Concret Mix Design: Quality Conrol Laboratory
Concret Mix Design: Quality Conrol Laboratory
SPECIFIED REQUIREMENT
28 days cylinder compressive strength 40 Mpa
Cement Content : opc 430 kg/m³
Water / cement Ratio 0.39
Slump 120±25 mm
Maximum size of coarse aggregate 20 mm
FM 2.7
Dry rodded unit wt 1699 Kg
Dry rodded volume of coarse aggregate 0.63
Total coarse aggregate 1070 kg
properties cemnt GGBS mic.s 3/4" 1/2" 3/8" sand1 sand2 corr add1 add2
S.G 3.15 2.2 2.2 2.84 0 2.83 2.63 1 1.2 1.12
MO.C 0.41 0 0.62 0.69
ABS 1 0 1.6 0.69
Precnt % 0 0 55 0 45 100 0 1.7 0.2
0 100 100 0 7.3 0.86
material content volume of content adjust wt Source of material
cement 430.0 0.137 430 opc
faly ash 0.0 0.000 0.0
micro silica 0.0 0.000 0
free water 167.7 0.168 175.89 8.19
corr 0.0 0.000 0.00
add 1 8.8 0.007 8.77
add 2 1.0 0.001 0.96
airvoid % 2.0 0.020 2
agg 3/4" 588.7 0.207 585.23
agg 1/2"
aag 3/8" 481.7 0.170 476.95
total sand 0.290
sand 1 0.0 0.00 shoebah
sand 2 763.0 763.05 wadi ern
2442.9 1.000 2442.9
prepared by
Eng / Shamshad Ali
Q.C Manager
yield calculation
4 Cylende 0.026 Cube Cylinder
6 Cube 0.031 0.031 0.026
6Cylende 0.039
total agg
1833.4
CONCRET MIX DESIGN
QUALITY CONROL LABORATORY
SPECIFIED REQUIREMENT
28 days cylindr compressive strength 40 Mpa
Cement Content : opc 420 kg/m³
Water / cement Ratio 0.41
Slump 120±25 mm
Maximum size of coarse aggregate 20 mm
FM 2.7
Dry roddet unite wt wt 1657 Kg
Dry rode volume of coarse aggreget 0.63
Total coarse aggregate 1043.91 kg
propertes cemnt GGBS mic.s 3/4" 1/2" 3/8" sand1 sand2 corr add1 add2
S.G 3.15 2.2 2.2 2.84 0 2.83 2.63 1 1.2 1.18
MO.C 0.59 0 0.9 0.29
ABS 1.1 0 1.7 0.69
Precnt % 0 0 60 0 40 100 0 1.7 0
0 100 100 0 7.1 0
materil content volum of content adjust wt Sourse of materil
cement 420.0 0.133 420 opc
faly ash 0.0 0.000 0.0
micro silica 0.0 0.000 0
free water 172.2 0.172 181.88 9.68
corr 0.0 0.000 0.00
add 1 8.6 0.007 8.57
add 2 0.0 0.000 0.00
airvoid % 2.0 0.020 2
agg 3/4" 626.3 0.221 623.15
agg 1/2"
aag 3/8" 417.6 0.148 414.22
total sand 0.299
sand 1 0.0 0.00 shoebah
sand 2 787.0 783.84 wadi ern
2433.7 1.000 2433.7
preperd by
eng / Shamshad
Q.C Mnager
yield calculation
4 Cylende 0.026 Cube Cylinder
6 Cube 0.031 0.031 0.026
6Cylende 0.039
total agg
1830.9
Date 12/8/2020
Trayal No Plant No-1
Grad 400 OPC C40 @ 28 day
Spasment Cube Cylindr
materil 1 m³ 0.026
agg 3/4" 432 11.23 0.013 5.616
agg 1/2" 0 0.00 0.014 0
agg 3/8" 468 12.17 0.014 6.552
Sand1 0 0.00 0 0
Sand2 906 23.56 0.007 6.342
Cement 400 10.40 0.22 88
Microsilica 0 0.00 1.4 0
Pzzolona 0 0.00 0.6 0
ic 0 0.00
Total water 230 5.98 0.0075 1.725
Retarder Lt. 1.5 39 2.1 3.15
G7 Lt. 1.5 39 2.75 4.125
2439 115.51
179.51
5.49
Slump test
Start Mix
Time Slump
Intial 140
copressive strength
140
120
100
slump
80
60
40
20
0
0 15 30 45 60 75 90 105
#DIV/0!
0
0
0
#DIV/0! #DIV/0!
Date 11/26/2020
tryl No 2
Grad C30 @ 28 day
Spasment Cylindr
materil 1 m³ 0.026
agg 3/4" 588 15.29 0.013 7.644
agg 1/2" 0 0.00 0.014 0
agg 3/8" 440 11.44 0.014 6.16
sand1 0 0.00 0 0
sand2 858 22.31 0.007 6.006
cement 370 9.62 0.22 81.4
microsilica 0 0.00 1.4 0
flay ash 0 0.00 0.6 0
ic 0 0.00
water 191 4.97 0.0075 1.4325
rp150 6.6 172 2.1 13.86
G7 (OLD) No.2 7.0 182 2.75 19.25
2461 135.7525
199.7525
-14.7525
Slump test
Time Slump
4.30 220
5.00 190
5.15 180
copressive strength
200
150
slump
100
50
0
0.00 15.00 30.00 45.00 60.00 75.00 90.00 105.00
#DIV/0!
0
0
0
#DIV/0! #DIV/0!
Wt of concret 17160
Volum of measure 7.05
density of concret 2434.043
total mass of materile 2439
yield 1002.037