Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Drawing of 20M High mast lighting system

SCOPE:
The scope of this specification covers the manufacture, transport, installation, testing and commissioning
of the complete High Mast lighting system, using Raising and Lowering type of Towers Light assembly,
including the Civil Foundation Works. The foundation is to be done under supervision of expert civil
engineer by the agency. Minimum size of RCC foundation has been given. The expert civil engineer may
consider same or higher specification with same price, considering soil strength. No extra payment will be
made.

Page 25 of 53
ANEXTURE: IV
Drawing of High mast foundation

Page 26 of 53
Detail Work Specification of High mast foundation

Sl.
Total
No Description Unit No L B H Qty.
Qty.
.
Earth work in excavation for
foundation of structures as per
drawing and technical specification
including setting out, removing,
spreading or stacking of spoils
within a lead of 150 m as directed
and including trimming the sides of
the trenches, levelling, dressing and
ramming the bottom, complete as
1 per direction of the Engineer-in-
M3
Charge.

(a) Depth of excavation not


1.00 2.50 2.50 1.50 9.38 9.38
exceeding 1,500 mm.
(b) Depth of excavation for
additional depth beyond 1,500 mm.
1.00 2.50 2.50 0.98 6.09 6.09
and upto 3,000 mm. but not
requiring shoring.
Ordinary cement concrete
M15(1:2:4) with graded stone
chips (20 mm down) excluding
2 shuttering and reinforcement if M3 1 2.50 2.50 0.075 0.469 0.47
any in ground floor. As per IS 456-
2000

Hire and labour charges for


Shuttering with or without staging
upto 4.0 m height using approved
stout props with wooden planks/ply
wood/steel sheetplate with required
bracing for any kind of plain
orreinforced concrete works in all
sorts of minor structure including
culvert, box culvert, cross-drain etc.
The rate is inclusive of fitting, fixing
3 and striking out after completion of M2 13.79
work as per specification and
direction. 4 2.5 0.075 - 0.75

4 2.40 0.40 - 3.84


4 2.30 1.00 - 9.20
Total 13.79

Page 27 of 53
Reinforcement for reinforced
concrete work in the all sorts of
structures including distribution
bars, stirrups, binders etc. including
supply of rods, initial straightening
and removal of loose rust (if
necessary) cutting to requisite
length, hooking and bending to
correct shape, placing in proper
MT 0.203 0.203
position and binding with 16 gauge
black annealed wire at every inter
section complete as per drawing
4 and direction.
a) for works in foundation,
basement and upto roof of ground
floor/upto 4 m
.(i) Tor steel/Mild Steel
I. RINL
Raft 12 mm dia 150 centre to centre 64 x 2.4 = 153.6 mtr @0.89
(both ways, top & bottom) 1 =0.137
16 x 2.69 = 43.04
Column 12 mm dia (vertical bar)
1 mtr@0.89=0.038

16 x 4.4=70.40
Ring 8 mm dia
1 mtr@0.395=0.028
Nominal Mix – M20 (1:1.5:3)
cement concrete with graded stone
chips (20 mm size) including
shuttering and reinforcement if any
5 ground floor. M3 4.60
Raft 1 2.40 2.40 0.4 2.30
1 1.00 1.00 2.3 2.30
Total 4.60
Earth work in filling in foundation
trenches or plinth with good earth,
in layers not exceeding 150 mm.
including watering and ramming etc. 25% of excavation
6 layer by layer complete. (Payment
M3
25/100 x 15.47=3.867 cum
3.867 3.867
to be made on the basis of
measurement of finished quantity of
work)

Page 28 of 53

You might also like