Professional Documents
Culture Documents
Perhitungan Volume Beton Dan Pembesian
Perhitungan Volume Beton Dan Pembesian
08 / 3 PJJ
DENAH JEMBATAN
2,0 m 4m 2,0 m
B
0,3 m
A A A
4,0 m 3 m
0,3 m
BB
TAMPAK SAMPING
Pengaman Jembatan
Tembok Pengaman Tiang sandaran
(Pipa Galvanis )
C 0,75
M.A.Normal
1,0 m
DETAIL C
16 O 12
0.30 m 0.50 m
O 10 - 12,5
E
Angkur
0.25 m
0.5 m
0.50 m
0.5 m 0.25 m
HENDRI WICAKSONO / 1801411022 / NO. 08 / 3 PJJ
Plat Lantai
6 O 16 O 10 -15 O 10 - 10 (Cor beton 1:2:3)
0,20m
0,50m
6 O 16
0.25m 0,25 m Balok Diafragma 0.25m Balok Utama
(Cor beton 1:2:3) (Cor beton 1:2:3)
O 10 - 10
PONDASI TELAPAK
KOLOM PERKUATAN ABUTMEN
SKALA 1 : 20
O 10 - 20
O 10 - 20
2.75M
L
8 - O 16
O 10- 10
O 10- 15 8 - O 16
A
1.0M
POTONGAN A - A POTONGAN B - B
PENULANGAN BALOK
DIAFRAGMA
6 O 16 4 - O 16
O 10- 15
0,20 m 0,20 m O 8- 15
0.50m
0.25m
8 - O 16
0,30 m 0,30 m
O 8- 10
0
8 O 16 8 - 0 16
0.25m 0.20m
0.25m
HENDRI WICAKSONO / 1801411022 / NO. 08 / 3 PJJ
A PEKERJAAN JEMBATAN
1 Pekerjaan Galian Tanah
1.1. Galian Tanah
Bangun 1 Panjang = 3,00 m
1,00 m Tinggi = 1,50 m
Lebar 1 = 1,80 m
Volume = ( L xT ) xP = 8,10 M3
3,75m
1 1,25
1,5 m
3,75m 2
1,80 m
0,15 m 0,15 m
Bangun 3 Panjang = 3,00 m
Lebar = 0,75 m
Tinggi = 0,75 m
Jumlah bangun = 2,00 bh
Volume = ((L1 x T) x P x Jlh
= ((.0,50 x 0,75) x 4,00 x 2 bh = 4,50 M3
b. Tembok Pengarah
Panjang = 1,00 m
Lebar = 0,30 m
1,0 m
Tinggi = 1,00 m
Jumlah bangun = 4,00 bh
Volume = (( L x T ) x P ) x Jlh
1,0 T
L
c. Lantai Bawah Plat Jembatan Panjang = 4,00 m
Lebar = (2*0,37)+(2*1,0) = 2,74 m2
Volume = (P x L) = 10,96 M2
Panjang = 4,00
Lebar Bersih = 2,25 (= 3m - ( 3 x lebar balok ) )
3m Tebal = 0,20
0,2 m
Volume = (0.20x2,25)x4,0 = 1,80 M3
4,0 m
0,25
0,5
0,25
HENDRI WICAKSONO / 1801411022 / NO. 08 / 3 PJJ
1,4 m
Tinggi = 1,40 m
Lebar = 0,15 m
T T
Tebal = 0,15 m
L Jumlah = 12 bh
Volume = ( 0,15 x 0,15 ) x 1,4 x 12 = 0,38 M3
TOTAL VOLUME COR BETON BERTULANG = 2,48 M2
3.2. Pek. Penulangan
a. Penulangan Plat Lantai
Tulangan Memanjang Ø 12
Panjang = 2(a)+b+c = 624 cm = 6,24 m
c
Jumlah = (300/15)+1 21 Alur
ba c
2
= 22 Ujg
O = 12 - 15
Tulangan Melintang Ø 12
O = 12 - 10 O = 12 - 20
1 = 3 Panjang = 2(a)+d = 360 cm = 3,6 m
Jumlah = (400/20)+1 21 Alur
d = (31 x 2) x 3,6 = 223,2 m = 223 / 12 = 18,60 Ujg
1
e h e
b f g g 2 = 19 Ujg
a d
3 2 Panjang = 2a+2b+2e+4f+2g+h 446 cm = 4,46 m
a = 7,5 e = 83
Ket : Jumlah = (400/20)+1 31 Alur
b = 15 f = 17
c = 595 g = 48 = (31 x 1) x 4,5 138 m = 138 /12 = 11,52 Ujg
d = 345 h = 71 12 Ujg
4 O 16
6 - O 16
O 8 - 10 8 - O 16 O 8 - 15
Tulangan Memanjang O 16
140 140 Panjang = (2x10)+(2x140)+(2x40)+290 = 670 cm = 6,7 m
10 290
1. 40 Jumlah = 2 Alur 3 Balok = (6,7 x 2)x3 = 40 m
= 183 Ujg
25 50
50
25
4,0 m
Total Volume Besi O 8 mm = 9 Ujung
Total Volume Besi O 10 mm = 196 Ujung
Total Volume Besi O 12 mm = 18 Ujung
Total Volume Besi O 16 mm = 6,7 Ujung