Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 16

Spread Sheet Developed By: Softwel (P) Ltd.

Design and Drawing of


Rural Water Supply Scheme

View
View Pipe
Pipe Data
Data

GPO Box 86, Kathmandu, Nepal


Goto Data Input
Phone : +977-1-4104307
Email : support@softwel.com.np Goto PD-Sample

Pipe Database Updated as per Nepal Standard For PN100 Pipe Series.
Last Updated : 2019/12/01
If any issue please contact at softwel.sanjog@gmail.com

Annex - I
DATA INPUT FORM
Spread Sheets Developed by SOFTWEL (P) Ltd.

Organization Government
Scheme Code
Scheme Name kafalkada
Name of the Community kada
Name of the Support Organization province Government
Location : Ward No.: 6
VDC : Sigas RM
District : Baitadi
Baitadi

SCHEME TYPE Gravity

SURVEY / DESIGN INFORMATION


District Pop Growth Rate (r) 1.35 % From District Growth Rates
Construction Period (n1) 3 years
Design Period (n) 20 years
Peak Factor 5 Factor
Per Capita Domestic Water Demand 45 l/d
Per Capita Water Demand for Students 10 l/d
Present Year ( Survey Year) 2019 AD
Base Year ( Project Completion Year) 2022 AD
Design Year 2042 AD
Minimum Flow Rate per Tap 0.05 lps
Table C.1 : Water Demand and Tap Flow Calculation Sheet

SCHEME NAME : kafalkada


SUPPORT ORGANIZATION :
LOCATION : WARD NO : 6 VDC : Sigas RM DISTRICT : Baitadi
Name of Community : kada
Required Datas:
Peak Factor: 5
Per Capita Demand : 45 lpcd
Per Capita Demand for Students: 10 lpcd Minimum flow rate 0.05 lps Create RVT Sheets

Description of Tap Population forecast Institutional Water Demand Total Tap Flow Calculation
Tap Cluster Name Ward Nos Present YearBase Year Design Year Total No. of Other Total Live Water Average Peak Peak Design Adjusted Remarks
No or No. of 2019 2022 2042 Domestic Pupil in Institutional Institutional Stock Demand Tap Flow Factor Flow flow Peak
Locality HH (P) (Po) (Pn) Demand School Demand Demand Demand factor
(Nos) (Nos) P(1+r)^n1 P(l+r)^(n1+n) (lpd) (Nos) (lpd) (lpd) (lpd) (lpd) (lps) (Factor) (lps) (lps) (lps)
[1] [2] [2-1] [3] [4] [5] [6] [8] [9] [10] [11] [11-1] [12] [13] [14] [15] [16] [17] [18]
RVT1
1 Gaira 6 5 30 32 41 1,845 1,845 0.02 5.00 0.11 0.11 5.00
2 pelchiura 6 7 42 44 58 2,610 2,610 0.03 5.00 0.15 0.15 5.00
3 Sunkuda 6 15 90 94 123 5,535 5,535 0.06 5.00 0.32 0.32 5.00
4 dhalkana 6 4 24 25 33 1,485 1,485 0.02 5.00 0.09 0.09 5.00
5 kada gaun 6 20 120 125 164 7,380 7,380 0.09 5.00 0.43 0.43 5.00
6 Veradhar 6 4 24 25 33 1,485 1,485 0.02 5.00 0.09 0.09 5.00
7 Veradhar 2 6 2 12 13 17 765 765 0.01 5.00 0.05 0.05 5.56
8 Punadhar 6 9 54 57 74 3,330 3,330 0.04 5.00 0.20 0.20 5.00
9 healthpost tole 6 4 24 25 33 1,485 300 500 3,500 4,985 0.06 5.00 0.29 0.29 5.00
sub total 70 420 440 576 25,920 300 500 3,500 - 29,420 0.34 1.70 1.71

