Unit Trip Report: Unit No. - Outage No.

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Unit Trip Report

UNIT No. - OUTAGE NO. :

1. DATE OF TRIPPING :
2. TIME OF TRIPPING :
3. BEFORE UNIT TRIPPING:
a. Unit load :
b. Mills in service :
c. No. of oil guns in service :
d. No. of BFPs :
e. No. of CEPs :
f. No. of ID fans :
g. No. of FD fans :
h. No. of PA fans :
i. No. of CW Pumps :
j. Any other information :

4. First up protection acted:

5. Similar occurrences in last two financial years:


(Attach status of Recommendations / Action Plan of the previous trips)

6. Other relays / protections acted:


.

7. Supporting documents attached:


(SOE + PTL+ Alarm logs)
8. Any operation done prior to tripping:

Any operation carried out on concerned:


Equipment during the day/ previous
Shift may also be mentioned
9. Observations:

10. Remedial measures taken:

11. TIME /DATE OF

a). BOILER LIGHT- UP :

b). UNIT SYNCHRONISATION :


B-09/EEMG/01-R0
12. Problems / Constraints faced during restoration:

13. Recommendations / Action Plan ( if any):

14. Any specific Learning / Feedback:

15. Signature / Name/Date:

CONTROL ENGINEER SHIFT CHARGE ENGINEER HOD(OPERATION)

F-09/EEMG/01-R2