TECHNICAL SPECIFICATION FOR ELECTRICAL

EXECUTION / CAIET DE SARCINI PENTRU EXECUTIA


LUCRARILOR ELECTRICE

Issued for construction /


03 11.2018
Emis pentru construire Grigore Mocanu Oprea
Constantin Cristian Mircea
Revised with Petrom
Grigore Mocanu Oprea
02 10.2018 comments / Revizuit cu
Constantin Cristian Mircea
comentarii Petrom
Issued for review / Grigore Mocanu Oprea
01 07.2018
Emis pentru verificare Constantin Cristian Mircea
Rev. Prepared Checked Approved
Date Description
No. Intocmit Verificat Aprobat
Data Descriere
Originator/Autori

TECHNICAL SPECIFICATION FOR ELECTRICAL EXECUTION / CAIET DE


SARCINI PENTRU EXECUTIA LUCRARILOR ELECTRICE

Doc. No.: PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B Rev.: 03

Page
Project Title / Titlul proiectului: Project no.
no.:

SURFACE EQUIPPING FOR WELLS


1387, 1388,1389, 1390 MORENI ROPEP18320386
ECHIPARE DE SUPRAFATA 233/5587 1 of 18
PENTRU SONDELE 1387, 1388, 1389,
1390 MORENI
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 2 of 18

Revision No. / Reason for Revision / Date /


Revizia nr. Motivul reviziei Data

01 Issued for review / Emis pentru verificare 07.2018

Revised according to VN 26508 / Revizuit conform VN


02 10.2018
26508

03 Issued for construction / Emis pentru construire 11.2018


SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 3 of 18

TABLE OF CONTENTS / CUPRINS

1. GENERAL DATA / DATE GENERALE ...............................................................................................................4


1.1. PROJECT NAME / DENUMIREA LUCRĂRII : ..............................................................................................4
1.2. LOCATION / AMPLASAMENT :....................................................................................................................4
1.3. PARTS USED IN PREPARATION OF DOCUMENTATION / ELEMENTE CARE STAU LA BAZA
ÎNTOCMIRII DOCUMENTAłIEI: ...........................................................................................................................4
2. TECHNICAL SPECIFICATION / SPECIFICAłIA TEHNICĂ...............................................................................4
2.1. FEATURES OF NEW CONSUMER / CARACTERISTICILE NOULUI CONSUMATOR ....................................4
2.2. CHARACTERISTICS OF DU DRIVING MOTOR / CARACTERISTICILE UNITATII DE ANTRENARE .............4
3. CONSTRUCTIVE SOLUTIONS ADOPTED / SOLUłII CONSTRUCTIVE ADOPTATE .....................................5
3.1. DESIGNED OHTS 400 KVA – 20/0,42 KV / PTA 400 KVA – 20/0,42 KV PROIECTAT ................................5
3.2. POWER SUPPLY WELLS 1390, 1389, 1388, 1387 MORENI / ALIMENTARE CU ENERGIE ELECTRICA
A SONDEI 1390, 1389, 1388, 1387 MORENI ...........................................................................................................5
3.3. POWER AND LIGHTING SYSTEM / INSTALAłIE ELECTRICA DE FORTA SI ILUMINAT .............................6
4. EARTHING SYSTEM / INSTALAłIA DE LEGARE LA PĂMÂNT ....................................................................11
5. SAFETY MEASURES / MĂSURI DE PROTECłIE ...........................................................................................12
6. REQUIREMENTS FOR TESTS AND CHECKS / CERINłELE EFECTUĂRII PROBELOR ŞI
VERIFICĂRILOR ........................................................................................................................................................12
7. TECHNICAL REQUIREMENTS / CONDIłII TEHNICE .....................................................................................13
6.1. QUALITY OF MACHINERY AND EQUIPMENT / CALITATEA UTILAJELOR ŞI ECHIPAMENTELOR...........13
6.2. NORMS, REGULATIONS, STANDARDS AND PHILOSOPHIES APPLICABLE TO THE PROJECT / NORME,
NORMATIVE, STANDARDE ŞI FILOZOFII APLICABILE PROIECTULUI .............................................................14
7. OMV PETROM NORMS AND PHILOSOPHIES / NORME ŞI FILOZOFII PETROM OMV .............................15
8. MAINTENANCE REQUIREMENTS / CERINTE PENTRU INTRETINERE .......................................................15
9. SPECIAL REMARKS / PRECIZĂRI SPECIALE ...............................................................................................15
PROGRAM FOR QUALITY CONTROL OF WORKS DURING THE EXECUTION/ PROGRAM PENTRU
CONTROLUL CALITĂłII ÎN TIMPUL EXECUłIEI....................................................................................................16

ATTACHMENTS / ANEXE :
Program FOR Quality control OF works during the execution/ Program pentru controlul calităŃii în
timpul execuŃiei;
PU-D-ROPEP18320386_6_9-DE-EL-SLD-001-01-B sh. 1 - Single-line diagram well 1390 / Schema
electrica monofilara sonda 1390;
PU-D-ROPEP18320386_6_9-DE-EL-SLD-001-01-B sh. 2 - Single-line diagram well 1389 / Schema
electrica monofilara sonda 1389;
PU-D-ROPEP18320386_6_9-DE-EL-SLD-001-01-B sh. 3 - Single-line diagram well 1388 / Schema
electrica monofilara sonda 1388;
PU-D-ROPEP18320386_6_9-DE-EL-SLD-001-01-B sh. 4 - Single-line diagram well 1387 / Schema
electrica monofilara sonda 1387;
PU-D-ROPEP18320386_6_9-DE-EL-SLD-001-01-B sh. 5 - Single-line diagram distribution box /
Schema electrica monofilara cutie distributie;
PU-D-ROPEP18320386_6_9-DE-EL-DLP-001-01-B - Earthing Layout / Plan legare la pamant;
PU-D-ROPEP18320386_6_9-DE-EL-CRP-001-01-B sh.1 - Power supply / Alimentare cu energie
electrica;
PU-D-ROPEP18320386_6_9-DE-EL-CRP-001-01-B sh.2 - Cable overhead line routing / Trasee de
cabluri electrice.
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 4 of 18

1. GENERAL DATA / DATE GENERALE

1.1. Project Name / Denumirea Lucrării :


SURFACE EQUIPPING AND FLOWLINES ECHIPARE DE SUPRAFATA SI CONDUCTE
WELLS 1387,1388,1389,1390 MORENI AMESTEC SONDELE 1387,1388,1389,1390
MORENI

1.2. Location / Amplasament :


Moreni oil area, Dambovita County. Zona petrolierăMoreni, judeŃul Dambovita

1.3. Parts Used in Preparation of Documentation / Elemente care stau la baza întocmirii
documentaŃiei:
• design contract; • contractul de proiectare;
• scope of work received from beneficiary; • tema de proiectare transmisă de beneficiar;
• Layout plan of asset site location; • planul de situaŃie cu amplasamentul obiectivului;
• topographic measurements; • măsurătorile topo;
• Data collected in the field. • datele culese din teren.