RVT2

1 Cluster 1 6 4 24 25 33 1,485 1485 0.02 5 0.09 0.09 5


2 Cluster 2 6 5 35 37 48 2,160 2160 0.03 5 0.13 0.13 5
3 Cluster 3 6 12 80 84 109 4,905 4,905 0.06 5.00 0.29 0.29 5.00
sub total 21 139 146 190 8,550 - - - - 8,550 0.10 0.50 0.50

Grand Total 91 559 586 766 34470 300 500 3500 37970 0.44 2.20 2.20 0.00
NOTE : 1 Peak factor of 3 has been adopted
2 Design Tap Flow has been adjusted for the Peak flow by rounding off to nearest 0.01lps.
3 If flow is less than 0.05 lps then it has been adjusted to 0.05 lps and if flow is greater than 0.25 lps provide additional tapstand.
Table C.2 : Reservoir Tank Sizing
Government
SCHEME NAME : kafalkada
LOCATION : WARD NO : 6 VDC : Sigas RM DISTRICT : Baitadi

a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 70
a.3 Average Design Demand to be Supplied through Reservoir 0.341 l/s = 29420.000 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.500 l/s

a.5 Adjusted/Optimized supply to Reservoir from Source 0.400 l/s = 34560.0 l/day
a.6 Total Design Flows of all Standposts : 1.705 l/s
c) Reservoir sizing assuming Intermittent System (Optional)

Maximum Required supply hours based on Supply from Source 5.63 hours
Maximum Required supply hours based on Demand 4.79 hours
Adopted hours of Supply 5.00 hours
Recommended Supply Hours and Period
First Shift 5:00 AM To 7:59 AM
Second Shift 5:00 PM To 7:00 PM

Time Period Hours Cum. Inflow Cum. Con- Surplus Deficit


From To In Out (lt) sumption (lt) (lt) (lt)
5:00 AM 7:59 AM 3.00 3.0 4320 18414 14094
7:59 AM 5:00 PM 9.00 0.0 17280 18414 1134
5:00 PM 7:00 PM 2.00 2.0 20160 30690 10530
7:00 PM 5:00 AM 10.00 0.0 34560 30690 3870

Max Deficit 14094 lt = 14.09 cum


Provide Reservoir Capacity of 15.00 cum
c) Recommended Reservoir Size

Recommended Size for RVT 01 = #VALUE! cum Time to Fill the RVT #VALUE! Hr
Table C.2 : Reservoir Tank Sizing
Government
SCHEME NAME : kafalkada
LOCATION : WARD NO : 6 VDC : Sigas RM DISTRICT : Baitadi

a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 8
a.3 Average Design Demand to be Supplied through Reservoir 0.341 l/s = 29420.000 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.400 l/s

a.5 Adjusted/Optimized supply to Reservoir from Source 0.250 l/s = 21600.0 l/day
a.6 Total Design Flows of all Standposts : 1.705 l/s
b) Reservoir sizing assuming Continuous System using Consumption Patterns

Time Period Hours Water Cummu. Cummu. Surplus Deficit


From To Consumption Supply Demand
(%) (lt) (lt) (lt) (lt)
5:00 AM 7:00 AM 2 25.0% 1800 7355 5555
7:00 AM 12:00 PM 5 35.0% 6300 17652 11352
12:00 PM 5:00 PM 5 20.0% 10800 23536 12736
5:00 PM 7:00 PM 2 20.0% 12600 29420 16820
7:00 PM 5:00 AM 10 0.0% 21600 29420 7820

Maximum Deficit 16820 lt


Minimum required Reservoir capacity 16.82 cum
Provide Reservoir of capacity 17.00 cum 58% of Average Demand
Check if Reservoir gets filled during night (7:00 PM - 5:00 AM)
Volume of water collected during night 9.00 cum

35000

30000

25000

20000

15000

10000

5000

0
09:36 AM

02:24 PM

09:36 AM
12:00 AM

04:48 AM

07:12 PM

12:00 AM

04:48 AM

Supply Demand

c) Reservoir sizing assuming Intermittent System (Optional)

Maximum Required supply hours based on Supply from Source 3.52 hours
Maximum Required supply hours based on Demand 4.79 hours
Adopted hours of Supply 5.00 hours
Recommended Supply Hours and Period
First Shift 5:00 AM To 7:59 AM
Second Shift 5:00 PM To 7:00 PM

Time Period Hours Cum. Inflow Cum. Con- Surplus Deficit


From To In Out (lt) sumption (lt) (lt) (lt)
5:00 AM 7:59 AM 3.00 3.0 2700 18414 15714
7:59 AM 5:00 PM 9.00 0.0 10800 18414 7614
5:00 PM 7:00 PM 2.00 2.0 12600 30690 18090
7:00 PM 5:00 AM 10.00 0.0 21600 30690 9090

Max Deficit 18090 lt = 18.09 cum


Provide Reservoir Capacity of 19.00 cum
c) Recommended Reservoir Size

Recommended Size for RVT 01 = #VALUE! cum Time to Fill the RVT #VALUE! Hr
Table C.2 : Reservoir Tank Sizing
Government
SCHEME NAME : kafalkada
LOCATION : WARD NO : 6 VDC : Sigas RM DISTRICT : Baitadi

a) Scheme Information
a.1 Reservoir Tank No: 1
a.2 Served Standposts 1 to 21
a.3 Average Design Demand to be Supplied through Reservoir 0.099 l/s = 8550.000 l/day
a.4 Available Minimum flow from the Source (Safe Yield) 0.200 l/s

a.5 Adjusted/Optimized supply to Reservoir from Source 0.100 l/s = 8640.0 l/day
a.6 Total Design Flows of all Standposts : 0.495 l/s
c) Reservoir sizing assuming Intermittent System (Optional)

Maximum Required supply hours based on Supply from Source 4.85 hours
Maximum Required supply hours based on Demand 4.80 hours
Adopted hours of Supply 5.00 hours
Recommended Supply Hours and Period
First Shift 5:00 AM To 7:59 AM
Second Shift 5:00 PM To 7:00 PM

Time Period Hours Cum. Inflow Cum. Con- Surplus Deficit


From To In Out (lt) sumption (lt) (lt) (lt)
5:00 AM 7:59 AM 3.00 3.0 1080 5346 4266
7:59 AM 5:00 PM 9.00 0.0 4320 5346 1026
5:00 PM 7:00 PM 2.00 2.0 5040 8910 3870
7:00 PM 5:00 AM 10.00 0.0 8640 8910 270

Max Deficit 4266 lt = 4.27 cum


Provide Reservoir Capacity of 5.00 cum
c) Recommended Reservoir Size

Recommended Size for RVT 01 = 4.00 cum Time to Fill the RVT 11.11 Hr
PIPELINE DESIGN Sheet No. : 8 of 16

(HYDRAULIC CALCULATIONS)
Pipe Class abbreviation HC Soil Code GMS OS
MC (Ctrl+a for using solver) HR BMS
SCHEME NAME : kada SOURCE NAME : Kafal SAFE YEILD : 0.50 DI Run
Run Macro
Macro HereHere
SR MR
LOCATION : WARD NO : VDC : DISTRICT : CI Ctrl
Ctrl ++ ee HS SS
HS Steel

S. Pipe Line Length Design Direction Reduced Level Level New Total Max. PIPE USED Friction Head Residual Flow Hydraulic Gradient L Soil
(UL/UR
No. Dis. / Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm)(kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)

Intake to DC
1 IN p1 650 715 0.500 DR 1944.00 1918.00 26.00 1944.00 26.00 26.00 50 6.0 44.90 0.0335 2.78 23.22 0.32 1944.00 1941.22 BMS
2 p1 p2 445 489.5 0.500 DR 1918.00 1863.00 55.00 1944.00 78.22 81.00 50 10.0 42.00 0.0334 2.57 75.65 0.36 1941.22 1938.65 BMS
3 p2 3 600 660 0.500 DR 1863.00 1795.00 68.00 1944.00 143.65 149.00 50 16.0 37.80 0.0331 5.96 137.69 0.45 1938.65 1932.69 BMS
4 P3 DC 300 330 0.500 DR 1795.00 1784.00 11.00 1944.00 148.69 160.00 50 16.0 37.80 0.0331 2.98 145.71 0.45 1932.69 1929.71 BMS
DC to RVT 1
1 DC P4 300 330 0.400 DR 1784.00 1770.00 14.00 1784.00 14.00 14.00 50 10.0 42.00 0.0348 1.17 12.83 0.29 1784.00 1782.83 BMS
2 P4 RVT1 360 396 0.400 DR 1770.00 1755.00 15.00 1784.00 27.83 29.00 40 10.0 33.50 0.0342 4.18 23.65 0.45 1782.83 1778.65 BMS
DC to RVT 2
1 DC P5 400 440 0.100 D 1784.00 1720.00 64.00 1784.00 64.00 64.00 25 16.0 18.70 0.0427 6.64 57.36 0.36 1784.00 1777.36 BMS
2 P5 RVT2 400 440 0.100 D 1720.00 1660.00 60.00 1784.00 117.36 124.00 25 16.0 18.70 0.0427 6.64 110.72 0.36 1777.36 1770.72 BMS
RVT1 to Dhalkana (P8)
1 RVT1 P6 300 330 0.560 D 1755.00 1700.00 55.00 1755.00 55.00 55.00 50 6.0 44.90 0.0329 1.51 53.49 0.35 1755.00 1753.49 BMS
2 P6 P7 150 165 0.410 DL 1700.00 1640.00 60.00 1755.00 113.49 115.00 50 16.0 37.80 0.0342 1.04 112.45 0.37 1753.49 1752.45 BMS
3 P7 P8 200 220 0.090 D 1640.00 1600.00 40.00 1755.00 152.45 155.00 25 16.0 18.70 0.0435 2.84 149.61 0.33 1752.45 1749.61 BMS
RVT1 to Gaira (P9)
1 RVT1 P9 150 165 0.110 DL 1755.00 1700.00 55.00 1755.00 55.00 55.00 25 16.0 18.70 0.0418 3.01 51.99 0.40 1755.00 1751.99 BMS
RVT1 to J1 BMS
1 RVT1 J1 20 22 1.060 DR 1755.00 1745.00 10.00 1755.00 10.00 10.00 63 6.0 56.70 0.0298 0.10 9.90 0.42 1755.00 1754.90 BMS
J1 to P12
1 J1 P9 160 176 0.570 D 1745.00 1690.00 55.00 1755.00 64.90 65.00 50 10.0 42.00 0.0326 1.17 63.73 0.41 1754.90 1753.73 BMS
2 P9 P10 100 110 0.570 D 1690.00 1660.00 30.00 1755.00 93.73 95.00 50 10.0 42.00 0.0326 0.73 93.00 0.41 1753.73 1753.00 BMS
3 P10 BPT1 100 110 0.140 D 1660.00 1600.00 60.00 1755.00 153.00 155.00 25 16.0 18.70 0.0400 3.12 149.88 0.51 1753.00 1749.88 BMS
4 BPT1 P11 150 165 0.140 D 1600.00 1570.00 30.00 1600.00 30.00 30.00 25 16.0 18.70 0.0400 4.68 25.32 0.51 1600.00 1595.32 BMS
5 P11 P12 160 176 0.050 D 1570.00 1500.00 70.00 1600.00 95.32 100.00 20 16.0 14.90 0.0482 2.44 92.88 0.29 1595.32 1592.88 BMS
J1 to P14
1 J1 P13 200 220 0.490 DR 1745.00 1690.00 55.00 1755.00 64.90 65.00 40 10.0 33.50 0.0330 3.47 61.43 0.56 1754.90 1751.43 BMS
2 P13 P14 100 110 0.290 DR 1690.00 1655.00 35.00 1755.00 96.43 100.00 32 10.0 26.70 0.0357 2.03 94.40 0.52 1751.43 1749.40 BMS
RVT2 to J2
PIPELINE DESIGN Sheet No. : 9 of 16

