WCO&PED Management Inspection Demobilization Audit Checklist
WCO&PED Management Inspection Demobilization Audit Checklist
Purpose
To ensure the demonization of equipment and materials is complete and that the site condition is acceptable.
Scope
Required Equipment/Resources
None
Pre-Inspection
? Meeting Completed?
Audit Team Members
OE & Compliance
Representative
Date Location
Demobilization
Has a de-mobilization inspection of equipment, loads, and
transports been completed?
Do all of the loads have the appropriate manifests and
permits, as required?
Have all materials, equipment and vehicles been removed
from the site?
Well Pad
Is the pad in good condition and is free of sand, holes,
damage, debris, garbage, etc.?
Has all waste been removed from the well pad and properly
disposed of (empty drums, chemical waste, used oil, etc.)?
Have all spills been remediated or contaminated soil has been
removed for disposal?
Has security wire been removed from the security berm and
disposed of?
Has the security berm been replaced at the pad entrances to
restrict access?
Pits
Have fluids been removed from all pits and disposed of?
Have all pit liners been removed and properly disposed of?
Have all pits been back filled and leveled to the existing
grade?
Comments
Demobilization Acceptance