CHECKLIST FOR KERBSTONE WORKS

Location / Identification:

Drawing No.:

No. Description YES NO N/A

1 Safety precautions are taken before commence the work.

2 There is sufficient material to perform work at the site.

3 Kerbs are stored properly at the site.

4 Field compaction is passed.

5 Setting out is carried out for formwork and foundation concrete.

6 Foundation concrete is casted and cured properly.

7 Alignment and top level of kerb is checked.

8 Kerbstone is installed properly.

9 Backing concrete is casted and cured properly.

Remarks:

THE ABOVE ACTIVITIES WHERE CHECK AND COMPLIES WITH THE REQUIREMENT

Construction Representative QA/QC Representative PMC Representative

Name:
Name: Name:

Signature:
Signature: Signature:

Date:
Date: Date:

TIP - QP - 001
APPENDIX F:

CHECKLIST FOR SURVEY ACTIVITIES

Location / Identification:

Drawing No.:

No. Description YES NO N/A

1 Survey equipment calibration

2 Determining the application point.

3 Establishing of control points for alignment, elevation and slopes.

4 Compliance with relevant Drawings.

5 Setting out of the existing utilities

6 Filling layer thickness.

Remarks:

THE ABOVE ACTIVITIES WHERE CHECK AND COMPLIES WITH THE REQUIREMENT

Construction Representative QA/QC Representative PMC Representative

Name:
Name: Name:

Signature:
Signature: Signature:

Date:
Date: Date: