Professional Documents
Culture Documents
APQP Completion: Shinchang Electrics Co., LTD / Volvo 3P Gap List
APQP Completion: Shinchang Electrics Co., LTD / Volvo 3P Gap List
APQP Completion
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0% 0% 0% 0% 0% 0%
0%
2 3 5 6 7 8
#0 #0 #0 #0 #0 #0
P P P P P P
Q Q Q Q Q Q
AP AP AP AP AP AP
100%
90%
80%
70%
60%
50%
Can the remaining gaps be completed during the project time plan?
40%
30%
20%
10%
0%
Tests vs. Technical PDCA procedure (8D) Third party certification Production Assembly Second tier supplier Others
Regulations Management
A gap list is a living document to assess the risks concerning the PPAP and APQP.
A gap list is not meant to be a follow up of all the actions in a project, but of the deviations
with regards to the plan for the actions regarding the PPAP.
If an action is not performed on time, missing, has failed... the gap list shall be used to
follow the gap between the plan and the actual situation.
The gap list is the agenda, minutes and action plan of any Quality - Design meetings to
fulfill the APQP/PPAP.
The gaps are entered by the champion of the gap list, which shall be at the supplier's.
Before they can be official, any change has to be agreed upon by both a representative
from Volvo and of the supplier.
Before an item is turn archived (set to History), it has to be reviewed with the Supplier
Quality & Development Engineer.
Rules
A new version number must be written for each change or set of changes in the gap list.
New version numbers must be top down chronologically.
PROJECT NAME:
DATE ISSUED/REVISED:
P2683
Parma Code: 32731 Part Name
Supplier: Shinchang Electrics Co., Ltd Part Number
Address: 724-2 Wonshi-dong Danwon-gu Part Revision Level / Issue
Ansan-si Gyungki-do Korea Drawing Number
Drawing Rev./Level/Issue
APQP checklist
hang
Electri
cs
Co.,
Ltd /
Volvo
3P 533800967.xls - Gap list
Gap
List i
Project Name: P2683 Version Number 0.7
Project ID: Update date 08/01/02
Identification Investigation Corrective Actions Completion of the gap Comments Closing the gap ✘ PPAP submission
90%
Can the gap be
Opening Gap # max: -
Topic Section Description of Gap Impact if the risk occurs Root cause analysis Initial Risk levels Responsible Short Term Long Term Close week estimate completed in Completion 20% 40% 60% 80% Lessons learned Closing date History Audit Status Action Responsible When? Status
Date 0 100
timeplan?
%
Advanced Product Quality Planning a
APQP #01 - Design Record of Saleable Product GDP date a √
APQP #02 - Project Time Schedule Involvement (Project Time Schedule) GDP date 0% a
APQP #03 - Engineering Change Documents (if any) GDP date 0% a
APQP #05 - Customer Engineering Approval (if required) GDP date 0% a
APQP #06 - Design FMEA (if supplier is design responsible) GDP date 0% a
APQP #07 - Product Assurance Plan (Quality Assurance Plan) GDP date 0% a
APQP #08 - New Equipment/Facilities/Tools/Gages (Supplier tool plan) GDP date 0% a
APQP #09 - Process Flow Diagrams GDP date a
APQP #10 - Process FMEA GDP date a
APQP #11 - Control Plan GDP date a
APQP #12 - Pre-Process Audit GDP date a
APQP #13 - Conformance of Production GDP date a
APQP #14 - PAA - Part Application Agreement GDP date a
APQP #15 & #04 - Contract Review / RTS - Review of Technical Specification Finalized GDP date a
APQP #16 - Measurement System Analysis Studies GDP date a
APQP #17 - Packaging / Spare Parts GDP date a
APQP #18 - Dimensional Results GDP date a
APQP #19 - Material, Performance Test Results GDP date a
APQP #20 - Qualified Laboratory Documentation GDP date a
APQP #21 - PSW - Part Submission Warrant GDP date a
APQP #22 - AAR - Appereance Approval Report GDP date a
APQP #23 - Bulk Material Requirement Checklist (if applicable) GDP date a
APQP #24 - Sample Product GDP date a
APQP #25 - Master Sample GDP date a
Master sample at supplier's
Others (insert new lines just
before this one)
APQP #26 - Checking Aids GDP date a
ICT, End of Line tester
Others (insert new lines just
before this one)
APQP #27 - PTR - Production Trial Run GDP date a
Or Run at rate
Others (insert new lines just
before this one)
APQP #28 - Process Audit GDP date a
APQP #29 - PHR - Part Handling Review GDP date a
Review organization
Others (insert new lines just
before this one)
APQP #30 - Initial Process Study - Cpk Analysis GDP date a
Additional topics a
Tests vs. Technical Regulations GDP date a
PDCA procedure (8D) GDP date a
Third party certification GDP date a
Production Assembly GDP date a
Second tier supplier Management GDP date a
Others GDP date a
Application.ScreenUpdating = True
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%