(HYDRAULIC CALCULATIONS)
Pipe Class abbreviation HC Soil Code GMS OS
MC (Ctrl+a for using solver) HR BMS
SCHEME NAME : kada SOURCE NAME : Kafal SAFE YEILD : 0.50 DI Run
Run Macro
Macro HereHere
SR MR
LOCATION : WARD NO : VDC : DISTRICT : CI Ctrl
Ctrl ++ ee HS SS
HS Steel

S. Pipe Line Length Design Direction Reduced Level Level New Total Max. PIPE USED Friction Head Residual Flow Hydraulic Gradient L Soil
(UL/UR
No. Dis. / Diff. Static Head Static HDPE G.I. Factor Loss Head Velocity Type
From To Actual Design Q DL/DR) From To Level Available Pressure O.D. Class I.D. N.B. Class From To Remarks
(m) (m) (lps) (L/R/U/D) (m) (m) (m) (m) (m) (m) (mm)(kg/cm²) (mm) (mm) (m) (m) (m/s) (m) (m)
[0] [1] [2] [3] 0 [5] (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25)

1 RVT2 J2 30 33 0.550 D 1660.00 1640.00 20.00 1660.00 20.00 20.00 50 6.0 44.90 0.0329 0.15 19.85 0.35 1660.00 1659.85 BMS
J2 to P15
1 J2 P15 300 330 0.090 DR 1640.00 1600.00 40.00 1660.00 59.85 60.00 25 16.0 18.70 0.0435 4.26 55.59 0.33 1659.85 1655.59 BMS
J2 to P17
1 J2 P16 300 330 0.360 DL 1640.00 1600.00 40.00 1660.00 59.85 60.00 40 10.0 33.50 0.0348 2.94 56.91 0.41 1659.85 1656.91 BMS
2 P16 P17 400 440 0.230 DL 1600.00 1570.00 30.00 1660.00 86.91 90.00 32 10.0 26.70 0.0373 5.26 81.65 0.41 1656.91 1651.65 BMS
Pipe Line Estimate
Transmission Distribution Length
CODE Type Nominal Dia/Outer Dia Class ND Code SD Code PipeCode Transmission Distribution
GP-1 G.I. Pipe 1/2" - 15mm 15-MC-TL 15-MC-DL GPM-15 - -
GP-2 G.I. Pipe 3/4" - 20mm 20-MC-TL 20-MC-DL GPM-20 - -
GP-3 G.I. Pipe 1" - 25mm 25-MC-TL 25-MC-DL GPM-25 - -
GP-4 G.I. Pipe 1-1/4" - 32mm 32-MC-TL 32-MC-DL GPM-32 - -
GP-5 G.I. Pipe 1-1/2" - 40mm 40-MC-TL 40-MC-DL GPM-40 - -
GP-6 G.I. Pipe 2" - 50mm 50-MC-TL 50-MC-DL GPM-50 - -
GP-7 G.I. Pipe 2-1/4" - 65mm 65-MC-TL 65-MC-DL GPM-63 - -
GP-8 G.I. Pipe 3" - 80mm 80-MC-TL 80-MC-DL GPM-80 - -
GP-9 G.I. Pipe 3-1/2" - 100mm 100-MC-TL 100-MC-DL GPM-100 - -
GP-10 G.I. Pipe 1/2" - 15mm 15-HC-TL 15-HC-DL GPH-15 - -
GP-11 G.I. Pipe 3/4" - 20mm 20-HC-TL 20-HC-DL GPH-20 - -
GP-12 G.I. Pipe 1" - 25mm 25-HC-TL 25-HC-DL GPH-25 - -
GP-13 G.I. Pipe 1-1/4" - 32mm 32-HC-TL 32-HC-DL GPH-32 - -
GP-14 G.I. Pipe 1-1/2" - 40mm 40-HC-TL 40-HC-DL GPH-40 - -
GP-15 G.I. Pipe 2" - 50mm 50-HC-TL 50-HC-DL GPH-50 - -
GP-16 G.I. Pipe 2-1/4" - 65mm 65-HC-TL 65-HC-DL GPH-63 - -
GP-17 G.I. Pipe 3" - 80mm 80-HC-TL 80-HC-DL GPH-80 - -
GP-18 G.I. Pipe 3-1/2" - 100mm 100-HC-TL 100-HC-DL GPH-100 - -

