Professional Documents
Culture Documents
SKTP 3513: Production Eng. Assignment 1
SKTP 3513: Production Eng. Assignment 1
Question 1
From an oil well test data in saturated oil reservoir as shown in Table 1, construct an inflow
performance relationship curve using Vogel and Fetkovich methods..
Question 2
Construct an inflow performance relationship curve and determine capacity of a saturated oil
well with high water cut produced 3000 BPD at flowing bottomhole pressure of 2000 psig and
3500 psig static bottomhole pressure.
Question 3
From a given flow test data of a well with flow efficiency of 80%, determine a well potential
and a well production rate when flowing bottomhole pressure equal to 1500 psig.
Question 4
A gas well at static bottomhole pressure of 3360 psia has a deliverability exponent of 0.651 and
flow coefficient of 0.2874 MSCFD/psia2, determine an absolute open flow of a well, construct a
well inflow performance curve, and show whether a well can produce or not 4000 MSCF/D at
flowing bottomhole pressure of 2750 psia.
-1-