Cmpak 2021 Nps Operational and Expansion Scope Preliminary Acceptance Test Procedure
Cmpak 2021 Nps Operational and Expansion Scope Preliminary Acceptance Test Procedure
Cmpak 2021 Nps Operational and Expansion Scope Preliminary Acceptance Test Procedure
Site ID 6463
PROCEDURE
Region: Central-2
City: Bhakar
SiteCo-ordinates:
PATdate:
Site Scenario
No. Check That Result
3 All bolts, especially the bolts used for electrical connections, are fully □ Yes □ No
tightened. Flat washers and spring washers are all installed in correct
sequence.
2) EnvironmentalChecks
2 There are no adhesive tapes, cable ties, paper scraps, or packing materials □ Yes □ No
around the cabinet.
NPS Operational and Expansion Scope 2021
Site ID 6463
3) ElectricalConnections
1 All the ground cables prepared onsite contain copper core wires and have correct □ Yes □ No
diameters. No switches or fuses are installed on the cables and no short-circuit occurs.
2 Ground cables, AC input power cables, and internal cables are connected in accordance □ Yes □ No
with the circuit diagram and screws are fully tightened. No short-circuit occurs on power
inputs or outputs.
3 Power cables and ground cables are not coiled and extra parts are cut off. □ Yes □ No
4 Connectors for power cables and ground cables are soldered or crimped securely. □ Yes □ No
5 Bare cables and terminal handles are completely wrapped with heat-shrink tubing’s. □ Yes □ No
6 Flat washers and spring washers are securely installed for all OT terminals, and all OT □ Yes □ No
terminals are intact and properly connected.
4) Cablechecklists
1 All cable joints are secured properly, especially signal cables and the cables to the □ Yes □ No
bottom of the cabinet.
2 Cables are bound neatly, and cable ties are secured evenly and properly in the same □ Yes □ No
direction.
3 Power cables, protection cables, and signal cables are bound separately. □ Yes □ No
4 Cables are routed in a way convenient for maintenance and capacity expansion. □ Yes □ No
5 The cable tie tails on indoor cables are cut smoothly from the root, and the cable tie tails □ Yes □ No
on outdoor cables are cut with a margin of 3 mm to 5 mm.
7. All the electrical power cables must be connected tightly as per Standard procedures □ Yes □ No
8 Battery cabinets must be connected from the rectifiers with dual cables as per BOQ if □ Yes □ No
applicable
NPS Operational and Expansion Scope 2021
Site ID 6463
1 Temperature and Humidity sensors are installed correctly on TEM-HUM Port of □ Yes □ No
UIM02C/SIU Card of rectifier and working
2 Smoke sensors are installed correctly on Smoke port of the UIM02C/SIU Card of □ Yes □ No
rectifier and working
3 Liquid Level Sensor are installed correctly on Water/RS485-1 port of the □ Yes □ No
UIM02C/SIU Card of rectifier and working
4 Wireless DCMB have installed in case of cascading Rectifier and Sensing □ Yes □ No □ NA
current of Old rectifier cabinet DC load
5 MS/Existing Power (connection of old rectifier with Cascading Rectifier) must □ Yes □ No □ NA
be visible on RMS.
6 Lithium-Ion batteries have correctly installed within Cabinets as per Plan □ Yes □ No
7 Communication cables between the Li Batteries and from Li batteries to rectifier □ Yes □ No
correctly installed
8 Grounding cable for the Li Batteries installed for each Li Battery □ Yes □ No
9 Battery cabinet properly installed and communicating with the existing/New □ Yes □ No
Rectifier from CAN/RS485 port of SMU02C/SIU port to COM_IN port of first
installed battery
10 RMS connectivity cable properly installed and site is Visible on RMS NOC for □ Yes □ No
Monitoring and configuration
11 In Case of DG control for sites belonging to NPS/NOMC scope, the DG control □ Yes □ No □ NA
board properly installed and control the DG via Rectifier upon Voltage based
control setting Start Check
12 Battery cabinet door Alarm cable properly lay between the battery cabinet door □ Yes □ No □ NA
sensor to UIM02C/SIU Board DIN4/Door ALM port
13 DC Air Con Communication cable properly installed between Battery cabinet □ Yes □ No □ NA
COM_IN port to COM port of UIM02C/SIU RS485 port of rectifier
16 In case of existing batteries are Lithium 50/100/150/200Ah the New lithium □ Yes □ No □ NA
batteries can support
17 Battery cabinet material Galvanized Steel Sheet Minimum of >=1 mmHigher will be Yes □ No □ NA
better & Insulation should be sandwiched between two Steel sheets (outer >=1mm)
19 Copper bus bar (99.999% Pure Copper), Proper copper bus bar with sufficient holes for Yes □ No □ NA
cable termination of 10 x Liion cells both for +ive and -ive terminals.
20 Hidden Lock defined in the section (Cabinet Doors). To prevent door opening and Lock Yes □ No □ NA
shouldn’t be easily accessible for cutting.Multiple Livers Locking System for Cabinet
Doors.
21 Provision of Proper Mechanism for stainless steel Cage installation insideorOutside the Yes □ No □ NA
Cabinet.
22 SPD (Surge Protection Device) (Check Color on front of SPD shall be GREEN, In case
Yes □ No □ NA
of RED/BLACK, it is declared to be faulty)
1 RMS port shifted from old rectifier cabinet to new rectifier cabinet □ Yes □ No
3 WIM/GMU card unit is properly power up from LLVD2 breaker of rectifier. □ Yes □ No
4 WIM/GMUcard connectivity with SMU02C (GE port of WIM card to FE port □ Yes □ No □ NA
of SMU02C)
16 Wireless DCM BoX and Sensors Correctly installed and working □ Yes □ No □ NA
20 Ct's and voltage of ACMeter installed in MCCB for mains and in DG ATS for DG □ Yes □ No □ NA
3 Setting the time zone. Set this parameter to the local time zone. □ Yes □ No
4 Set the date and time Set this parameter to the local date and time. □ Yes □ No
ALARMS TESTING
1 Main Failure □ Yes □ No
2 DC under voltage alarm □ Yes □ No
3 Rectifier module Fault alarm □ Yes □ No
4 Fuse burn Out alarm □ Yes □ No
5 High Temperature alarm □ Yes □ No
6 Fire/Smoke alarm □ Yes □ No
7 Water Leakage alarm □ Yes □ No
8 Battery/Rectifier cabinet door open alarm □ Yes □ No
10 Fuse burn Out alarm (Switch off any breaker with DC load connected to generate.
□ Yes □ No
Make sure to choose breaker with secondary load to avoid any outage in service.)
Note: - In case of Re-use Existing rectifier, the cascading and Old rectifier alarms must
be cascaded
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
CMPAK
Team Lead – Rollout Team Lead - FOPS
Name: Name:
Signature: Signature:
Date: Date:
Signature: Signature:
Date: Date: