Current Transformer E-238B: Pre-Commissioning Check Sheet
Current Transformer E-238B: Pre-Commissioning Check Sheet
ELECTRICAL Sheet 1 of 2
CURRENT TRANSFORMER REV 5
PROJECT PROJECT WBS
DESCRIPTION No.
SUB-SYSTEM
SUB-SYSTEM No.
DESCRIPTION
TAG
TAG No.
DESCRIPTION
A. INDENT/CONTRACT No:
LOCATION: SYSTEM/PURPOSE:
SWITCHBOARD/EQUIPMENT NO: FEEDER/CIRCUIT:
MANUFACTURER:
CT SERIAL NO: TYPE: DRAWING NO:
CT RATIO: VA: CLASS:
TAG NO:
Initialed by
B. INSPECTION/TEST Contractor and Date
PDO
3. Check and ensure that the wiring is cleated and core marking is correct.
5. Test and record the insulation resistance between phase and earth (M).
7. Ratio Check:
SUB-SYSTEM
SUB-SYSTEM No.
DESCRIPTION
TAG
TAG No.
DESCRIPTION
R-ph
Y-ph
B-ph
R-ph
Y-ph
B-ph
R-ph
Y-ph
B-ph
Note:
1. Earth connections must be removed before test.
C. REMARKS / OBSERVATIONS: