The document outlines the work breakdown structure (WBS) for a commercial construction project. It details the major project phases including general conditions, site work, foundations, structural work, floors and roof, masonry, building finishes, plumbing, electrical, HVAC, inspections, and final completion tasks. The WBS provides a hierarchical breakdown of the project into deliverables to help plan, execute, and track the project.
The document outlines the work breakdown structure (WBS) for a commercial construction project. It details the major project phases including general conditions, site work, foundations, structural work, floors and roof, masonry, building finishes, plumbing, electrical, HVAC, inspections, and final completion tasks. The WBS provides a hierarchical breakdown of the project into deliverables to help plan, execute, and track the project.
The document outlines the work breakdown structure (WBS) for a commercial construction project. It details the major project phases including general conditions, site work, foundations, structural work, floors and roof, masonry, building finishes, plumbing, electrical, HVAC, inspections, and final completion tasks. The WBS provides a hierarchical breakdown of the project into deliverables to help plan, execute, and track the project.
o General Conditions Receive notice to proceed and sign contract Submit bond and insurance documents Prepare and submit project schedule Prepare and submit schedule of values Obtain building permits Submit preliminary shop drawings Submit monthly requests for payment Site Grading and Utilities Clear and grub site Install underground utilities Install temporary power service Install exterior fire line and building fire riser Erect building batter boards and layout building o Foundations Excavate foundations Excavate elevator pit Form column piers and spread foundations Rough-in electric and plumbing in elevator Form elevator pit walls Pour column piers, foundations and walls Cure Strip forms Install pneumatic tube in elevator pit Prepare and pour concrete floor in elevator pit Steel erection Erect steel columns, beams and joist - 1st and 2nd floors Erect steel columns, beams and joist - 3rd floor and roof Install miscellaneous iron and bracing - 1st and 2nd floors Install miscellaneous iron and bracing - 3rd floor and roof Install stairs and miscellaneous iron railing Touch-up paint on steel o Form and Pour Concrete - Floors and Roof Install rebar and in-floor utilities (including mechanical, electrical, plumbing) Pour separate floors Cure separate floors Strip forms Form roof slab including all floor openings Install electrical underground Install plumbing underground Install rebar and in-floor utilities o Masonry Work Rough-in plumbing at toilets and masonry walls Lay masonry at core, mechanical, and toilets Install exterior masonry work Install roof drains Install tile in toilet rooms Roofing Install flashing at parapet walls Pour lightweight concrete roof fill Install seamless roofing material Spread stone ballast on seamless roof Set rooftop equipment o Building Finishes Install millwork and wood trim Paint walls and woodwork Install conduit at ceiling plenum space Install duct in ceiling plenum space Install ceiling grid Install ceiling tile Hang wallpaper Install building carpet Install hardware and accessories Complete interior and exterior sod and plantings Pave, curb, and stripe parking lot o Plumbing Rough-in plumbing in drywall walls Tie-in fire line riser and set valves Set plumbing fixtures and trim Flush, test, and clean piping and fixtures o Electrical Rough-in electrical in masonry walls Rough-in electrical in drywall walls Pull wire in conduit and set area transformers Install and terminate electrical devices Make electrical terminations for HVAC equipment Heating and Ventilating - AC Set equipment in mechanical room Rough-in mechanical in masonry walls Rough-in mechanical in drywall walls Install duct in building chase Install light fixtures - test and clean o Complete Final Inspections Complete elevator inspection and certification Perform architect's inspection Perform local building agency inspection Perform Fire Marshal's inspection Final Clean-up and Occupancy Install hard tile flooring in common areas Clean hard tile floors Remove debris from building and do final clean-up Substantial completion date Complete punch list items from all inspections