TAIR Epping Programme 2021 - Bill of Quantity5
TAIR Epping Programme 2021 - Bill of Quantity5
TAIR Epping Programme 2021 - Bill of Quantity5
8 Clean all associated guttering on canopy and repair or replace 1.00 sum
defective sections.
9 Remove all old stickers (incl. warning decals and product decals) item
and paint canopy columns with Sherwin Williams White Enamel
Paint or approved equivalent
C SIGNAGE
1 Install new T-Air directional signs X no.
2 Install Signage on Canopy Columns - No Smoking / No Open 16.00 no.
Flame / Shut Off Your Engine / No Cell Phone
3 Install Filling Position Number stickers on canopy columns 4.00 no.
D SHOP FASCIA
1 Install Shop Entrance Totem 1.00 ea.
2 Install "bonjour" signage on sunscreen above shop main entrance ea.
including circuit to sub-panel box as required and all necessary X
electrical installation
3 Install square dustbins X - no.
4 Install address wording on building X item
5 Install poster boards X item
Shop Fascia Sub-total carried to Summary -
TOTAL JAMAICA LTD
TAIR RETROFIT 2020 - LEVEL R4
BILL NO. 5 - TEMPLE HALL
E FORECOURT EQUIPMENT
1 Remove garbage bins on pump island and in front of shop item
2 Install square dustbins on pump island 2.00 no.
3 Install product information panel 4.00 no.
4 Install Pierhead Protection with red banner and fill with clean X no.
washed sand
5 Remove existing sandbox 2.00 no.
6 Install TOTAL T-Air Sandbox 2.00 no.
7 Construct plinth and install 'Air' Pump Station Arch X item
8 Install illuminated Diesel Spreader Box including all necessary X item
electrical installation
G MISCELLANEOUS
1 Include sum for handling (stripping and unloading of 40' container) sum
and storage of equipment at secure location
MEASURED WORKS
Item Description Amount
A Totem
B Canopy
C Signage
D Shop Fascia
E Forecourt Equipment
G Miscellaneous -