Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Status report on HARITHA HARAM as on 26.07.

2021

Location ( Planted Details To be Plantation Details


Intake well/MLD WTP/IM Pump
S.No. Circle Segment Sub Division Name of the DEE During this
House/Along Pipe Lines (P/M or D/S)/If
Existing year New
any Other location Plants (Nos) Total (Nos)
Plants (Nos) Saplings
(Nos)
1 Adilabad SRSP-Adilabad Adilabad N.Praveen Jandaguda Sump 6 54 120 180

2 Adilabad SRSP-Adilabad Adilabad N.Praveen Daheguda Sump 10 100 120 230

3 Adilabad SRSP-Adilabad Adilabad N.Praveen Adilabad BPT 10 240 120 370

4 Adilabad SRSP-Adilabad Adilabad N.Praveen Sonkhas Sump 30 120 100 250

5 Adilabad SRSP-Adilabad Adilabad N.Praveen Addagutta Sump 9 75 120 204

6 Adilabad SRSP-Adilabad Adilabad N.Praveen Dahegaon sump 15 85 120 220

7 Adilabad SRSP-Adilabad Adilabad N.Praveen Ratnapur Sump 6 104 100 210

8 Adilabad SRSP-Adilabad Adilabad N.Praveen Regulaguda Sump 4 97 100 201

9 Adilabad SRSP-Adilabad Adilabad N.Praveen Pendalwada Sump 0 0 150 150

10 Adilabad SRSP-Adilabad Adilabad N.Praveen Wanwat Sump 0 110 100 210

11 Adilabad SRSP-Adilabad Adilabad N.Praveen Sunkidi Gutta GLBR 5 200 120 325

12 Adilabad SRSP-Adilabad Adilabad N.Praveen Toyaguda Sump 0 0 150 150

13 Adilabad SRSP-Adilabad Adilabad N.Praveen Kolamguda Sump 0 0 150 150

14 Adilabad SRSP-Adilabad Adilabad N.Praveen Laxmanguda Sump 0 0 150 150

TOTAL 95 1185 1720 3000

You might also like