ISO 9001:2015
INTERNAL AUDITOR TRAINING
Slide 1
COURSE CONTENT
This course covers :-
ISO 9001 Requirements – Risk Based
Quality Audit
Planning An Audit
Responsibility & Authority
Preparing For An Audit
Site Audit
Non-Conformity
Corrective Action
Post Audit Activities
Slide 4
Ten Clauses – “Higher Level Structure”
1. Scope 6. Planning
2. Normative references 7. Support
7.2
7. Support
10.2 Improvement
Slide 15
DEFINITION
ISO 9000:2015 defines “Audit” as:
Follow-up
verification Appoint Pool
Audit Team of auditors
Report
audit Documentation
review and checklist
preparation
Corrective Nonconformity,
Action Observation,
Corrective action Audit Team
meeting
Perform Schedule
on-site audit audit
Slide 19
FACTORS TO CONSIDER
Context of organization & interested parties’ needs
Actions to address Risks and opportunities
Scope of business activities
Range of products/processes
Boundary – physical size and location of various sites
Any requirements by customers, statutory & regulatory or
certification body affecting the quality management system
Organisation’s own policy(s) on internal audit
Availability of experienced/potential Internal Auditors
ISO
Date Time Audit Scope Auditors Auditee
Clause
1 SALES
2 PRODUCTION
3 QA
4 WAREHOUSE
5 PURCHASING
6 HR
7 PRODUCT DESIGN
8 DOCUMENT CONTROL
9 TOP MANAGEMENT
10 CAR / PAR
Prepared By:
Prepared By:
Follow-up
verification Appoint Pool
Audit Team
of auditors
Report
audit Documentation
review and checklist
preparation
Corrective Nonconformity,
Action Observation,
Corrective action Audit Team
meeting
Perform Schedule
on-site audit audit
Slide 26
LEAD AUDITOR
Perform opening meeting.
Manage all phases of an audit.
Select and appoint Audit Team.
Liaise with Auditee.
Plan and schedule the audit.
Conduct and lead the audit.
Final authority on decisions regarding audit findings.
Conduct closing meeting.
Present the audit findings.
Prepare, verify and submit audit report.
Slide 30
Prepare Audit Checklist
Auditor should pick up and note on the audit checklists
those important and essential points which could contribute
to achieving the objectives stated in the documents.
Follow-up
verification Appoint Pool
Audit Team of auditors
Report
audit Documentation
review and checklist
preparation
Corrective Nonconformity,
Action Observation,
Corrective action Audit Team
meeting
Perform Schedule
on-site audit audit
Slide 33
THE AUDIT PROCESS
OBSERVE
(Memerhati)
CHECK ASK
(Memeriksa) (Bertanya)
Follow-up
verification Appoint
Audit Team Pool
of auditors
Report
audit Documentation
review & checklist
preparation
Corrective Non-conformity,
Action Observation,
Corrective action Audit Team
meeting
Perform Schedule
on-site audit audit
Slide 37
Definition
The non-fulfillment of
Specified requirement.
NCR
A non-conformity is
considered minor or non-
critical and unlikely to have
serious consequences.
Slide 42
Definition
According to ISO 9000:
15-03-15
Auditee to propose corrective
action to prevent recurrence To include the screw condition check in the KY Tan
maintenance program.
15-03-15
15-03-15
Auditee to propose corrective
action to prevent recurrence To include the screw condition check in the KY Tan
maintenance program.
15-03-15
Auditor to verify the effectiveness Production floor found was
of action taken cleaned up and the screw Simon Lee
condition check was
included in INTERNAL
ISO 9001:2015 the program
AUDITOR TRAINING 20-3-2015
COPYRIGHTS RESERVED Slide 48
POST AUDIT
ACTIVITIES
Slide 49
Follow-up Verification
A post-audit activity which is part of the corrective
action process.
Slide 51