The document provides a monthly equipment maintenance schedule for a multi-tester located in the practical work area. It outlines 9 activities to be completed by trainers and trainees including calibrating the multimeter daily, protecting it from dust and moisture, changing the battery weekly if needed, ensuring circuits are powered off before checking resistance, and selecting voltage ranges to avoid overloading. Inspections are to check calibration, protection from elements, battery functionality, polarity checking, and condition of test prods.
The document provides a monthly equipment maintenance schedule for a multi-tester located in the practical work area. It outlines 9 activities to be completed by trainers and trainees including calibrating the multimeter daily, protecting it from dust and moisture, changing the battery weekly if needed, ensuring circuits are powered off before checking resistance, and selecting voltage ranges to avoid overloading. Inspections are to check calibration, protection from elements, battery functionality, polarity checking, and condition of test prods.
The document provides a monthly equipment maintenance schedule for a multi-tester located in the practical work area. It outlines 9 activities to be completed by trainers and trainees including calibrating the multimeter daily, protecting it from dust and moisture, changing the battery weekly if needed, ensuring circuits are powered off before checking resistance, and selecting voltage ranges to avoid overloading. Inspections are to check calibration, protection from elements, battery functionality, polarity checking, and condition of test prods.
The document provides a monthly equipment maintenance schedule for a multi-tester located in the practical work area. It outlines 9 activities to be completed by trainers and trainees including calibrating the multimeter daily, protecting it from dust and moisture, changing the battery weekly if needed, ensuring circuits are powered off before checking resistance, and selecting voltage ranges to avoid overloading. Inspections are to check calibration, protection from elements, battery functionality, polarity checking, and condition of test prods.
EQUIPMENT CODE EIM0015 LOCATION Practical work area Schedule for the Month of June ACTIVITIES MAN- Daily Every Weekly Every Monthly Remarks POWER Other 15th Day Day 1. Calibrate the Trainer/ Done before multimeter at trainees ✓ and after frequent intervals. every use 2. Protect the Trainer/ Done before instrument from trainees ✓ and after dust, fumes, every use moisture and heat. 3. Change/replace Trainer/ Done before the ohmmeter trainees ✓ and after battery (if every use necessary needed) 4. When checking the Trainer/ ✓ resistance of the trainees Done before circuit, make sure and after the switch off the every use power to the circuit. 5. Start with the Trainer/ ✓ highest range of trainees measurement and Done before move down and after successively every use prevent overloading of the water. 6. Ensure the polarity Trainer/ Done before of the circuit trainees ✓ and after before connecting. every use 7. Make all resistance Trainer/ Done before readings in the trainees ✓ and after uncrowded portion every use on the scale. 8. Choose the Trainer/ ✓ Done before voltmeter range trainees and after Date Developed: Document No. ELECTRICAL June 2021 INSTALLATION Issued by: Page AND Compiled by: MAINTENANCE Timothy John N. Mandia NC II Revision # such that the total resistance of the voltmeter should be at least 100 every use times the resistance of the circuit under test. 9. Select the range Trainer/ such that the trainees Done before deflection falls in ✓ and after the upper half of every use the scale. It will give high accuracy.
Date Developed: Document No.
ELECTRICAL June 2021 INSTALLATION Issued by: Page AND Compiled by: MAINTENANCE Timothy John N. Mandia NC II Revision # Blank Template No. 4 : EQUIPMENT MAINTENANCE INSPECTION CHECKLIST
Equipment Type : Multi-Tester
Property Code/Number: EIM0015 Location : Practical Work Area Person-In-Charge : Timothy John N. Mandia Inspected by : Georg Simon Ohm Date of Inspection : 07/01/2021
YES NO INSPECTION ITEMS
✓ Did you calibrate the multimeter at frequent intervals?
✓ Did you protect the instrument from dust, fumes, moisture and heat? ✓ Did you check the functionality, if it doesn’t turn on? ✓ Did you check the battery of the ohmmeter? ✓ Did you ensure the polarity of the circuit before connecting? ✓ Did you check if there are no open wire on the test prod?
Date Developed: Document No.
ELECTRICAL June 2021 INSTALLATION Issued by: Page AND Compiled by: MAINTENANCE Timothy John N. Mandia NC II Revision #