Professional Documents
Culture Documents
Field Insfection Report: Project No. Item No Concrete Prepouring Check List Location Signature
Field Insfection Report: Project No. Item No Concrete Prepouring Check List Location Signature
CEMERLANG
Report No : SAMUDRA
KONTRINDO
Date :
Page : Of
FIELD INSFECTION REPORT PROJECT NO. :
INSPECTION TYPE : ITEM NO :
LOCATION :
CONCRETE PREPOURING CHECK LIST
SIGNATURE
INSPECTION NOTICE NO. : KRN
CSK QC KRM SURVEYOR
KRN SPV KRN QC
CSK INSPECTOR :
KRN SURVEYOR :
KRN SUVERVISOR :
KRN INSPECTOR :
INSPECTION ITEM ACC REJ ACC REJ ACC REJ ACC REJ ACC REJ
FORMATION SURFACE CONDITION
FORMATTING LEVEL
LAYOUT
REINFORCEMENT
FORMWORK
ANCHOR BOLT/POCKET
TEMPALTES
INSERT EMBEDDED
CLEAN OUT
PROPOSED FINISH LEVEL
OTHER
Rebar rigidity
Rebar splice length
Rebar overlap
Note
ACC : ACCEPTABLE ⁄ COMPLY WITH REFERENCE DOCUMENT