X-Ray Tube-Stand: A. General Precautions
X-Ray Tube-Stand: A. General Precautions
44
MODULE 2.0
X-ray tube-stand
a. General precautions
Aim
● Electrical safety.
The aim is to provide routine maintenance procedures
i. In most installations the tube-stand power will
for the X-ray tube-stand, or suspension. The instruc-
come from the generator, but in some installa-
tions provided are for the floor ceiling tube stand. Most
tions, switching off the generator does not
of these procedures can also be applied to a ceiling
remove power from the tube stand.
mounted tube suspension. Repair procedures are pro-
ii. Before removing any covers, ensure the genera-
vided in module 7.0 page 99.
tor is switched off, and the room power isolation
(Note: Reference module page numbers refer to the
switch is also turned off.
title page.)
iii. This also applies if testing wiring connections, or
electrical components.
Objectives ● If removing an X-ray tube, or collimator.
i. See module 7.1 page 104, and module 7.2 page
On completion of this module, the student will be
110.
familiar with maintenance procedures for the X-ray
ii. Ask an electrician or electronics technician for
tube-stand. These procedures can be used as a version
assistance.
of quality control, together with the routine mainte-
iii. Do not rely on the vertical lock system.
nance check-sheets provided in the appendix.
iv. Attach a rope so that the system cannot move
Task 6, ‘X-ray tube-stand maintenance’, should be upwards, once the weight of the collimator or
attempted on completion of this module. X-ray tube is removed.
v. The X-ray tube is heavy. Removal or replacement
Contents requires two people.
vi. Make a diagram of electrical connections.
a. General precautions Attach labels to wires or high-tension cables.
b. Mechanical and electrical inspection This is to ensure correct connection when an
c. Tube-stand lateral centre X-ray tube or collimator is replaced.
d. Tube stand command arm, or panel vii. Place all screws or other small parts in a box,
so they are not lost.
Equipment required ● Do not place a ladder against a tube stand.The tube
stand may suddenly move.
■ Basic tool kit. ● An adjustment to any tube-stand bearing requires
■ X-ray alignment template. * skill, and good mechanical knowledge. When a
■ 24/30 cm cassette. problem is identified, request a mechanic, or
■ Aerosol spray lubricant. the service department, to make the required
■ Cleaning solvent. adjustments.
■ Cloth, for cleaning.
* The template is described in appendix ‘B’ page 169. b. Mechanical and electrical inspection
● Inspect for any loose panels or sections. Pay par-
ticular attention to the collimator and the control
panel.
E ● Check the tube-stand suspension, tracks and
bearings.
PART II. ROUTINE MAINTENANCE MODULES
45
i. With the X-ray tube set to minimum height, iii. Check electrical cables where they enter plugs
check the vertical suspension wire rope for and sockets, the outer insulation may be pulled
broken strands. CAUTION, do not test with bare back, exposing individual conductors.
fingers.Test by rubbing the cables up and down
with a piece of rag.
c.Tube-stand lateral centre
ii. With the vertical lock released, the X-ray tube
should balance in the vertical direction. It Lateral centring over the Bucky table should be
should need the same effort to move either up checked in both directions. In some cases this may be
or down. accurate only when approached from one direction.
iii. Check the action of the tube-stand bearings. i. Tape a thin piece of wire, or a paper clip, to the
Are there any visible gaps between the bear- centre of a 24/30 cm cassette. Place the cas-
ings and the track surface? sette in the Bucky.
iv. Are there any ‘clunking’ noises or ‘jerking’ ii. Position the X-ray tube to the lateral centre
movements, when the X-ray tube is positioned? position.
This can indicate damaged bearings. iii. Adjust the table top also to the lateral centre
v. Check the vertical guide rails. Look for loose position.
mounting screws. iv. Bring the collimator face to rest on the table-
vi. Spray the tube stand vertical guides and bear- top, and ensure it is flat against the tabletop.
ings with a light aerosol lubricant. Wipe down Then rise to 100 cm S.I.D.
afterward, so only a thin oil film is left on the v. As the collimator moves away from the table-
vertical guide rails. top, check that the light beam remains central
vii. Clean any accumulated dirt on and inside the to the tabletop. If not, adjust the tube angle
floor track. Spray the track and tube-stand a small amount so the light beam remains in
floor-bearings with a light aerosol lubricant. position.
