URC Construction (P) Ltd

Pre-Monsoon Checklist

Project: Infinity-HYD 111 Date:

S.NO. Check Point Status Remarks


1 Check all the Drain maintenance
Check whether all Electricity connections Water
2 proof joints, Exposed Boards Etc. protected from
monsoon emergencies
3 Check the Lightening Protection
Check the precautions taken for Low level areas to
4
minimize or avoid water accumulation
5 Hardening of access / Egress and internal roads.

6 Roof Leakages
Fall / Fly of plywood, G.I. Sheets and other materials
7
at higher elevations due to heavy wind.
Special precautions to the storages of the chemicals
8
those who react with water.
9 Pallets for the material storages
Pumps arrangements for the emergency drain outs
10
Etc.
Check stability of mobile crane/tower crane to
11
prevent any collapse or tilting
Check the possibility of Fly of dust and sandy particles
12 during heavy wind condition which may obstruct the
visibility and hit workers visibility.
Check the possibilities of Site and property immersing
13 in the water accumulated due to rain and surface run
off.
Electrocution and electrical machineries immersing in
14
the water
Check the possibilities of Fire hazards due to short
15
circuit.
Safety precautions for severity of electrocution due to
16 increase in humidity.
Check the status of lightning arresters for tower
17 cranes and other needed locations.
URC Construction (P) Ltd
Pre-Monsoon Checklist

18 Check the condition of anemometer

19 Check whether Emergency team is active at the site

20 Status of emergency preparedness

21 Status of trainings given for emergency evacuation


Check whether the site management fully aware of
22
the action to be taken in case of emergencies
Check is there an effective communication facility
23
available for emergencies.
Check all the cables are routed overhead and proper
24
anchored & will be stable in case of heavy winds
Check all the ELCBs/ MCBs checked & records
25
available.
Check the stacking of material is above the ground
26
level to avoid sinking in water
Check whether the staircases are with temporary
27
hand rails and with proper illumination
Check all the emergency evacuation routes are free
28
from obstructions
Is the monsoon action plan explained to all in the
29
project sites?

Pl adds some more points to suit your project requirement & use an additional sheet if
necessary.

Precautionary Measures Action By


If any other inclusion of water point is identified the point shall be Site In charge & EHS
immediately plugged in immediately on the decision of the Site In charge Officer
and HSE Officer.
The effective working of the diversion dykes shall be inspected before and EHS Personnel
after of every rain.

Contractor Signatures/Name/date: ………………. /…………………………………………./……………………

URC Reviewed and


Accepted ………………. Rejected ……… ….

Signature/date/Time………………………………………. Designation……………….