PT.

ADHI KARYA (PERSERO) TBK


DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:


(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

INSPECTION SAND CONE TEST

LOKASI : Storage Bulk Material TANGGAL TES : 20-Sep-20


JENIS MATERIAL : Sub Base LPB DITES OLEH : Abu
KETEBALAN / LAYER : NUMBER OF SANCONE : S2

No S6 S5 S4
1 Berat pasir + botol + corong ( Sebelum ) gr 6210 6862 7725
2 Berat sisa pasir + botol + corong (Sesudah ) gr 1819 3536 1832
3 Berat pasir didalam corong & lubang ( 1- 2 ) gr 4391 3326 5893
4 Berat pasir dalam corong * gr 1820 1820 1820
5 Berat pasir dalam lubang ( 3 - 4 ) gr 2571 1506 4073
6 Berat isi pasir ∂p gr 1.443 1.443 1.443
7 Volume lubang ( 5 / 6(∂p) cm3 1781.70 1043.66 2822.59
8 Berat tanah basah + tare gr 2888 2002 4978
9 Berat tare gr 269 272 272
10 Berat tanah basah ( 8 - 9 ) gr 2619 1730 4706
11 Berat Isi tanah basah ( 10 / 7 ) gr/cm3 1.470 1.658 1.667
12 Kadar air % 9.2 16.4 6.0
13 Berat Isi tanah kering 11 / ( 1+(12/100)) gr/cm3 1.346 1.424 1.573
14 Kadar air optimum lab ( OMC ) % 21.410 21.410 21.410
15 Berat Isi kering Max lab gr/cm3 1.590 1.590 1.590
16 Persen kepadatan kering( 13 / 15 ) x 100 % 84.65 89.54 98.92
Kadar Air
17 Berat tanah basah + tempat gr 59.1 48.5 56
18 Berat tanah kering + tempat gr 54.5 42.5 53
19 Berat tempat gr 11 11 11
20 Berat air 17 - 18 gr 4.6 6 3
21 Berat tanah kering 18 - 19 gr 49.9 36.5 50
22 Kadar air 20/21 X 100% % 9.22 16.44 6.00

Koreksi Tertahan Saringan No # 4


23 Berat jenis material tertahan No.4 gr/cm3
24 Berat material tertahan No.4 gr
25 Persen tertahan No.4 %
26 Berat isi maksimum terkoreksi gr/cm3

Cheked and Approved by


Made and Submitted by Checked and Approved By Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
P.T. ADHI KARYA (Persero) FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Rr. Atit Salma Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST, MT
Quality Control RESIDENT ENGINEER NIP. 198809172201012 2 004
DATE DATE DATE

Known and Approved by


EMPLOYER
PT. ADHI KARYA (PERSERO) TBK
DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:


(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

INSPECTION SAND CONE TEST

LOKASI : Storage Bulk Material TANGGAL TES : 20-Sep-20


JENIS MATERIAL : Sub Base LPB DITES OLEH : Abu
KETEBALAN / LAYER : NUMBER OF SANCONE : S2

No S9 S8 S7
1 Berat pasir + botol + corong ( Sebelum ) gr 5921 6958 7015
2 Berat sisa pasir + botol + corong (Sesudah ) gr 1909 2824 2880
3 Berat pasir didalam corong & lubang ( 1- 2 ) gr 4012 4134 4135
4 Berat pasir dalam corong * gr 1820 1820 1820
5 Berat pasir dalam lubang ( 3 - 4 ) gr 2192 2314 2315
6 Berat isi pasir ∂p gr 1.443 1.443 1.443
7 Volume lubang ( 5 / 6(∂p) cm3 1519.06 1603.60 1604.30
8 Berat tanah basah + tare gr 2655 2301 2208
9 Berat tare gr 269 272 272
10 Berat tanah basah ( 8 - 9 ) gr 2386 2029 1936
11 Berat Isi tanah basah ( 10 / 7 ) gr/cm3 1.571 1.265 1.207
12 Kadar air % 10.7 7.4 7.4
13 Berat Isi tanah kering 11 / ( 1+(12/100)) gr/cm3 1.418 1.178 1.123
14 Kadar air optimum lab ( OMC ) % 21.410 21.410 21.410
15 Berat Isi kering Max lab gr/cm3 1.590 1.590 1.590
16 Persen kepadatan kering( 13 / 15 ) x 100 % 89.21 74.06 70.64
Kadar Air
17 Berat tanah basah + tempat gr 77.6 65.1 63
18 Berat tanah kering + tempat gr 71 61.2 59.4
19 Berat tempat gr 9.5 8.8 11
20 Berat air 17 - 18 gr 6.6 3.9 3.6
21 Berat tanah kering 18 - 19 gr 61.5 52.4 48.4
22 Kadar air 20/21 X 100% % 10.73 7.44 7.44

Koreksi Tertahan Saringan No # 4


23 Berat jenis material tertahan No.4 gr/cm3
24 Berat material tertahan No.4 gr
25 Persen tertahan No.4 %
26 Berat isi maksimum terkoreksi gr/cm3

Cheked and Approved by


Made and Submitted by Checked and Approved By Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
P.T. ADHI KARYA (Persero) FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Rr. Atit Salma Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST, MT
Quality Control RESIDENT ENGINEER NIP. 198809172201012 2 004

DATE DATE DATE

Known and Approved by


EMPLOYER
PT. ADHI KARYA (PERSERO) TBK
DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:


(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

INSPECTION SAND CONE TEST

LOKASI : Storage Bulk Material TANGGAL TES : 20-Sep-20


JENIS MATERIAL : Sub Base LPB DITES OLEH : Abu
KETEBALAN / LAY : NUMBER OF SANCONE : S2

No S7 S8 S9
1 Berat pasir + botol + corong ( Sebelum ) gr 7393 7471 7439
2 Berat sisa pasir + botol + corong (Sesudah ) gr 2696 3520 3642
3 Berat pasir didalam corong & lubang ( 1- 2 ) gr 4697 3951 3797
4 Berat pasir dalam corong * gr 1820 1820 1820
5 Berat pasir dalam lubang ( 3 - 4 ) gr 2877 2131 1977
6 Berat isi pasir ∂p gr 1.443 1.443 1.443
7 Volume lubang ( 5 / 6(∂p) cm3 1993.76 1476.78 1370.06
8 Berat tanah basah + tare gr 3574 2857 2754
9 Berat tare gr 269 272 269
10 Berat tanah basah ( 8 - 9 ) gr 3305 2585 2485
11 Berat Isi tanah basah ( 10 / 7 ) gr/cm3 1.658 1.750 1.814
12 Kadar air % 11.4 10.4 15.7
13 Berat Isi tanah kering 11 / ( 1+(12/100)) gr/cm3 1.488 1.585 1.567
14 Kadar air optimum lab ( OMC ) % 21.410 21.410 21.410
15 Berat Isi kering Max lab gr/cm3 1.590 1.590 1.590
16 Persen kepadatan kering( 13 / 15 ) x 100 % 93.56 99.69 98.57
Kadar Air
17 Berat tanah basah + tempat gr 68 73 75
18 Berat tanah kering + tempat gr 62 67 66
19 Berat tempat gr 9.5 9.5 8.8
20 Berat air 17 - 18 gr 6 6 9
21 Berat tanah kering 18 - 19 gr 52.5 57.5 57.2
22 Kadar air 20/21 X 100% % 11.43 10.43 15.73

Koreksi Tertahan Saringan No # 4


23 Berat jenis material tertahan No.4 gr/cm3
24 Berat material tertahan No.4 gr
25 Persen tertahan No.4 %
26 Berat isi maksimum terkoreksi gr/cm3

Cheked and Approved by


Made and Submitted by Checked and Approved By Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
P.T. ADHI KARYA (Persero) FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Rr. Atit Salma Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST, MT
Quality Control RESIDENT ENGINEER NIP. 198809172201012 2 004

DATE DATE DATE

Known and Approved by


EMPLOYER
PT. ADHI KARYA (PERSERO) TBK
DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:


(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

INSPECTION SAND CONE TEST

LOKASI : TANGGAL TES : 22-Sep-20


JENIS MATERIAL : DITES OLEH : Abu
JUMLAH : NUMBER OF SANCONE : S2
LINTASAN
No A1 A2
1 W+ botol + corong ( Sebelum ) gr 7359 7315
2 Berat sisa pasir + botol + corong (Sesudah ) gr 3464 3007
3 Berat pasir didalam corong & lubang ( 1- 2 ) gr 3895 4308
4 Berat pasir dalam corong * gr 1820 1820
5 Berat pasir dalam lubang ( 3 - 4 ) gr 2075 2488
6 Berat isi pasir ∂p gr 1.443 1.443
7 Volume lubang ( 5 / 6(∂p) cm3 1437.98 1724.19
8 Berat tanah basah + tare gr 3348 3672
9 Berat tare gr 269 269
10 Berat tanah basah ( 8 - 9 ) gr 3079 3403
11 Berat Isi tanah basah ( 10 / 7 ) gr/cm3 2.141 1.974
12 Kadar air % 11.8 8.7
13 Berat Isi tanah kering 11 / ( 1+(12/100)) gr/cm3 1.916 1.816
14 Kadar air optimum lab ( OMC ) % 15.640 15.640
15 Berat Isi kering Max lab gr/cm3 1.790 1.790
16 Persen kepadatan kering( 13 / 15 ) x 100 % 107.03 101.45
Kadar Air
17 Berat tanah basah + tempat gr 45.6 55.8
18 Berat tanah kering + tempat gr 41.8 52.1
19 Berat tempat gr 9.5 9.5
20 Berat air 17 - 18 gr 3.8 3.7
21 Berat tanah kering 18 - 19 gr 32.3 42.6
22 Kadar air 20/21 X 100% % 11.76 8.69

Koreksi Tertahan Saringan No # 4


23 Berat jenis material tertahan No.4 gr/cm3
24 Berat material tertahan No.4 gr
25 Persen tertahan No.4 %
26 Berat isi maksimum terkoreksi gr/cm3

Cheked and Approved by


Made and Submitted by Checked and Approved By Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
P.T. ADHI KARYA (Persero) FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Rr. Atit Salma Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST, MT
Quality Control RESIDENT ENGINEER NIP. 198809172201012 2 004

DATE DATE DATE

Known and Approved by


EMPLOYER
PT. ADHI KARYA (PERSERO) TBK
DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:


(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

INSPECTION SAND CONE TEST

LOKASI : Storage Bulk Material TANGGAL TES : 20-Sep-20


JENIS MATERIAL : Sub Base LPB DITES OLEH : Abu
KETEBALAN / LAY : NUMBER OF SANCONE : S2

No b6 b2 b4
1 Berat pasir + botol + corong ( Sebelum ) gr 7008 6854 7404
2 Berat sisa pasir + botol + corong (Sesudah ) gr 2847 2770 3756
3 Berat pasir didalam corong & lubang ( 1- 2 ) gr 4161 4084 3648
4 Berat pasir dalam corong * gr 1820 1820 1820
5 Berat pasir dalam lubang ( 3 - 4 ) gr 2341 2264 1828
6 Berat isi pasir ∂p gr 1.443 1.443 1.443
7 Volume lubang ( 5 / 6(∂p) cm3 1622.31 1568.95 1266.81
8 Berat tanah basah + tare gr 3345 3253 2694
9 Berat tare gr 271 271 271
10 Berat tanah basah ( 8 - 9 ) gr 3074 2982 2423
11 Berat Isi tanah basah ( 10 / 7 ) gr/cm3 1.895 1.901 1.913
12 Kadar air % 8.1 9.8 8.5
13 Berat Isi tanah kering 11 / ( 1+(12/100)) gr/cm3 1.754 1.732 1.763
14 Kadar air optimum lab ( OMC ) % 15.640 15.640 15.640
15 Berat Isi kering Max lab gr/cm3 1.790 1.790 1.790
16 Persen kepadatan kering( 13 / 15 ) x 100 % 97.97 96.74 98.48
Kadar Air
17 Berat tanah basah + tempat gr 57.8 59 72.6
18 Berat tanah kering + tempat gr 54.2 54.6 67.6
19 Berat tempat gr 9.5 9.5 8.8
20 Berat air 17 - 18 gr 3.6 4.4 5
21 Berat tanah kering 18 - 19 gr 44.7 45.1 58.8
22 Kadar air 20/21 X 100% % 8.05 9.76 8.50

Koreksi Tertahan Saringan No # 4


23 Berat jenis material tertahan No.4 gr/cm3
24 Berat material tertahan No.4 gr
25 Persen tertahan No.4 %
26 Berat isi maksimum terkoreksi gr/cm3

Cheked and Approved by


Made and Submitted by Checked and Approved By Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
P.T. ADHI KARYA (Persero) FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Rr. Atit Salma Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST, MT
Quality Control RESIDENT ENGINEER NIP. 198809172201012 2 004

DATE DATE DATE

Known and Approved by


EMPLOYER
PT. ADHI KARYA (PERSERO) TBK
DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:


(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

INSPECTION SAND CONE TEST

LOKASI : TANGGAL TES : 22-Sep-20


JENIS MATERIAL : DITES OLEH : Abu
JUMLAH : NUMBER OF SANCONE : S2
LINTASAN
No
1 Berat pasir + botol + corong ( Sebelum ) gr
2 Berat sisa pasir + botol + corong (Sesudah ) gr
3 Berat pasir didalam corong & lubang ( 1- 2 ) gr
4 Berat pasir dalam corong * gr
5 Berat pasir dalam lubang ( 3 - 4 ) gr
6 Berat isi pasir ∂p gr
7 Volume lubang ( 5 / 6(∂p) cm3
8 Berat tanah basah + tare gr
9 Berat tare gr
10 Berat tanah basah ( 8 - 9 ) gr
11 Berat Isi tanah basah ( 10 / 7 ) gr/cm3
12 Kadar air %
13 Berat Isi tanah kering 11 / ( 1+(12/100)) gr/cm3
14 Kadar air optimum lab ( OMC ) %
15 Berat Isi kering Max lab gr/cm3
16 Persen kepadatan kering( 13 / 15 ) x 100 %
Kadar Air
17 Berat tanah basah + tempat gr
18 Berat tanah kering + tempat gr
19 Berat tempat gr
20 Berat air 17 - 18 gr
21 Berat tanah kering 18 - 19 gr
22 Kadar air 20/21 X 100% %

Koreksi Tertahan Saringan No # 4


23 Berat jenis material tertahan No.4 gr/cm3
24 Berat material tertahan No.4 gr
25 Persen tertahan No.4 %
26 Berat isi maksimum terkoreksi gr/cm3

Cheked and Approved by


Made and Submitted by Checked and Approved By Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
P.T. ADHI KARYA (Persero) FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Rr. Atit Salma Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST, MT
Quality Control RESIDENT ENGINEER NIP. 198809172201012 2 004

DATE DATE DATE

Known and Approved by


EMPLOYER
PT. ADHI KARYA (PERSERO) TBK
DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:


(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

INSPECTION SAND CONE TEST

LOKASI : Storage Bulk Material TANGGAL TES : 20-Sep-20


JENIS MATERIAL : Sub Base LPB DITES OLEH : Abu
KETEBALAN / LAY : NUMBER OF SANCONE : S2

No B5 B1 B3
1 Berat pasir + botol + corong ( Sebelum ) gr 7053 6824 7194
2 Berat sisa pasir + botol + corong (Sesudah ) gr 3071 2749 3006
3 Berat pasir didalam corong & lubang ( 1- 2 ) gr 3982 4075 4188
4 Berat pasir dalam corong * gr 1775 1775 1775
5 Berat pasir dalam lubang ( 3 - 4 ) gr 2207 2300 2413
6 Berat isi pasir ∂p gr 1.443 1.443 1.443
7 Volume lubang ( 5 / 6(∂p) cm3 1529.45 1593.90 1672.21
8 Berat tanah basah + tare gr 3187 3343 3298
9 Berat tare gr 269 269 269
10 Berat tanah basah ( 8 - 9 ) gr 2918 3074 3029
11 Berat Isi tanah basah ( 10 / 7 ) gr/cm3 1.908 1.929 1.811
12 Kadar air % 10.8 12.5 6.3
13 Berat Isi tanah kering 11 / ( 1+(12/100)) gr/cm3 1.721 1.715 1.704
14 Kadar air optimum lab ( OMC ) % 15.640 15.640 15.640
15 Berat Isi kering Max lab gr/cm3 1.790 1.790 1.790
16 Persen kepadatan kering( 13 / 15 ) x 100 % 96.17 95.80 95.17
Kadar Air
17 Berat tanah basah + tempat gr 57.6 59.3 67.6
18 Berat tanah kering + tempat gr 52.9 53.7 64.1
19 Berat tempat gr 9.5 8.8 8.8
20 Berat air 17 - 18 gr 4.7 5.6 3.5
21 Berat tanah kering 18 - 19 gr 43.4 44.9 55.3
22 Kadar air 20/21 X 100% % 10.83 12.47 6.33

Koreksi Tertahan Saringan No # 4


23 Berat jenis material tertahan No.4 gr/cm3
24 Berat material tertahan No.4 gr
25 Persen tertahan No.4 %
26 Berat isi maksimum terkoreksi gr/cm3

Cheked and Approved by


Made and Submitted by Checked and Approved By Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
P.T. ADHI KARYA (Persero) FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Rr. Atit Salma Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST, MT
Quality Control RESIDENT ENGINEER NIP. 198809172201012 2 004

DATE DATE DATE

Known and Approved by


EMPLOYER
PT. ADHI KARYA (PERSERO) TBK
DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:


(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

INSPECTION SAND CONE TEST

Location : Date :
Kind of Material : PIC :
Number of track : NUMBER OF SANCONE : S2

No
1 Weight of Sand + Tube + Cone ( Before ) gr
2 Weight of sand residu + tube + cone (After ) gr
3 Weight of sand in cone & Hole ( 1- 2 ) gr
4 Wight of sand in cone gr 1820 1820 1820
5 Weight of sand in hole ( 3 - 4 ) gr
6 Unit weight of sand ∂p gr 1.443 1.443 1.443
7 Vulume of hole ( 5 / 6(∂p) cm3
8 Weight of wet sand + tare gr
9 Weight of tare gr
10 weight of wet sand ( 8 - 9 ) gr
11 Unit weight of wet sand ( 10 / 7 ) gr/cm3
12 Moisture content %
13 Unit weight of dry sand 11 / ( 1+(12/100)) gr/cm3
14 Optimum Moisture Content ( OMC ) %
15 Weight of dry sand Max lab gr/cm3
16 Percentage of dry density 13 / 15 ) x 100 %
Kadar Air
17 Weight of wet sand + tube gr
18 Weight of dry sand +tube gr
19 weight of tube gr
20 Weight of water 17-18 gr
21 Weight of dry sand 18 - 19 gr
22 Mositure content 20/21 X 100% %

Correction of sieve refined No # 4


23 Specific gravity refined material No.4 gr/cm3
24 Weight of refined No.4 gr
25 Percentage refined No.4 %
26 Correction of unit weight maximum gr/cm3

Cheked and Approved by


Made and Submitted by Checked and Approved By Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
P.T. ADHI KARYA (Persero) FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Rr. Atit Salma Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST, MT
Quality Control RESIDENT ENGINEER NIP. 198809172201012 2 004

DATE DATE DATE

Known and Approved by


EMPLOYER
PT. ADHI KARYA (PERSERO) TBK
DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:


(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

INSPECTION SAND CONE TEST

Location : Date :
Kind of Material : PIC :
Number of track : NUMBER OF SANCONE : s1

No
1 Weight of Sand + Tube + Cone ( Before ) gr
2 Weight of sand residu + tube + cone (After ) gr
3 Weight of sand in cone & Hole ( 1- 2 ) gr
4 Wight of sand in cone gr 1775 1775 1775
5 Weight of sand in hole ( 3 - 4 ) gr
6 Unit weight of sand ∂p gr 1.443 1.443 1.443
7 Vulume of hole ( 5 / 6(∂p) cm3
8 Weight of wet sand + tare gr
9 Weight of tare gr
10 weight of wet sand ( 8 - 9 ) gr
11 Unit weight of wet sand ( 10 / 7 ) gr/cm3
12 Moisture content %
13 Unit weight of dry sand 11 / ( 1+(12/100)) gr/cm3
14 Optimum Moisture Content ( OMC ) %
15 Weight of dry sand Max lab gr/cm3
16 Percentage of dry density 13 / 15 ) x 100 %
Kadar Air
17 Weight of wet sand + tube gr
18 Weight of dry sand +tube gr
19 weight of tube gr
20 Weight of water 17-18 gr
21 Weight of dry sand 18 - 19 gr
22 Mositure content 20/21 X 100% %

Correction of sieve refined No # 4


23 Specific gravity refined material No.4 gr/cm3
24 Weight of refined No.4 gr
25 Percentage refined No.4 %
26 Correction of unit weight maximum gr/cm3

Cheked and Approved by


Made and Submitted by Checked and Approved By Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
P.T. ADHI KARYA (Persero) FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Rr. Atit Salma Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST, MT
Quality Control RESIDENT ENGINEER NIP. 198809172201012 2 004

DATE DATE DATE

Known and Approved by


EMPLOYER