SCHEDULE OF LOADS AND COMPUTATIONS (Single Phase at 230 Volts)  

 
FIXTURES OUTLET   CIRCUIT BREAKER WIRE Conduit
Circuit
LOAD DESCRIPTION AC C. VOL
No. PINLIGHT LED TUBE E.O. VA AMP AT Poles
U O T
C1 LIGHTING   15       1500 230 6.52 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
C2 LIGHTING 2 13       1500 230 6.52 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
C3 LIGHTING 7 7       1400 230 6.09 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
C4 LIGHTING 4 8       1200 230 5.22 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
C5 POWER OUTLET       7   3780 230 16.4 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
C6 AIRCONDITION UNIT     1     1492 230 6.49 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
C7 AIRCONDITION UNIT     1     1492 230 6.49 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
C8 INCUBATOR         1 5000 230 21.7 30 2P 2-5.5 mm^2 THHN wire 3/4'' ø PVC pipe
C9 HATCHER         1 3750 230 16.3 30 2P 2-5.5 mm^2 THHN wire 3/4'' ø PVC pipe
C10 AIRCONDITION UNIT     1     1492 230 6.49 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
C11 AIRCONDITION UNIT     1     1492 230 6.49 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
C12 AIRCONDITION UNIT     1     1492 230 6.49 20 2P 2-3.5 mm^2 THHN wire 1/2'' ø PVC pipe
2- 38.0 mm^2 THW
MAIN 25590 230 111 125 2P 1 1/2'' ø RSC pipe
wire