
Project FIS-247: Design, Engineering & Supply of a 40 MMBtu/hr
Combined Feed Heater (2005)
2. Client Phillips 66
Location Roxana, IL
Project FIS-269D: Design, Engineering & Supply of a 42.82 MMBtu/hr
Vacuum Heater (H-28) (2008)
4. Client Phillips 66
Location Roxana, IL
Project FIS-286B: Design, Engineering, Fabrication and Supply of a
165 MMBtu/hr Hot Oil Heater (2008)
6. Client Staatsolie
Location Paramaribo, Suriname
Project FIS-384: Design, Engineering, Supply of 8.82 MMBtu/hr
Visbreaker Charge Heater (2012)
2. Client Citgo
Location Corpus Christi, TX
Project FIS 183: No.4 Platformer Heater Efficiency Improvement using
Split Flow Convection and NOx Reduction
Scope of Work Design, Engineering, & Project Services for Installation of New
Convection Sections and New Low NOx Burners (2002)
Revamped Duty 194.46 MMBtu/hr
3. Client Phillips66
Location Roxana, IL
Project FIS 185: CFHT Efficiency Improvement and NOx Reduction
Scope of Work Design, Engineering, & Project Services for Installation of New
Convection Section and New Low NOx Burners (2002)
Revamped Duty 22.43 MMBtu/hr
4. Client Citgo
Location Corpus Christi, TX
Project FIS-187: Reboiler Trim Heaters Efficiency Improvement
Scope of Work Design, Engineering, & Project Services for Installation of New
Convection Section (2001)
Revamped Duty 15.14 MMBtu/hr
5. Client Phillips66
Location Roxana, IL
Project FIS 188: CCU1 CO Heater Convection Section Replacement
6. Client Premcor
Location Lima, OH
Project FIS 204: Crude Furnace NOx Reduction and Capacity Increase
Scope of Work Design, Engineering, Project Services for Revamping of Radiant
Section, Retubing of Convection Section and Installation of
Ultra Low NOx Burners (2004)
Revamped Duty 423.4 MMBtu/hr
8. Client Phillips 66
Location Ponca City, OK
Project FIS 210: NOx Reduction Project for Reformer Furnace (H-48)
Scope of Work Design, Engineering and Project Services for Installation of Low
NOx Burners (2003)
Revamped Duty 143.86 MMBtu/hr
Scope of Work Design, Engineering & Supply of New Transition Cone, Stack
and Platforms (2010)
Scope of Work Design, Engineering, CFD Modeling & Supply of New Gas
Burners in CCU-2 CO Boiler (2013)
Scope of Work Design, Engineering and Supply of New Radiant Hangers for
CR-1 H-1 & H-2 Heaters (2019)
ENGINEERING STUDIES
2. Client LyondellBasell
Location Houston, TX
Project FIS-128: Engineering Study of Crude Heaters (6-F-1 A/B)
3. Client LyondellBasell
Location Houston, TX
Project FIS-141: Tuning of Heaters
6. Client Phillips 66
Location Borger, TX
Project FIS-172: Engineering Study for Reducing Coking in a Crude
Heater
8. Client Phillips 66
Location Roxana, IL
Project FIS-185: Engineering Study for Design of a New Convection
section and Recommendations for Improved Performance of
CFHT Heater – Installation of Burners