HPA-3 HDP Pipe 20 16 kg/cm² 20-16-TL 20-16-DL HP16-20 - 160.00


HPA-4 HDP Pipe 25 16 kg/cm² 25-16-TL 25-16-DL HP16-25 800.00 900.00
HPA-3 HDP Pipe 32 16 kg/cm² 32-16-TL 32-16-DL HP16-32 - -
HPA-4 HDP Pipe 40 16 kg/cm² 40-16-TL 40-16-DL HP16-40 - -
HPA-5 HDP Pipe 50 16 kg/cm² 50-16-TL 50-16-DL HP16-50 900.00 150.00
HPA-6 HDP Pipe 63 16 kg/cm² 63-16-TL 63-16-DL HP16-63 - -
HPA-7 HDP Pipe 75 16 kg/cm² 75-16-TL 75-16-DL HP16-75 - -
HPA-8 HDP Pipe 90 16 kg/cm² 90-16-TL 90-16-DL HP16-90 - -
HPA-9 HDP Pipe 110 16 kg/cm² 110-16-TL 110-16-DL HP16-110 - -
HPA-10 HDP Pipe 125 16 kg/cm² 125-16-TL 125-16-DL HP16-125 - -
HPA-11 HDP Pipe 140 16 kg/cm² 140-16-TL 140-16-DL HP16-140 - -
HPA-12 HDP Pipe 160 16 kg/cm² 160-16-TL 160-16-DL HP16-160 - -
HPA-13 HDP Pipe 180 16 kg/cm² 180-16-TL 180-16-DL HP16-180 - -
HPA-14 HDP Pipe 200 16 kg/cm² 200-16-TL 200-16-DL HP16-200 - -
HPA-15 HDP Pipe 225 16 kg/cm² 225-16-TL 225-16-DL HP16-225 - -
HPA-16 HDP Pipe 250 16 kg/cm² 250-16-TL 250-16-DL HP16-250 - -
HPA-20 HDP Pipe 50 6 kg/cm² 50-6-TL 50-6-DL HP6-50 650.00 330.00
HPA-21 HDP Pipe 63 6 kg/cm² 63-6-TL 63-6-DL HP6-63 - 20.00
HPA-22 HDP Pipe 75 6 kg/cm² 75-6-TL 75-6-DL HP6-75 - -
HPA-23 HDP Pipe 90 6 kg/cm² 90-6-TL 90-6-DL HP6-90 - -
HPA-24 HDP Pipe 110 6 kg/cm² 110-6-TL 110-6-DL HP6-110 - -
HPA-25 HDP Pipe 125 6 kg/cm² 125-6-TL 125-6-DL HP6-125 - -
HPA-26 HDP Pipe 140 6 kg/cm² 140-6-TL 140-6-DL HP6-140 - -
HPA-27 HDP Pipe 160 6 kg/cm² 160-6-TL 160-6-DL HP6-160 - -
HPA-28 HDP Pipe 180 6 kg/cm² 180-6-TL 180-6-DL HP6-180 - -
HPA-29 HDP Pipe 200 6 kg/cm² 200-6-TL 200-6-DL HP6-200 - -
HPA-30 HDP Pipe 225 6 kg/cm² 225-6-TL 225-6-DL HP6-225 - -
HPA-31 HDP Pipe 250 6 kg/cm² 250-6-TL 250-6-DL HP6-250 - -
HPA-36 HDP Pipe 32 10 kg/cm² 32-10-TL 32-10-DL HP10-32 - 500.00
HPA-37 HDP Pipe 40 10 kg/cm² 40-10-TL 40-10-DL HP10-40 360.00 500.00
HPA-38 HDP Pipe 50 10 kg/cm² 50-10-TL 50-10-DL HP10-50 745.00 260.00
HPA-39 HDP Pipe 63 10 kg/cm² 63-10-TL 63-10-DL HP10-63 - -
HPA-40 HDP Pipe 75 10 kg/cm² 75-10-TL 75-10-DL HP10-75 - -
HPA-41 HDP Pipe 90 10 kg/cm² 90-10-TL 90-10-DL HP10-90 - -
HPA-42 HDP Pipe 110 10 kg/cm² 110-10-TL 110-10-DL HP10-110 - -
Transmission Distribution Length
CODE Type Nominal Dia/Outer Dia Class ND Code SD Code PipeCode Transmission Distribution
HPA-43 HDP Pipe 125 10 kg/cm² 125-10-TL 125-10-DL HP10-125 - -
HPA-44 HDP Pipe 140 10 kg/cm² 140-10-TL 140-10-DL HP10-140 - -
HPA-45 HDP Pipe 160 10 kg/cm² 160-10-TL 160-10-DL HP10-160 - -
HPA-46 HDP Pipe 180 10 kg/cm² 180-10-TL 180-10-DL HP10-180 - -
HPA-47 HDP Pipe 200 10 kg/cm² 200-10-TL 200-10-DL HP10-200 - -
HPA-48 HDP Pipe 225 10 kg/cm² 225-10-TL 225-10-DL HP10-225 - -
HPA-49 HDP Pipe 250 10 kg/cm² 250-10-TL 250-10-DL HP10-250 - -
HPA-51 HDP Pipe 32 12.5 kg/cm² 32-12.5-TL 32-12.5-DL HP12.5-32 - -
HPA-52 HDP Pipe 40 12.5 kg/cm² 40-12.5-TL 40-12.5-DL HP12.5-40 - -
HPA-53 HDP Pipe 50 12.5 kg/cm² 50-12.5-TL 50-12.5-DL HP12.5-50 - -
HPA-54 HDP Pipe 63 12.5 kg/cm² 63-12.5-TL 63-12.5-DL HP12.5-63 - -
HPA-55 HDP Pipe 75 12.5 kg/cm² 75-12.5-TL 75-12.5-DL HP12.5-75 - -
HPA-56 HDP Pipe 90 12.5 kg/cm² 90-12.5-TL 90-12.5-DL HP12.5-90 - -
HPA-57 HDP Pipe 110 12.5 kg/cm² 110-12.5-TL 110-12.5-DL HP12.5-110 - -
HPA-58 HDP Pipe 125 12.5 kg/cm² 125-12.5-TL 125-12.5-DL HP12.5-125 - -
HPA-59 HDP Pipe 140 12.5 kg/cm² 140-12.5-TL 140-12.5-DL HP12.5-140 - -
HPA-60 HDP Pipe 160 12.5 kg/cm² 160-12.5-TL 160-12.5-DL HP12.5-160 - -
HPA-61 HDP Pipe 180 12.5 kg/cm² 180-12.5-TL 180-12.5-DL HP12.5-180 - -
HPA-62 HDP Pipe 200 12.5 kg/cm² 200-12.5-TL 200-12.5-DL HP12.5-200 - -
HPA-63 HDP Pipe 225 12.5 kg/cm² 225-12.5-TL 225-12.5-DL HP12.5-225 - -
HPA-64 HDP Pipe 250 12.5 kg/cm² 250-12.5-TL 250-12.5-DL HP12.5-250 - -