Wipe off any excess. vi. If the tube-stand centre position appears incor-
viii. Look for loose mounting screws along the floor rect, this may need adjustment. Before adjust-
rail. ing, continue with the rest of these checks.
ix. Observe the position of the bearings on the vii. Place the X-ray alignment template on the
ceiling rail.These should be fully engaged along centre of the tabletop.
the full length of the rail. Check the rail is prop- viii. Adjust the light beam to the template markers.
erly fastened in place, and does not move. ix. Select a low kV and mAs, expose and develop
● Check for loose mechanical lock handles, and the film.
ensure manually operated locks have an adequate x. The radiation field should be centred to the
range of adjustment. template markers. If not, the collimator
● Test operation of the electromagnetic locks. There requires adjustment. This should be corrected
should be no hesitation in operation, nor should the before any adjustment to the tube-stand
lock ‘stick on’. In some cases the surface of the lock centre. See module 7.2 page 110.
will require cleaning, to obtain a better ‘grip’ when xi. The position of the template marker is com-
operated. pared to the wire marker on the cassette. This
● HT cables should be supported at the X-ray tube, to checks the tabletop centre accuracy. If not
minimize twisting or pulling at the cable end. correct, see module 8.0 page 121.
● Pay attention to the cabling from the X-ray tube and xii. If the tube stand centre is not correct, see
tube stand. Any movements of the system should module 7.0 page 99.
not cause any stress or stretching of the cables. ● After checking lateral centring to the table Bucky,
Nylon or plastic cable-ties should be used to secure check the centring to the wall Bucky.
loose cables, not sticking plaster. i. Keep the X-ray tube rotation in the trunnion
● Examine carefully all places where cables pass into rings at the same setting for the Table Bucky.
different sections of the tube-stand. ii. Bring the collimator close to, or up against the
i. Where the cables pass though holes in a metal wall Bucky. The light field should be centred to
cover, there should be protective inserts to avoid the Bucky-centre mark.
damaging the cable insulation. iii. Move the tube stand away from the Bucky to
ii. Look for possible damage to the outer insula- the distance normally used. The light beam
tion of electrical cables. should remain centred.
X-RAY EQUIPMENT MAINTENANCE AND REPAIRS WORKBOOK
46
iv. In case of a small error, a compromise adjust- ● Check all indicator lamps and switches for correct
ment of the tube rotation in the trunnion rings operation.
may be made. Otherwise, see module 7.0 page ● Check alignment of the Bucky centre light. (When
99, and module 8.0 page 121. fitted.)
● Ensure all labels are legible.
● With a tape measure, check for correct indication
d.Tube stand command arm, or panel
of the focal spot to Bucky distance. (FFD.)
● The X-ray tube trunnion-ring rotation-lock should ● Rotate the tube head and check the angulation
operate firmly, and prevent unwanted rotation. indicator operates smoothly and does not stick.
● Hand grips should not be loose. ● Clean and remove remains of sticking plaster, adhe-
● The indicator for tube angle should rotate smoothly, sive tape, etc.
and not hesitate before changing its position.
E
PART II. ROUTINE MAINTENANCE MODULES
47
TASK 6
The X-ray tube stand in room 1 is due for its maintenance check.
Carry out this check, using the maintenance checklist provided in appendix ‘D’ of this workbook as a guide.
Tutor’s comments
Satisfactory/Unsatisfactory
Signed Date
Tutor
X-RAY EQUIPMENT MAINTENANCE AND REPAIRS WORKBOOK
48
MODULE 2.1
X-ray tube
a. General precautions
Aim
● Before disconnecting any wires, or removing a
The aim is to provide routine maintenance procedures
cover, always ensure power is turned off and
for the X-ray tube. This includes techniques to improve
unplugged from the power point. If the equipment
the high-voltage performance or reliability of the X-ray
is part of a fixed installation, besides switching
tube. Fault diagnostic procedures are provided in
the generator power off, ensure the isolation power
module 7.1 page 104.
switch for the room is also switched off.
(Note: Reference module page numbers refer to the
● During the seasoning technique, make sure the col-
title page.)
limator is closed. Aim the X-ray tube away from the
X-ray control.
Objectives ● If a problem occurs during seasoning, stop. Depend-
ing on the symptoms, see module 7.1 page 104, or
On completion of this module, the student will be
module 7.3 page 117.
familiar with maintenance procedures for the X-ray
tube. These procedures can be used as a version of
quality control, together with the routine maintenance b. X-ray tube inspection
check-sheets provided in the appendix.
