A TOTEM
1 Disconnect electricals; examine integrity of sign structure safely; item
Take down existing totem using appropriate equipment/craneage
and transport to Total Storage Facility at Brighton Beach. Each
vertical column should be removed independently to avoid
damage to person or property.
2 Supply and install totem base adapter as directed by Engineer. item
Include provision for modification to existing concrete base if X
necessary.
3 Assemble, erect using appropriate craneage, and install new 6.5m item
T-Air Monopod with LED Price Display including all necessary
electrical installation and surge protection/voltage regulator. Test
and commission totem and price sign
4 Assemble, erect using appropriate craneage, and install new 9m T-
Air Monopod with LED Price Display including all necessary
X
electrical installation and surge protection/voltage regulator.. Test
and commission totem and price sign
5 Provisional sum for the construction of new totem base item
C SIGNAGE
1 Remove old directional signs and transport to warehouse. Replace no.
with T-Air directional signs X
2 Install new T-Air directional signs 1.00 no.
3 Install Signage on Canopy Columns - No Smoking / No Open 40.00 no.
Flame / Shut Off Your Engine / No Cell Phone
4 Install Filling Position Number panels on canopy columns 10.00 no.
D SHOP FASCIA
1 Carefully remove shop fascia panels and related signage and
transport to Total Warehouse NPW X
2 Install White RAL9010 Shop Fascia Panels incl. all necessary m
supporting equipment X
3 Install Shop Entrance Totem 1.00 ea.
4 ea.
Install "bonjour" signage above shop main entrance including circuit
X
to sub-panel box as required and all necessary electrical installation
5 Install "café bonjour" signage including new circuit and all necessary
X
electrical installation
6 Install square dustbins 1.00 no.
7 Install address wording on building X
8 To replace existing awning with teak grey awning X item
9 Install poster boards X item
Shop Fascia Sub-total carried to Summary -
E FORECOURT EQUIPMENT
1 Remove garbage bins on pump island and in front of shop and item
dispose
2 Install T-Air standard low service units 3.00 no.
3 Install non-illuminated fuel arch / simplified fuel arch 3.00 no.
TOTAL JAMAICA LTD
TAIR RETROFIT 2021 - LEVEL R3
BILL NO. 4- HWT CLOCK TOWER
4 Install Pierhead Protection with red banner and fill with clean
washed sand X
5 Remove and dispose of existing sandbox 1.00 no.
6 Install TOTAL T-Air Sandbox 2.00 no.
7 Construct plinth and install 'Air' Pump Station Arch 1.00 item
8 Install illuminated Diesel Spreader Box including all necessary item
electrical installation X
G MISCELLANEOUS
1 Include sum for handling (stripping and unloading of 40' container) sum
and storage of equipment at secure location
MEASURED WORKS
Item Description Amount
A Totem
B Canopy
C Signage
D Shop Fascia
E Forecourt Equipment
G Miscellaneous -