TOTAL LENGTH 3,455.00 2,820.00

HDP Pipe Length 3,455.00 2,820.00


GI Pipe Length - -
Total 3,455.00 2,820.00

Grand Total 6,275.00


Salient Features ( Schemewise ) of Project

1 Name of Project CBWSS


2 Name of VDC VDC
3 Wards Covered 8, 9 9
Number of scheme Scheme - 1 Scheme - 2
Khadgadera & Tallo
Name of Scheme Setipokhari Khadgadera
A. Household/Population
1 Households (Survey Year : 2007) No. 61 21
2 Population (Survey Year : 2007) No. 343 118
3 Households (Survey Year : 2008) No. 61 21
4 Population (Survey Year : 2008) No. 355 123
5 Households (Survey Year : 2028) No. 85 29
6 Population (Survey Year : 2028) No. 480 166
7 Design Period Yrs. 20 15
8 Annual growth rate % 1 2
B. Source Information
1 Source Name Lamakhola Lamakhola
2 Source Type & Number Type/No. Stream / 1 Stream / 1
Tapped Discharge source - 1 Lps - -
3 Tapped Discharge source - 2 Lps 0.2 ( Lamakhola )
4 Approximate Distance from Project Site km 1 1
5 Water Quality of Source Good Good
C. Water provision & Demand
1 Provision for Domestic use lpcd 21,600.00 7,470.00
3 Provision for Institutional use lpcd
2 Provision for Live Stock Yes/No No No
3 Total Water Demand (Design Year) Lpd 21,600 7,470
D. Project Components
1 Actual Length of Transmission Main km 3 -
2 Actual Length of Distribution Pipe Line km 2 1
3 Total Number of Public Stand Post No. 13 4
4 Number of Private Connection Provided No. No No
5 Reservoir Number/ Capacity m³ / no 4, 5 m³ x 1 3 m³ x 1
6 Total Number of DC, IC, VC & AVC No. 9.00 1.00
7 Crossing No. 4.00 1.00
8 Number of Institutional Latrine No. 0 0
E. Project Cost Data
1 Total Estimated Cost NRs. 1,517,834 416,267
2 Average Per Capita Cost at Base Year (E1/A4) NRs. 4276 3384
3 Average Per Capita Cost at Design Year (E1/A6) NRs. 3162 2508
4 Total O/M Cost at Base Year NRs.
5 Total O/M Cost at Design Year NRs.
6 Total O/M Cost per HH per Month NRs.
7 Monthly Household Income NRs.
8 Total O/M Cost as % of Monthly HH Income (E6/E7)*100 %
9 Community Contribution Amount as per Estimate NRs. 241,195 70,552
10 Community Contribution as per % of Estimate % 16 17
11 Number of WUSC Members/VMW No. 9/2 9/2
ewise ) of Project

CBWSS
VDC
8 5, 6 5, 6, 8, 9
Scheme - 3 Scheme - 4 Total
Indredanda Extention of
Rehabilitation Sallikot Scheme

68 84 234
381 471 1313
69 85 236
394 489 1361
95 117 326
533 659 1838
15 15 65
2 2 7

Mangrakhola Mangrakhola
Stream / 2 Stream / 1
- - 0
0.2 ( Lamakhola ) 0.20
1 1 4
Good Good Good

23,985.00 29,655.00 82710


3,500.00 3500
No No No
27,485 29,655 86210

2 1 6
4 2 9
6 6 29
No No No
12 m³ x 1 14 m³ x 1 5
7.00 9.00 26
2.00 2.00 9
1 1 2

1,233,187 #N/A #N/A


3130 #N/A #N/A
2314 #N/A #N/A
0
0
0
0
315,345 207,171 834263
26 #N/A #N/A
9/2 9/2 0

You might also like