● Check rotation of the X-ray tube in the trunnion
rings. The locking device should hold the housing
Contents firmly in place, but allow free rotation on release.
● Ensure no attachments, such as a command arm
a. General precautions
control panel, or collimator, have become loose.
b. X-ray tube inspection
● Examine electrical cables to the X-ray tube. Ensure
c. X-ray tube ‘seasoning’
they are securely clamped into position, and not
subject to being pulled. Where cables pass into the
Equipment required housing, they should be protected from sharp edges.
■ Basic tool kit. ● Inspect the HT cables for any sign of damage to the
■ Cable ties. safety earth shield, at the X-ray tube cable ends.
● Ensure the HT cable ends are firmly inserted into the
X-ray tube, and the securing ring nut is not loose.
Note. In some systems there is a locking screw on
the side of the ring nut. Undo this screw first, and
then check the ring nut is fully tightened, then re-
fasten the locking screw. This check is most impor-
tant if the X-ray tube or cables have recently been
replaced.
● Where there is evidence of twisting or pulling on the
HT cables, particularly at the X-ray tube receptacle,
investigate means of providing additional support.
If necessary, contact the service department.
● Examine the X-ray tube housing for any oil leaks.
● At the generator, go into preparation, then release
E preparation without exposing. Listen to the anode
rotation for excessive noise.
PART II. ROUTINE MAINTENANCE MODULES
49
MODULE 2.2
X-ray collimator
a. General precautions
Aim
Whenever changing a collimator lamp, always ensure
The aim is to provide routine maintenance procedures
power is turned off and equipment unplugged from the
for the X-ray collimator. These maintenance sugges-
power point. If the equipment is part of a fixed in-
tions are for a standard collimator used on a standard
stallation, besides switching the generator power off,
tube-stand. Adjustment procedures are provided in
ensure the isolation power switch for the room is also
module 7.2 page 110.
switched off.
(Note: Reference module page numbers refer to the
title page.)
b. General maintenance
Objectives ● Check electrical cable to the collimator. Ensure the
cable entry is protected against sharp edges of
On completion of this module, the student will be
the collimator housing. Rotation of the collimator
familiar with maintenance and performance checks
should not stretch or pull the cable.
for the X-ray collimator. These procedures can be used
● Check the operation of the collimator blades. These
as a version of quality control, together with the
should stay in position when adjusted, and not slip
routine maintenance check-sheets provided in the
if the X-ray tube is repositioned. If adjustment of
appendix.
the clutch or brake is required, see module 7.2 page
Task 7,‘X-ray tube and collimator maintenance’, should 110. (Do not rely on adhesive tape to hold the knob
be attempted on completion of this module. in position.)
● Check the operation of the collimator lamp timer.
With clockwork systems, look for possible sticking
Contents
of the mechanism.
a. General precautions ● Evaluate the intensity of the light beam from the
b. General maintenance collimator. If too dim, see module 7.2 page 110.
c. Alignment tests ● Check the type of globe fitted, and make sure you
have a spare globe in stock. Note. Some globes may
Equipment required appear similar but have the filament in a different
position. See module 7.2 page 110.
■ Basic tool kit. ● The following precautions should be observed if
■ X-ray alignment template.* changing the globe.
■ 24/30 cm cassette. i. Ensure power to the generator and/or tube
■ Cloth, for cleaning. stand is turned off.
■ Detergent. ii. If a globe has just failed, wait for it to cool
down.
* The template is described in appendix ‘B’ page 169. iii. When unpacking and inserting a new globe, do
not handle it directly. Instead use a tissue or a
piece of cloth so your fingers do not touch the
globe. This is very important when handling
Quartz-Halogen globes.
E
PART II. ROUTINE MAINTENANCE MODULES
51
TASK 7
The X-ray tube and collimator in room 1 is due for its maintenance check.
Carry out this check, using the maintenance checklists provided in appendix ‘D’ of this workbook as a guide.
What is the X-ray tube model No? Serial No?
Focal spot sizes are; Broad focus. Fine focus.
Collimator model No? Serial No?
Examine carefully the HT cables as they enter the X-ray tube. Note, you will need to undo the retaining ring nut,
and slide back the cable support clamp.
Examine the collimator globe. How would you describe this globe if requesting a replacement? (Hint, look in the
parts manual)
Carry out tests for X-ray beam and light beam alignment. Is this correct for all rotation positions of the
collimator?
Tutor’s comments
Satisfactory/Unsatisfactory
E Signed Date
Tutor