Construction of Acid Proof Lining
Construction of Acid Proof Lining
IBIC/WI/C-05
1. Objective:
This work procedure narrates the guidelines for carrying out Construction of Acid Proof
Lining.
1. Applicability :
2. Reference Document:
3. A-Equipment:
3. B-Instrument:
4. Responsibility:
(i) The Principle Contractor shall be responsible for the overall implementation of this procedure.
(ii) All FE”s will collect the drg. From FDC released by Home Engineer Office for construction of
concern work. He will study the entire drg. Execution point of view and settled the query if any
through FQC/QAM/CM.
Raw Material shall meet as per IS Criteria & T.O.S or otherwise specified. All Test Records
shall be recorded in hard copy with consultants.
6. Surveying :
Surface Preparation :
Area for construction of Acid Proof Lining shall be leveled before execution.
If any undulation of R.C.C surface observed, require chipping to get required surface.
Cleaning shall be done by brush to remove dust partials.
After cleaning the surface shall be check by visual inspection at site.
Safety plan:
The execution area shall be barricaded with colored ribbon and sign board.
All labours should work with safety PPE’s (Safety shoes, Safety Google, Safety Gloves, Full
Body Harness in case of work at height, Safety Helmet etc).
As this is the specialized job, safety Talk (Tool Box Talk) shall be done before the execution
as well as once in a week for awareness of labours.
Scaffolding/Stagging shall be approved first to do work safely in case of work at height.
Cutting Tools shall be in healthy condition.
TBRA (Task Based Risk Assessment) shall be done if suggested before execution.
Inspection Records :
All records of spot levels shall be approved by IBIC and the same shall be maintained in the
register and it shall be transferred on a drawing.
RECORDS.
1 Level record
2 Testing Reports
3 Daily Progress report
4 Drawing file
5 Pour Card
6 Site Instruction