2. TECHNICAL SPECIFICATION / SPECIFICAłIA TEHNICĂ

2.1. Features of new consumer / Caracteristicile noului consumator


Supply voltage for wells Tensiunea de alimentare pentru sondele
1387,1388,1389,1390MORENIshall be 0,4 KV; 1387,1388,1389,1390 MORENI va fi 0,4 KV
• Frequency: 50 Hz. • FrecvenŃa: 50 Hz.
• Installed power: • Puterea instalată:
- PU motors = 4x55kW / 220 KW; - motor U.P. = 4x55 kW / 220kW;
- lighting of wells bunds = 8x125 W/230V - iluminat careu sonde = 8x125 W /
230 V

2.2. Characteristics of DU driving motor / Caracteristicile unitatii de antrenare

Type of DU motor shall be asynchronous, short- Tipul motorului de antrenare va fi asincron, cu


circuited rotor, supplied at 0,4 kV a.c. voltage. rotorul în scurtcircuit, alimentat la tensiunea de
0,4 kV c.a.
Nominal motor current shall be In=99 A , with Curentul nominal al motoarelor va fi de In=99 A
frequency converter. pentru fiecare sonda, având pornire prin
convertizoare de frecvenŃă.
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 5 of 18

3. CONSTRUCTIVE SOLUTIONS ADOPTED / SOLUłII CONSTRUCTIVE ADOPTATE

3.1. DESIGNED OHTS 400 KVA – 20/0,42 KV / PTA 400 KVA – 20/0,42 KV PROIECTAT
Dwg. no. / doc. PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 sh. 1, sh.2
It shall be located according to drawing PU-D- Se va amplasa conform planului de situatie PU-D-
ROA06183201017-DE-EL-CRP-002 layout ROA06183201017-DE-EL-CRP-002 construit pe 1
supplay built on 1 reinforced concrete made pole, stâlp din beton armat de tipul SC 15014, plantat în
of SC 15014 type, planted into cast foundation, fundaŃie turnată conform documentatie civil.
according to civil documentation.
On the side of medium voltage, OHTS shall be Pe partea de medie tensiune PTA se echipează cu:
equipped with:
• Dischargers with zinc oxide (Zn-O) 24 kV • descărcători cu oxid de zinc (Zn-O) 24 kV
• Framework of fuses of three-pole external type • cadru de siguranŃe de tip exterior tripolar SFEn
SFEn 24 kV and FEn 25 A. 24 kV şi FEn 25 A.
On the low voltage side, the designed OHTS shall Pe partea de joasă tensiune PTA proiectat se
be equipped with distribution box (82-EP-001). echipează cu o cutie de distribuŃie (82-EP-001).
The short-circuit and surge protection in the ProtecŃia la scurtcircuit şi suprasarcină în cabina de
distribution cabin shall be done with automated distribuŃie se realizează cu întrerupător automat.
switch
All metallic parts of the designed OHTS (brackets, Toate părŃile metalice ale PTA proiectat (console,
metal structures, distribution box, transformer confecŃii metalice, cutie distribuŃie, cuvă
tank) that might accidentally receive voltage shall transformator) care în mod accidental pot primi
be connected to the grounding system having tensiune se vor lega la instalaŃia de legare la
dispersion resistance value max. 1 Ohm (Rd ≤ 1 pământ, având valoarea rezistenŃei de dispersie de
Ω ). maxim 1 Ohm (Rd ≤ 1 Ω ).
New power transformer will be supplied by a PTA proiectat va fi alimentat cu energie electrica
medium voltage connection wich will be achieved dintr-un racord de medie tensiune care se va realiza
by ATR obtaining. dupa obtinerea ATR (Aviz tehnic de racordare).
Acest ATR va fi emis de SC ELECTRICA Muntenia
The ATR will be issued by SC ELECTRICA
Nord – S.D.E.E. Targoviste dupa depunerea
Muntenia Nord – S.D.E.E. Targoviste after
documentatiei, intocmita conform legislatiei in
submitting the documentationprepared according
vigoare.
to the legislation .

3.2. POWER SUPPLY WELLS 1390, 1389, 1388, 1387 MORENI / ALIMENTARE CU ENERGIE
ELECTRICA A SONDEI 1390, 1389, 1388, 1387 MORENI

Dwg. no. / doc. no. PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 sh.1


0.4 kV UEL shall be located according to doc. PU- LES 0,4 kV proiectata se va amplasa conform
D-ROPEP18320386_6_9-DE-EL-CRP-001 sh.1 doc. PU-D-ROPEP18320386_6_9-DE-EL-CRP-
using CYAbY 0,6/1kV 3x50+25 mm² power cable. 001 sh.1 folosind cablu de energie electrică de
tipul CYAbY 0,6/1kV 3x50+25 mm².
These cables are marked as follows: K1 for well
Aceste cabluri sunt notate in planul respectiv cu
1390, K7 for well 1389, K13 for well 1388, K19 for
K1-sonda 1390, K7-sonda 1389, K13-sonda
well 1387.
1388, K19-sonda 1387.
The cables shall be laid in the trench according to Cablurile vor fi pozate în şanŃ conform profilului
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 6 of 18

the trench profile as described on the drawing PU- de şanŃ din planul PU-D-ROPEP18320386_6_9-
D-ROPEP18320386_6_9-DE-EL-CRP-001. DE-EL-CRP-001.
These cables shall be connected to the junction Aceste cabluri se racordeaza in cutia de
box of newly designed aerial power transformer. distributie a PTA proiectat.

3.3. POWER AND LIGHTING SYSTEM / INSTALAłIE ELECTRICA DE FORTA SI ILUMINAT

3.3.1. WELL 1390 MORENI / SONDA 1390 MORENI

Dwg. no. / doc. no. PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 sh.2


This system shall be achieved according to dwg. Se va realiza conform plan:
PU-D-ROPEP18320386_6_9-DE-EL-CRP-001- PU-D-ROPEP18320386_6_9-DE-EL-CRP-001-01-B
01-B sh.2 as follows: sh.2 fiind compusa din:
• 400 V CIE box (82-EP-002); • Cutie CIE 400 V (82-EP-002) ;

• 400 V-MCC DOL (82-EP-003) for: • MCC DOL- 400 V (82-EP-003) pentru:
- distribution panel SAM-CONTROLLER+IT - alimentare cutie distributie-SAM-
supply; CONTROLLER+IT;
- motor pumping units action supply; - actionare motor unitate de pompare;
- electric switchboard of corrosion inhibitor - alimentare cu energie electrica tablou skid
skid supply; inhibitor coroziune;
- local lighting supply. - alimentare instalatie de iluminat local
• 55 kW motor driving the pumping unit type • Motor de 55 kW pentru unitate de pompare ;
DU;
• Box with earthing terminals (WO), mounted • Cutie cu borne pentru legare la pamant a
on lighting pole, at 0,5m height; echipamentelor de mentenanta (WO), montata
pe stalpul de iluminat la h=0,5m;

• K2: Cable of CYAbY 3x50+25 mm² type shall • K2: Cablu de tipul CYAbY-F 3x50+25 mm² ,
be exposed mounted on new metallic support montat aparent pe stelajul metalic nr.1 proiectat,
no. 1, from new 400 V CIE (82-EP-002) to new de la cutia CIE 400 V proiectata (82-EP-002) la
400 V-MCC DOL (82-EP-003); MCC DOL - 400 V proiectata (82-EP-003);
• K3: Cable of CYAbY-F 3 x 35+16 mm² type, • K3: Cablul de tipul CYAbY-F 3 x 35+16 mm²,
mounted underground from new 400 V-MCC pozat subteran de la MCC DOL - 400 V
DOL (82-EP-003) to distributor box with SAM proiectata (82-EP-003) la cutia de distribuŃie
CONTROLLER (82-EP-004); SAM CONTROLLER (82-EP-004) ;
• K3.1: Cable of CYEAbY-F type 3 x 35+16 mm², • K3.1 : Cablul de tipul CYEAbY-F 3 x 35+16 mm²,
mounted underground from distributor box with pozat subteran de la cutia de distribuŃie SAM
SAM CONTROLLER (82-EP-004) to CONTROLLER (82-EP-004) la bornele motorului
connecting units pump (82-PM-001); unitatii de pompare (82-PM-001);
• K3.2: Cable of CSYEAbY-F type 4 x1,5 mm² • K3.2: Cablul de tipul CSYEAbY-F 4 x1,5 mm²,
mounted overground, shall be connected from pozat suprateran, de la SAM CONTROLLER
SAM CONTROLLER (82-EP-004) to (82-EP-004) la bornele PTC ale motorului;
connecting units pump;
• K4 : Cablul de tipul CYAbY-F 3 x 2,5 mm², pozat
• K4: Cable of CYAbY-F type 3 x 2,5 mm², subteran de la MCC DOL - 400 V proiectata (82-
mounted underground from 400V-MCC DOL EP-003) la cabina IT (82-EP-005);
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 7 of 18

(82-EP-003) to IT cubicle (82-EP-005);


• K5: Cable of CYAbY-F type 3 x 2,5 mm², • K5 : Cablul de tipul CYAbY-F 3 x 2,5 mm², pozat
mounted underground from 400 V-MCC DOL subteran de la MCC DOL - 400 V proiectata (82-
(82-EP-003) to the electric switchboard of EP-003) la tabloul electric al skidului de inhibitori
corrosion inhibitor skid (82-EP-006); coroziune (82-EP-006);
• K6: Cable of CYY-F type 3 x 2,5 mm², mounted • K6 : Cablul de tipul CYY-F 3 x 2,5 mm², pozat
underground from 400 V-MCC DOL (82-EP- subteran de la MCC DOL - 400 V proiectata (82-
003) to junction box mounted on lighting pole EP-003) la doza de derivatie (82-EJB-001)
SE4 type (82-EJB-001). montata pe stâlpul de iluminat SE 4.
• K6.1-K6.2: Cables of CYY-F type 3 x 2,5 mm², • K6.1-K6.2: Cabluri de tipul CYY-F 3 x 2,5 mm²,
mounted apparent, from junction box (82-EJB- montate aparent pe stalpul de iluminat SE4, de la
001) mounted on lighting pole SE4 type to doza de derivatie (82-EJB-001) montata pe
lighting fixtures (82-EL-001; 82-EL-002). stâlpul de iluminat SE 4 la corpurile de iluminat
(82-EL-001; 82-EL-002) .
The SE 4 pole shall be equipped with two lighting Stâlpul SE 4 va fi echipat cu doua corpuri de
fixtures, IP 66, compact florescent lamps, CFL iluminat de tip proiector fiecare, IP 66, echipate cu
125 W each and a box with earthing terminals lampi compact fluorescente de 125 W, tip CFL,
(WO). fiecare si cutie cu borne pt. legare la pamant
echipament mentenanta (WO).
The SE 4 pole shall be in to concrete foundation, Stâlpul SE 4 va fi plantat în fundaŃie turnata,
according civil documentation. conform documentatie civil.

3.3.2. WELL 1389 MORENI / SONDA 1389 MORENI

Dwg. no. / doc. no. PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 sh.2


This system shall be achieved according to dwg. Se va realiza conform plan:
PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 sh.2
sh.2 as follows: fiind compusa din:
• 400 V CIE box (82-EP-007); • Cutie CIE 400 V (82-EP-007) ;

• 400 V-MCC DOL (82-EP-008) for: • MCC DOL- 400 V (82-EP-008) pentru:
- distribution panel SAM-CONTROLLER+IT - alimentare cutie distributie-SAM-
supply; CONTROLLER+IT;
- motor pumping units action supply; - actionare motor unitate de pompare;
- electric switchboard of corrosion inhibitor - alimentare cu energie electrica tablou skid
skid supply; inhibitor coroziune;
- local lighting supply. - alimentare instalatie de iluminat local
• 55 kW motor driving the pumping unit type • Motor de 55 kW pentru unitate de pompare ;
DU;
• Box with earthing terminals (WO), mounted • Cutie cu borne pentru legare la pamant a
on lighting pole, at 0,5m height; echipamentelor de mentenanta (WO), montata
pe stalpul de iluminat la h=0,5m;

• K8: Cable of CYAbY 3x50+25 mm² type shall • K8: Cablu de tipul CYAbY-F 3x50+25 mm² ,
be exposed mounted on new metallic support montat aparent pe stelajul metalic nr. 2 proiectat,
no. 2, from new 400 V CIE (82-EP-007) to new de la cutia CIE 400 V proiectata (82-EP-007) la
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 8 of 18

400 V-MCC DOL (82-EP-008); MCC DOL - 400 V proiectata (82-EP-008);


• K9: Cable of CYAbY-F 3 x 35+16 mm² type, • K9: Cablul de tipul CYAbY-F 3 x 35+16 mm²,
mounted underground from new 400 V-MCC pozat subteran de la MCC DOL - 400 V
DOL (82-EP-008) to distributor box with SAM proiectata (82-EP-008) la cutia de distribuŃie
CONTROLLER (82-EP-009); SAM CONTROLLER (82-EP-009) ;
• K9.1: Cable of CYEAbY-F type 3 x 35+16 mm², • K9.1 : Cablul de tipul CYEAbY-F 3 x 35+16 mm²,
mounted underground from distributor box with pozat subteran de la cutia de distribuŃie SAM
SAM CONTROLLER (82-EP-009) to CONTROLLER (82-EP-009) la bornele motorului
connecting units pump (82-PM-002); unitatii de pompare (82-PM-002);
• K9.2: Cable of CSYEAbY-F type 4 x1,5 mm² • K9.2: Cablul de tipul CSYEAbY-F 4 x1,5 mm²,
mounted overground, shall be connected from pozat suprateran, de la SAM CONTROLLER
SAM CONTROLLER (82-EP-009) to (82-EP-009) la bornele PTC ale motorului;
connecting units pump;
• K10 : Cablul de tipul CYAbY-F 3 x 2,5 mm²,
• K10: Cable of CYAbY-F type 3 x 2,5 mm², pozat subteran de la MCC DOL - 400 V
mounted underground from 400 V - MCC DOL proiectata (82-EP-008) la cabina IT (82-EP-010) ;
(82-EP-008) to IT cubicle (82-EP-010);
• K11: Cable of CYAbY-F type 3 x 2,5 mm², • K11 : Cablul de tipul CYAbY-F 3 x 2,5 mm²,
mounted underground from 400 V-MCC DOL pozat subteran de la MCC DOL - 400 V
(82-EP-008) to the electric switchboard of proiectata (82-EP-008) la tabloul electric al
corrosion inhibitor skid (82-EP-011); skidului de inhibitori coroziune (82-EP-011);

• K12: Cable of CYY-F type 3 x 2,5 mm², • K12 : Cablul de tipul CYY-F 3 x 2,5 mm², pozat
mounted underground from 400 V-MCC DOL subteran de la MCC DOL - 400 V proiectata (82-
(82-EP-008) to junction box mounted on EP-008) la doza de derivatie (82-EJB-002)
lighting pole SE4 type (82-EJB-002); montata pe stâlpul de iluminat SE 4;
• K12.1-K12.2: Cables of CYY-F type 3 x 2,5 • K12.1-K12.2: Cabluri de tipul CYY-F 3 x 2,5
mm², mounted apparent, from junction box (82- mm², montate aparent pe stalpul de iluminat
EJB-002) mounted on lighting pole SE4 type to SE4, de la doza de derivatie (82-EJB-002)
lighting fixtures (82-EL-003; 82-EL-004). montata pe stâlpul de iluminat SE 4 la corpurile
de iluminat (82-EL-003; 82-EL-004).
The SE 4 pole shall be equipped with two lighting Stâlpul SE 4 va fi echipat cu doua corpuri de
fixtures, IP 66, compact florescent lamps, CFL iluminat de tip proiector fiecare, IP 66, echipate cu
125 W each and a box with earthing terminals lampi compact fluorescente de 125 W, tip CFL,
(WO). fiecare si cutie cu borne pt. legare la pamant
echipament mentenanta (WO).
The SE 4 pole shall be in to concrete foundation, Stâlpul SE 4 va fi plantat în fundaŃie turnata,
according civil documentation. conform documentatie civil.

Cable notations correspond to the cable list doc. NotaŃiile cablurilor corespund tabelului de cabluri
no PU-D-ROPEP18320386_6_9-DE-EL-LST-003, cuprins in doc. nr. PU-D-ROPEP18320386_6_9-
and their connections hall be done acc. to DE-EL-LST-003, iar racordarea lor se va face
normative NTE 007/08/00: Normative for the conform normativ NTE 007/08/00: Normativ pentru
design and implementation of cable networks. proiectarea şi executarea reŃelelor de cabluri.
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 9 of 18

3.3.3. WELL 1388 MORENI / SONDA 1388 MORENI

Dwg. no. / doc. no. PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 sh.2


This system shall be achieved according to dwg. Se va realiza conform plan:
PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 sh.2
sh.2 as follows: fiind compusa din:
• 400 V CIE box (82-EP-012); • Cutie CIE 400 V (82-EP-012) ;

• 400 V-MCC DOL (82-EP-013) for: • MCC DOL- 400 V (82-EP-013) pentru:
- distribution panel SAM-CONTROLLER+IT - alimentare cutie distributie-SAM-
supply; CONTROLLER+IT;
- motor pumping units action supply; - actionare motor unitate de pompare;
- electric switchboard of corrosion inhibitor skid - alimentare cu energie electrica tablou skid
supply; inhibitor coroziune;
- local lighting supply. - alimentare instalatie de iluminat local
• 55 kW motor driving the pumping unit type • Motor de 55 kW pentru unitate de pompare ;
DU;
• Cutie cu borne pentru legare la pamant a
• Box with earthing terminals (WO), mounted on
echipamentelor de mentenanta (WO), montata pe
lighting pole, at 0,5m height;
stalpul de iluminat la h=0,5m;

• K14: Cable of CYAbY 3x50+25 mm² type • K14: Cablu de tipul CYAbY-F 3x50+25 mm² ,
shall be exposed mounted on new metallic montat aparent pe stelajul metalic nr.3 proiectat,
support no. 3, from new 400 V CIE (82-EP- de la cutia CIE 400 V proiectata (82-EP-012) la
012) to new 400 V-MCC DOL (82-EP-013); MCC DOL - 400 V proiectata (82-EP-013);
• K15: Cable of CYAbY-F 3 x 35+16 mm² type,
• K15: Cablul de tipul CYAbY-F 3 x 35+16 mm²,
mounted underground from new 400 V-MCC
pozat subteran de la MCC DOL - 400 V
DOL (82-EP-013) to distributor box with SAM
proiectata (82-EP-013) la cutia de distribuŃie
CONTROLLER (82-EP-014);
SAM CONTROLLER (82-EP-014) ;
• K15.1: Cable of CYEAbY-F type 3 x 35+16
mm², mounted underground from distributor • K15.1 : Cablul de tipul CYEAbY-F 3 x 35+16
box with SAM CONTROLLER (82-EP-014) to mm², pozat subteran de la cutia de distribuŃie
connecting units pump (82-PM-003); SAM CONTROLLER (82-EP-014) la bornele
motorului unitatii de pompare (82-PM-003);
• K15.2: Cable of CSYEAbY-F type 4 x1,5 mm² • K15.2: Cablul de tipul CSYEAbY-F 4 x1,5 mm²,
mounted overground, shall be connected from pozat suprateran, de la SAM CONTROLLER
SAM CONTROLLER (82-EP-014) to (82-EP-014) la bornele PTC ale motorului;
connecting units pump;
• K16: Cable of CYAbY-F type 3 x 2,5 mm², • K16 : Cablul de tipul CYAbY-F 3 x 2,5 mm²,
mounted underground from 400 V - MCC DOL pozat subteran de la MCC DOL - 400 V
(82-EP-013) to IT cubicle (82-EP-015) proiectata (82-EP-013) la cabina IT (82-EP-015) ;
• K17: Cable of CYAbY-F type 3 x 2,5 mm², • K17 : Cablul de tipul CYAbY-F 3 x 2,5 mm²,
mounted underground from 400 V-MCC DOL pozat subteran de la MCC DOL - 400 V
(82-EP-013) to the electric switchboard of proiectata (82-EP-013) la tabloul electric al
corrosion inhibitor skid (82-EP-016); skidului de inhibitori coroziune (82-EP-016);
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 10 of 18

• K18: Cable of CYY-F type 3 x 2,5 mm², • K18 : Cablul de tipul CYY-F 3 x 2,5 mm², pozat
mounted underground from 400 V-MCC DOL subteran de la MCC DOL - 400 V proiectata (82-
(82-EP-013) to junction box mounted on EP-013) la doza de derivatie (82-EJB-003)
lighting pole SE4 type (82-EJB-003); montata pe stâlpul de iluminat SE 4;
• K18.1-K18.2: Cabluri de tipul CYY-F 3 x 2,5
K18.1-K18.2: Cables of CYY-F type 3 x 2,5
mm², montate aparent pe stalpul de iluminat
mm², mounted apparent, from junction box (82-
SE4, de la doza de derivatie (82-EJB-003)
EJB-003) mounted on lighting pole SE4 type to
montata pe stâlpul de iluminat SE 4 la corpurile
lighting fixtures (82-EL-005; 82-EL-006).
de iluminat (82-EL-005; 82-EL-006).

3.3.4. WELL 1387 MORENI / SONDA 1387 MORENI

Dwg. no. / doc. no. PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 sh.2


This system shall be achieved according to dwg. Se va realiza conform plan:
PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 PU-D-ROPEP18320386_6_9-DE-EL-CRP-001 sh.2
sh.2 as follows: fiind compusa din:
• 400 V CIE box (82-EP-017); • Cutie CIE 400 V (82-EP-017) ;

• 400 V-MCC DOL (82-EP-018) for: • MCC DOL- 400 V (82-EP-018) pentru:
- distribution panel SAM-CONTROLLER+IT - alimentare cutie distributie-SAM-
supply; CONTROLLER+IT;
- motor pumping units action supply; - actionare motor unitate de pompare;
- electric switchboard of corrosion inhibitor skid - alimentare cu energie electrica tablou skid
supply; inhibitor coroziune;
- local lighting supply. - alimentare instalatie de iluminat local
• 55 kW motor driving the pumping unit type • Motor de 55 kW pentru unitate de pompare ;
DU;
• Box with earthing terminals (WO), mounted on • Cutie cu borne pentru legare la pamant a
lighting pole, at 0,5m height; echipamentelor de mentenanta (WO), montata pe
stalpul de iluminat la h=0,5m;

• K20: Cable of CYAbY 3x50+25 mm² type shall • K20: Cablu de tipul CYAbY-F 3x50+25 mm² ,
be exposed mounted on new metallic support montat aparent pe stelajul metalic nr.4 proiectat,
no. 4 from new 400 V CIE (82-EP-017) to new de la cutia CIE 400 V proiectata (82-EP-017) la
400 V-MCC DOL (82-EP-018); MCC DOL - 400 V proiectata (82-EP-018);
• K21: Cable of CYAbY-F 3 x 35+16 mm² type, • K21: Cablul de tipul CYAbY-F 3 x 35+16 mm²,
mounted underground from new 400 V-MCC pozat subteran de la MCC DOL - 400 V
DOL (82-EP-018) to distributor box with SAM proiectata (82-EP-018) la cutia de distribuŃie
CONTROLLER (82-EP-019); SAM CONTROLLER (82-EP-019) ;
• K21.1: Cable of CYEAbY-F type 3 x 35+16 • K21.1 : Cablul de tipul CYEAbY-F 3 x 35+16
mm², mounted underground from distributor box mm², pozat subteran de la cutia de distribuŃie
with SAM CONTROLLER (82-EP-019) to SAM CONTROLLER (82-EP-019) la bornele
connecting units pump (82-PM-004); motorului unitatii de pompare (82-PM-004);
• K21.2: Cable of CSYEAbY-F type 4 x1,5 mm² • K21.2: Cablul de tipul CSYEAbY-F 4 x1,5 mm²,
mounted overground, shall be connected from pozat suprateran, de la SAM CONTROLLER
SAM CONTROLLER (82-EP-009) to connecting (82-EP-009) la bornele PTC ale motorului;
units pump;
• K22 : Cablul de tipul CYAbY-F 3 x 2,5 mm²,
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 11 of 18

• K22: Cable of CYAbY-F type 3 x 2,5 mm², pozat subteran de la MCC DOL - 400 V
mounted underground from 400 V - MCC DOL proiectata (82-EP-018) la cabina IT (82-EP-020) ;
(82-EP-018) to IT cubicle (82-EP-020);
• K23: Cable of CYAbY-F type 3 x 2,5 mm², • K23 : Cablul de tipul CYAbY-F 3 x 2,5 mm²,
mounted underground from 400 V-MCC DOL pozat subteran de la MCC DOL - 400 V
(82-EP-018) to the electric switchboard of proiectata (82-EP-018) la tabloul electric al
corrosion inhibitor skid (82-EP-021); skidului de inhibitori coroziune (82-EP-021);

• K24: Cable of CYY-F type 3 x 2,5 mm², • K24 : Cablul de tipul CYY-F 3 x 2,5 mm², pozat
mounted underground from 400 V-MCC DOL subteran de la MCC DOL - 400 V proiectata (82-
(82-EP-008) to junction box mounted on lighting EP-008) la doza de derivatie (82-EJB-004)
pole SE4 type (82-EJB-004); montata pe stâlpul de iluminat SE 4;
• K24.1-K24.2: Cables of CYY-F type 3 x 2,5 • K24.1-K24.2: Cabluri de tipul CYY-F 3 x 2,5
mm², mounted apparent, from junction box (82- mm², montate aparent pe stalpul de iluminat
EJB-004) mounted on lighting pole SE4 type to SE4, de la doza de derivatie (82-EJB-004)
lighting fixtures (82-EL-007; 82-EL-008). montata pe stâlpul de iluminat SE 4 la corpurile
de iluminat (82-EL-007; 82-EL-008).
The SE 4 pole shall be equipped with two lighting Stâlpul SE 4 va fi echipat cu doua corpuri de
fixtures, IP 66, compact florescent lamps, CFL 125 iluminat de tip proiector fiecare, IP 66, echipate cu
W each and a box with earthing terminals (WO). lampi compact fluorescente de 125 W, tip CFL,
fiecare si cutie cu borne pt. legare la pamant
echipament mentenanta (WO).
The SE 4 pole shall be in to concrete foundation, Stâlpul SE 4 va fi plantat în fundaŃie turnata,
according civil documentation. conform documentatie civil.

Cable notations correspond to the cable list doc. NotaŃiile cablurilor corespund tabelului de cabluri
no PU-D-ROPEP18320386_6_9-DE-EL-LST-003, cuprins in doc. nr. PU-D-ROPEP18320386_6_9-
and their connections hall be done acc. to DE-EL-LST-003, iar racordarea lor se va face
normative NTE 007/08/00: Normative for the conform normativ NTE 007/08/00: Normativ pentru
design and implementation of cable networks. proiectarea şi executarea reŃelelor de cabluri.

Note: Notă :
Electrical motors of pumping units shall be
Motoarele electrice al unităŃilor de pompare vor
high efficiency type IE2.
fi de inalta eficienta tip IE2.
If the frequency converters and electrical
Daca convertizoarele de frecventa si motoarele
motor are from different suppliers, the motor
electrice nu sunt livrate de acelaşi furnizor,
selection shall be done by frequency converter
alegerea motoarelor se va face de către
supplier, and a string test shall be done as
furnizorul convertizoarelor de frecventa, iar
unique equipment.
testele se vor face împreună, ca ansamblu unic.

4. EARTHING SYSTEM / INSTALAłIA DE LEGARE LA PĂMÂNT


Dwg. no. / doc. no. PU-D-ROPEP18320386_6_9-DE-EL-DLP-001
Earthing system for all new electrical equipment Instalatia de legare la pamant a echipamentelor
shall be according do no. PU-D- electrice proiectate se va realiza conform plan nr.
ROPEP18320386_6_9-DE-EL-DLP-001. PU-D-ROPEP18320386_6_9-DE-EL-DLP-001.
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 12 of 18

At the surface equipping project for well 952 La proiectul de echipare al sondelor 1390, 1389,
Viforata, 75 m of Ol-Zn 40x4 mm platband have 1388, 1387 Moreni, pentru prizele de pamant s-a
been supplemented for earth socket in addition of suplimentat platbanda Ol-Zn 40x4 mm, in plus fata
platband of the same section provided at drilling de platbanda cu aceeasi sectiune prevazuta la faza
phase, in order to connect all electrical equipment de foraj, pentru a conecta toate echipamentele
provided in equipping phase to the earthing electrice prevazute la faza de echipare la centura
network, as follow: de legare la pamant, dupa cum urmeaza:
 well 1390: 70 m;  sonda 1390: 70 m;
 well 1389: 65 m;  sonda 1389: 65 m;
 well 1388: 65 m;  sonda 1388: 65 m;
 well 1387: 65 m.  sonda 1387: 65 m.

5. SAFETY MEASURES / MĂSURI DE PROTECłIE

If the dispersion resistance value does not În situaŃia în care valoarea rezistenŃei de dispersie
match, the earthing system shall be improved by nu corespunde, priza de pământ se va îmbunătăŃi
installing additional electrodes with the addition prin montarea de electrozi suplimentari cu adaos
of bentonite. de bentonită.
All metal parts of electrical equipment and Toate părŃile metalice ale utilajelor şi instalaŃiilor
installations that are not normally energized, electrice care în mod normal nu sunt sub tensiune,
shall be connected to the complex earthing se vor conecta la priza de pământ complexă.
system.
Cases of electrical equipment shall be connected Carcasele echipamentelor electrice se vor lega la
to the complex earthing network and local reŃeaua complexă de legare la pământ şi la priza
earthing system in two different points. de pământ locală în două puncte diferite.
If equipment is not provided by manufacturer with Dacă echipamentele nu sunt prevăzute, din
two different terminals, it is allowed as the construcŃie cu 2 borne diferite, se admite ca a doua
second connection to be secured by spring legătură să se asigure cu şaibă elastică şi piuliŃă.
washer and nut.
Each equipment shall be separately connected to Fiecare echipament se va lega separat la instalaŃia
the earthing system. de legare la pământ.
It is prohibited the series arrangement of two or Este interzisă legarea în serie a două sau mai
more equipment, and then connecting them to multe echipamente şi apoi legarea lor la
the main conductor. conductorul principal.
The connection between electrical equipment Legătura dintre echipamentele electrice şi instalaŃia
and earthing system shall be performed before de legare la pământ se va executa înaintea legării
connecting conductors to terminals. conductoarelor de lucru la borne.

6. REQUIREMENTS FOR TESTS AND CHECKS / CERINłELE EFECTUĂRII PROBELOR ŞI


VERIFICĂRILOR
Equipment shall be individually tested by their Echipamentele vor avea teste individuale, efectuate
manufacturers according to internal standards de furnizorii acestora, conform prescripŃiilor şi
and prescriptions. standardelor interne.
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 13 of 18

Commissioning tests shall be carried out by Testele pentru punerea în funcŃiune se vor efectua
contractor in accordance with the requirements de executant în concordanŃă cu prevederile cărŃilor
of technical books and ANRE prescriptions. tehnice şi prescripŃiilor A.N.R.E.
Contractor shall be liable on testing of materials Executantul va fi răspunzător în privinŃa testării
purchased by him and performance of works. materialelor achiziŃionate de acesta şi a execuŃiei de
lucrări pentru activităŃile desfăşurate.
Mounting of apparatus shall be made only after Montarea aparatelor se va face numai după
their checking in the workshop and, prior to verificarea lor în atelier, urmând ca, înainte de
start-up, all tests in the field shall be performed punerea în funcŃiune, să se execute toate probele în
in compliance with PE 116/94 and test reports teren conform PE 116/94, eliberând buletine de
shall be issued. verificare.
All equipment required in documentation must Toate echipamentele prevăzute în documentaŃie
be certified in terms of quality and safety. trebuie să fie certificate din punct de vedere al
calităŃii şi securităŃii muncii. Predarea
Well site hand-over shall be done in the
amplasamentului se va face în prezenŃa
presence of designer.
proiectantului.
Quality control program of works during the Planul de urmărire şi supraveghere a calităŃii este
execution is attached to documentation. anexat documentaŃiei.
For works of "hidden works" category, minutes Pentru lucrări din categoria „lucrări ascunse” se vor
of hidden works shall be prepared - by întocmi procese - verbale de lucrări ascunse, cu
specifying conditions for execution and precizarea condiŃiilor de execuŃie şi confirmarea de
confirmation by the beneficiary of their către beneficiar a execuŃiei acestora.
completion.
On commissioning of electrical installations, the La punerea în funcŃiune a instalaŃiilor electrice se
following tests according to norm PE 116/94: vor efectua următoarele probe conform Normativului
Normative for tests and measurements in PE 116/94: Normativ de incercari si masuratori la
electrical equipment and installations shall be echipamente si instalatii electrice, eliberându-se
performed issuing test reports. Buletine de verificare.

Cap 11.2 Phasing of Electric Line Cap 11.2 Fazarea liniei;


Cap 11.3. 20 KV OHL size checking; Cap 11.3 Verificarea gabaritului LEA 20kV;
Chap. 11.4. Metering of earthing resistance; Cap.11.4. Măsurarea rezistenŃei de legare la
pământ;
Chap 12. B; Medium voltage electrical cables; Cap 12 B;Cabluri de energie de medie tensiune;
Chap. 20. Checking of earthing systems. Cap.20. Verificare instalaŃii de legare la pământ.
Chap. 5 Power transformers. Cap. 5 Transformatoare de putere.

7. TECHNICAL REQUIREMENTS / CONDIłII TEHNICE

6.1. QUALITY OF MACHINERY AND EQUIPMENT / CALITATEA UTILAJELOR ŞI


ECHIPAMENTELOR
The project meets the requirements of SR EN Proiectul este încadrat corespunzător cerinŃelor
ISO 9001/2001. reglementărilor SR EN ISO 9001/2001.
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 14 of 18

The technical requirements for apparatus and CondiŃiile tehnice ale aparatajului şi echipamentelor
equipment used are checked by quality folosite se verifică prin certificatele de calitate emise
certificates issued by the manufacturer that must de producător ce trebuie să le însoŃească.
accompany them.
At start-up the contractor shall show the test La PIF constructorul va prezenta buletin de
report of earthing system for the value required verificare a prizelor de pământ pentru valoarea
in the project. normată din proiect.
When contracting the work, the beneficiary and La contractarea executării lucrărilor, beneficiarul şi
contractor shall prepare a schedule with executantul vor întocmi un grafic cu etapele de
execution and control phases of the works. execuŃie şi control ale lucrărilor.
During the work development, the head of asset În timpul lucrărilor, şeful de lucrare urmăreşte
shall follow to use only materials, equipment and punerea în operă numai a materialelor,
appliances that are appropriate in terms of echipamentelor şi aparatelor care corespund din
quality and have technical characteristics punct de vedere calitativ şi au caracteristicile
according to technical documentation. tehnice conform documentaŃiilor tehnice.
Contractor, in the presence of site manager, Executantul, în prezenŃa dirigintelui de şantier,
shall prepare certificates of quality for the works întocmeşte certificate de calitate pentru lucrările
performed (including for hidden works: realizate (inclusiv pentru lucrările ascunse: montare
installation of earthing system, foundations). prize de pământ, fundaŃii). Acestea vor fi vizate de
They shall be approved by the site manager. dirigintele de şantier.
After completing the works, the contractor shall După terminarea lucrărilor, executantul efectuează
check the quality of the works performed. controlul calităŃii lucrărilor executate.
Works shall be performed based on an Lucrările se vor executa pe bază de convenŃie de
Agreement with the company operating the lucrări cu unitatea de exploatare a instalaŃiilor.
installations.
The Contractor shall be certified by ELECTRICA Executantul trebuie să fie atestat ELECTRICA sau
or ANRE for the type of works performed. ANRE pentru tipul de lucrări executate.
The project shall be followed, informing the La execuŃie, se va respecta proiectul, anunŃând
designer for any discrepancies between site and proiectantul pentru eventualele nepotriviri între teren
plans prior to execution of the work. şi planuri, înainte de execuŃia lucrării.

6.2. NORMS, REGULATIONS, STANDARDS AND PHILOSOPHIES APPLICABLE TO THE


PROJECT / NORME, NORMATIVE, STANDARDE ŞI FILOZOFII APLICABILE PROIECTULUI
The following norms and standards shall be La executarea instalaŃiilor de proiectare se vor
observed at execution of the designed respecta prevederile următoare :
installations:
• NTE 003/04/00: Normative for construction • NTE 003/04/00: Normativ pentru constructia
OHL above 1000V LEA peste 1000V
• NTE 007/08/00: Normative for design and • NTE 007/08/00: Normativ pentru proiectarea si
execution of electrical cables networks executarea retelelor de cabluri electrice aprobat
approved by ANRE Order no. 38/2008; prin Ordin ANRE nr. 38/2006;
• Normative for the design, construction and • Normativ privind proiectarea, executia si
operation of electrical installations related to exploatarea instalaŃiilor electrice aferente
buildings, published by Order 2741/2011 ( I7- cladirilor, publicat prin Ordinul 2741/2011 ( I7-
2011) 2011)
• Normative for the design, construction, • Normativ pentru proiectarea, executarea,
testing and operation of electrical verificarea şi exploatarea instalaŃiilor electrice în
installations in hazardous areas: published zone cu pericol de explozie: publicat prin Ordin
by Order 176/2005 (NP 099 – 04). 176/2005 (NP 099 – 04).
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 15 of 18

• SR HD 60364-4-41:2007 modified by SR HD • SR HD 60364-4-41:2007 modificat de SR HD


60364-4-41:2007/C91:2008 Low-voltage 60364-4-41:2007/C91:2008 InstalaŃii electrice
electrical installations -- Part 4-41: Protection de joasa tensiune. Partea 4-41 : Măsuri de
for safety - Protection against electric shock protecŃie pentru asigurarea securităŃii. ProtecŃia
împotriva şocurilor electrice
• SR HD 60364-5-54:2012 – Low-voltage • SR HD 60364-5-54:2012 – InstalaŃii electrice de
electrical installations -- Part 5-54: Selection joasa tensiune. Partea 5-54: Alegerea si
and erection of electrical equipment - montarea echipamentelor electrice. Instalatii de
Earthing arrangements, protective legare la pamant si conductoare de protectie.
conductors and protective bonding
conductors
7. OMV PETROM NORMS AND PHILOSOPHIES / NORME ŞI FILOZOFII PETROM OMV
• U.C.05-HQ-TRE-014 – General Electrical • U.C.05-HQ-TRE-014 – Proiectare instalatie
System Design electrica generala

8. MAINTENANCE REQUIREMENTS / CERINTE PENTRU INTRETINERE


• All the final documentation including • Documentatia finala incluzand Manualul de
Maintenance Manual will be “As Built”, in Intretinere va fi „As Built” in concordanta cu
accordance to the OMV Petrom EP Project OMV Petrom EP Project Interface Procedure
Interface Procedure PEP-O-GE-PRO-004- PEP-O-GE-PRO-004-02-E - Annex B si PE-O-
02-E – Annex B and PE-O-MT-PRO-007-02- MT-PRO-007-02-E Equipment numbering
E Equipment numbering procedure. procedure.
• The Contractor will also deliver all software • Contractorul va livra toate softurile (daca este
related to the facility (if any). cazul) aferente facilităŃilor.
• SPIR will be provided and will cover all the • Se va livra Lista cu piese de schimb (SPIR)
spare part needed in maintenance activity. care va include toate piesele de schimb
necesare in activitatea de mentenanta.
• SPIR content will be approved by Petrom.
• The Technical specification for each spare • Continutul Listei va fi aprobat de Petrom.
part from SPIR has to be provided. • Trebuie sa se livreze Specificatia Tehnica
pentru fiecare piesa de schimb din Lista.
9. SPECIAL REMARKS / PRECIZĂRI SPECIALE

Any change of the design shall be made only Orice modificare privind soluŃia constructivă se va
with the designer’s approval. face numai cu aprobarea proiectantului.
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 16 of 18

PROGRAM FOR QUALITY CONTROL OF WORKS DURING THE EXECUTION/ PROGRAM PENTRU
CONTROLUL CALITĂłII ÎN TIMPUL EXECUłIEI

O.M.V. PETROM S.A. - ASSET VI MUNTENIA O.M.V. PETROM S.A. - ASSET VI MUNTENIA
CENTRAL the capacity of beneficiary CENTRAL în calitate de beneficiar, reprezentată
represented by ……………………………………… prin ……………………………..……………

S.C. PETROSTAR S.A. Ploieşti, S.C. PETROSTAR S.A. Ploieşti,


in the capacity of designer, represented by în calitate de proiectant, reprezentat prin
th. Grigore Constantin. th. Grigore Constantin
S.C. ………………………………………………… S.C. ......................................................................
In the capacity of operator, represented by în calitate de executant, reprezentat prin
……………………………………………………….. .................................................................................

In accordance with Law no. 440/2002 for the În conformitate cu Legea nr. 440/2002 pentru
approval of O.U. no. 95/1999 regarding the quality aprobarea O.U. nr. 95/1999 privind calitatea
of the assembly works for industrial equipment, lucrarilor de montaj pentru utilaje, echipamente si
equipment and technological installations, as well instalatii tehnologice industriale, cât si normativele
as the technical norms in force, determine jointly tehnice în vigoare stabilesc de comun acord
the present program for the quality control of the prezentul program pentru controlul calitătii
construction works foreseen in the project: lucrărilor de constructii prevăzute în proiect:

Contractor work must acquire and meet minimum Contractorul lucrărilor de execuŃie trebuie să-şi
quality requirements as specified Petrom RO-EP- însuşească şi să respecte cerinŃele minime de
QA-GDL-010-03-E – “Minimal requirements calitate conform specificaŃiei Petrom RO-EP-QA-
regarding Quality Assurance and Control for GDL-010-03-R – “Cerinte minime de asigurare a
Contractors”. calitatii de catre contractori”.

Contractor shall elaborate and submited Quality Constructorul va elabora si va transmite Planul de
Plan and Maintenance and Test Plan for Calitate si Plan de revizii si testarii pentru lucrarea
contracted work contractata.
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 17 of 18

Written document to Who prepares and


conclude: / Documentul signs / Cine
Works to be controlled, checked for scris care se încheie: întocmeşte şi
quality for which written documents PVLA – Minutes of Hidden semnează
Item / shall be prepared (controlled phase) Works / Proces- Verbal I-ISC
Nr. / Lucrări ce se controlează, se Lucrări Ascunse B-Beneficiary /
crt. verifică calitativ pentru care trebuie PVR – Minutes of Quality Beneficiar
întocmite documente scrise Acceptance Proces - E-Operator /
(faza controlată) Verbal RecepŃie Calitativă Executant
PV- Report / Proces- P-Designer /
Verbal Proiectant
0. 1. 2. 3.

1 Handling of route 20KV OHL / Predare P.V. B+P+E


traseu LEA 20kV
Verification, erection of concrete posts
into cast foundation / Verificare, P.V. B+E
2 montare stâlpi de beton în fundaŃie
turnată

Checking of vertical sizes (deflections) B+P+E


20 KV OHL / Verificare gabarite Report/P.V
3.
verticale (săgeŃi) LEA 20 KV

4. Handling of route 20KV UEC / Predare P.V. B+P+E


traseu LES 20kV
Verification mounted equipment 250 P.V.+ buletine de verificare B+E
KVA transformer station/Verificare
5.
montaj utilaj LEA 20 KV şi PTA
250 KVA
Verification of cast foundations in the
designed posts / Verificare fundaŃii P.V. B+E
6.
turnate la stâlpii proiectaŃi

Verification and installation of electrical Report/P.V.+test B+E


7. panels / Verificare si montare tablouri reports/buletine de
electrice verificare
Tests and starts-up / Probe şi verificări P.V.+ bulletins of B+E
8. de punere în funcŃiune verification / buletine de
verificare
9. Final acceptance / RecepŃia finală P.V.R. P+B+E
SURFACE EQUIPPING FOR WELLS 1387, 1388, 1389, 1390 MORENI/
Project ECHIPARE DE SUPRAFATA PENTRU SONDELE 1387, 1388, 1389, 1390
MORENI

Doc. Technical specification for electrical execution /


Title Caiet de sarcini pentru executia lucrarilor electrice
Doc. Rev Page
PU-D-ROPEP18320386_6_9-DE-EL-SOW-001-03-B
No.: 03 18 of 18

NOTE : NOTĂ :

1. Before commencement of performance, 1. Înainte de începerea execuŃiei, beneficiarul va


beneficiary will forward for local ISC înainta spre aprobarea ISC local, prezentul
approval the present program for quality program pentru controlul calităŃii.
control.
2. Verification of determined phases shall be 2. Verificarea fazelor determinante se va face
done according to the work execution conform graficului de execuŃie a lucrării, la
schedule in phases deemed proper by the fazele la care ISC local le consideră.
local ISC.
3. Operator will advise in written the other 3. Executantul va anunŃa în scris ceilalŃi factori
concerned factors for participation interesaŃi pentru participare cu minim 10 zile
minimum 10 days before the date when înaintea datei la care urmează a se face
verification is to be done. verificarea.
4. On acceptance of objective, one copy 4. La recepŃia obiectului, un exemplar din
upon the present schedule filled –in shall prezentul program completat se va anexa la
be attached to technical book of cartea tehnică a construcŃiei
construction.

Beneficiary Designer, Constructor


Beneficiar, Proiectant, Constructor,

techn. Grigore C-tin