Rekapitulasi Payment

Volume
No Description unit Remaks
Phase 2 Pipe Rack Phase 2 Phase 6 Phase 4 Phase 5 Total
1 Ruble Soling m3 282.00 71.01 222.00 575.00
2 Concrate -
K 100 m3 24.91 129.46 244.98 99.30 220.98 719.63
K 200 m3 196.31 122.08 76.49 22.48 417.37
K 250 m3 7.61 23.07 30.69
K 300 m3 218.92 676.55 591.38 450.40 1,052.81 2,990.05
3 Formwork m2 3,325.77 2,257.67 1,468.40 7,051.84
3 Rebar -
Ø 8 mm ton 3.49 14.49 6.99 24.97
Ø >8 mm ton 27.72 95.22 59.27 138.02 320.23
4 Grouting m3 2.60 1.09 3.95 7.64
5 Brick Masonry m3 172.50 60.88 174.95 101.70 510.03